200 Folsom St
San Francisco permit 202211186863 · Financial District/South Beach
Priority project-mayor dir 17-02(100% affordable): erect a 17-story, type 1-a, mixed use building with 184 units.
- Filed
- Nov 18, 2022
- Issued
- Nov 17, 2023 (12 months after filing)
- Completed
- Not completed yet
For comparison, San Francisco permits with the same review (full plan review) filed in 2022 typically took 12 months to be issued (median of 872 issued permits).
- Review stops
- 268 stops across 9 departments
- Comments issued
- 41 times, by Building Inspection, Public Utilities, Public Works, Permit Center, Redevelopment, Fire Department, Mayor's Office on Disability
- Put on hold
- 9 times
Main permit
| Review stop | Arrived | Finished | Result |
|---|---|---|---|
Central Permit Bureau Building Inspection · CPB | Nov 18, 2022 | Nov 22, 2022 | — |
CON CON-BOND | Nov 22, 2022 | Apr 10, 2023 | — |
Redevelopment review Redevelopment · REDEV | Nov 22, 2022 | Oct 4, 2023 | Approved |
Disability access review Mayor's Office on Disability · MOD | Nov 22, 2022 | Jul 10, 2023 | — |
Building plan review Building Inspection · BLDG | Nov 22, 2022 | Aug 24, 2023 | Issued Comments |
Fire prevention review Fire Department · SFFD | Nov 22, 2022 | Sep 1, 2023 | Approved-Stipulated |
Street use and mapping Public Works · DPW-BSM | Nov 22, 2022 | Sep 27, 2023 | Approved-Stipulated |
Public Utilities Commission review Public Utilities · SFPUC | Nov 22, 2022 | Jan 23, 2023 | — |
Public health review Public Health · HEALTH | Nov 22, 2022 | Dec 21, 2022 | — |
Public Health HEALTH-HM | Nov 22, 2022 | Nov 30, 2022 | — |
Public Health HEALTH-MH | Nov 22, 2022 | Jan 11, 2023 | — |
Permit Processing Center Building Inspection · PPC | Nov 22, 2022 | Nov 14, 2023 | Administrative |
Public health review Public Health · HEALTH | Nov 23, 2022 | Aug 29, 2023 | Administrative |
Building plan review Building Inspection · BLDG | Aug 24, 2023 | Aug 24, 2023 | Approved |
Building plan review Building Inspection · BLDG | Aug 24, 2023 | Aug 24, 2023 | Approved |
Disability access review Mayor's Office on Disability · MOD | Oct 4, 2023 | Oct 6, 2023 | Approved |
Street use and mapping Public Works · DPW-BSM | Oct 4, 2023 | Oct 12, 2023 | Approved |
Public Utilities Commission review Public Utilities · SFPUC | Oct 4, 2023 | Oct 13, 2023 | Issued Comments |
Public Health HEALTH-HM | Oct 4, 2023 | Oct 4, 2023 | Approved |
Public Health HEALTH-MH | Oct 4, 2023 | Oct 6, 2023 | Approved |
Disability access review Mayor's Office on Disability · MOD | Oct 5, 2023 | Oct 6, 2023 | Approved |
Development fee collection Building Inspection · DFCU | Oct 12, 2023 | Oct 12, 2023 | Administrative |
Public Utilities Commission review Public Utilities · SFPUC | Nov 14, 2023 | Nov 14, 2023 | Approved |
Central Permit Bureau Building Inspection · CPB | Nov 14, 2023 | Nov 17, 2023 | Administrative |
Addendum 1: Department of public health: article 22a
| Review stop | Arrived | Finished | Result |
|---|---|---|---|
Central Permit Bureau Building Inspection · CPB | Dec 22, 2023 | Dec 22, 2023 | Administrative |
Public health review Public Health · HEALTH | Dec 22, 2023 | Dec 28, 2023 | Approved |
Permit Processing Center Building Inspection · PPC | Dec 22, 2023 | Dec 28, 2023 | — |
Central Permit Bureau Building Inspection · CPB | Dec 28, 2023 | Jun 7, 2024 | Administrative |
Addendum 2: Shoring
| Review stop | Arrived | Finished | Result |
|---|---|---|---|
Permit Center Permit Center · PERMIT-CTR | Jun 14, 2024 | Jun 27, 2024 | Approved |
Building pre-screening Building Inspection · PRE-BLDG | Jun 18, 2024 | Jun 18, 2024 | Approved |
Mechanical pre-screening Building Inspection · PRE-MECH | Jun 20, 2024 | Jun 20, 2024 | Not Applicable |
Electrical pre-screening Building Inspection · PRE-MECH-E | Jun 21, 2024 | Jun 21, 2024 | Not Applicable |
Central Permit Bureau Building Inspection · CPB | Jun 27, 2024 | Jun 27, 2024 | Administrative |
Building plan review Building Inspection · BLDG | Jun 27, 2024 | Jul 9, 2024 | Issued Comments |
Street use and mapping Public Works · DPW-BSM | Jun 27, 2024 | Jul 10, 2024 | Approved-Stipulated |
Permit Processing Center Building Inspection · PPC | Jun 27, 2024 | Jul 15, 2024 | Administrative |
Building plan review Building Inspection · BLDG | Jul 15, 2024 | Jul 15, 2024 | Approved |
Central Permit Bureau Building Inspection · CPB | Jul 15, 2024 | Jul 16, 2024 | Administrative |
Addendum 3: Foundation / superstructure
| Review stop | Arrived | Finished | Result |
|---|---|---|---|
Central Permit Bureau Building Inspection · CPB | Jan 3, 2024 | Jan 3, 2024 | Administrative |
Building plan review Building Inspection · BLDG | Jan 3, 2024 | Jan 9, 2024 | Administrative |
Street use and mapping Public Works · DPW-BSM | Jan 3, 2024 | Jan 17, 2024 | Issued Comments |
Redevelopment review Redevelopment · REDEV | Jan 3, 2024 | Feb 29, 2024 | Approved |
Permit Processing Center Building Inspection · PPC | Jan 3, 2024 | Apr 25, 2024 | — |
Building plan review Building Inspection · BLDG | Jan 25, 2024 | Feb 16, 2024 | Issued Comments |
Street use and mapping Public Works · DPW-BSM | Feb 8, 2024 | Feb 8, 2024 | Approved-Stipulated |
Building plan review Building Inspection · BLDG | Apr 19, 2024 | Apr 22, 2024 | Approved |
Street use and mapping Public Works · DPW-BSM | Apr 22, 2024 | Apr 24, 2024 | Approved |
Redevelopment review Redevelopment · REDEV | Apr 22, 2024 | Apr 24, 2024 | Approved |
Central Permit Bureau Building Inspection · CPB | Apr 25, 2024 | Jun 7, 2024 | Administrative |
Addendum 4: Architecture
| Review stop | Arrived | Finished | Result |
|---|---|---|---|
Permit Center Permit Center · PERMIT-CTR | Jan 19, 2024 | Jan 31, 2024 | Issued Comments |
Building pre-screening Building Inspection · PRE-BLDG | Jan 25, 2024 | Jan 25, 2024 | Approved |
Mechanical pre-screening Building Inspection · PRE-MECH | Jan 25, 2024 | Jan 25, 2024 | Approved |
Permit Center Permit Center · PERMIT-CTR | Feb 2, 2024 | Feb 2, 2024 | Approved |
Central Permit Bureau Building Inspection · CPB | Feb 2, 2024 | Feb 2, 2024 | Administrative |
Redevelopment review Redevelopment · REDEV | Feb 2, 2024 | Mar 8, 2024 | Issued Comments |
Building plan review Building Inspection · BLDG | Feb 2, 2024 | Feb 15, 2024 | Issued Comments |
Mechanical and energy plan review Building Inspection · MECH | Feb 2, 2024 | Feb 14, 2024 | Issued Comments |
Fire prevention review Fire Department · SFFD | Feb 2, 2024 | Mar 9, 2024 | Issued Comments |
Street use and mapping Public Works · DPW-BSM | Feb 2, 2024 | Feb 5, 2024 | Approved-Stipulated |
Public Utilities Commission review Public Utilities · SFPUC | Feb 2, 2024 | Feb 5, 2024 | Approved |
Permit Processing Center Building Inspection · PPC | Feb 2, 2024 | Jul 25, 2024 | Administrative |
Electrical plan review Building Inspection · MECH-E | Feb 5, 2024 | Mar 11, 2024 | Issued Comments |
Building plan review Building Inspection · BLDG | Feb 28, 2024 | Feb 28, 2024 | Issued Comments |
Disability access review Mayor's Office on Disability · MOD | Feb 28, 2024 | Apr 12, 2024 | Issued Comments |
Building plan review Building Inspection · BLDG | Apr 22, 2024 | May 14, 2024 | Approved |
Building plan review quality control Building Inspection · BLDG-QC | Apr 23, 2024 | Apr 23, 2024 | Administrative |
Disability access review Mayor's Office on Disability · MOD | May 16, 2024 | Jun 20, 2024 | Approved |
Mechanical and energy plan review Building Inspection · MECH | May 16, 2024 | May 16, 2024 | Approved |
Electrical plan review Building Inspection · MECH-E | May 16, 2024 | May 20, 2024 | Approved |
Fire prevention review Fire Department · SFFD | May 16, 2024 | May 28, 2024 | Issued Comments |
Street use and mapping Public Works · DPW-BSM | May 16, 2024 | May 20, 2024 | Approved |
Public Utilities Commission review Public Utilities · SFPUC | May 16, 2024 | May 17, 2024 | Approved |
Redevelopment review Redevelopment · REDEV | Jun 14, 2024 | Jun 20, 2024 | Issued Comments |
Fire prevention review Fire Department · SFFD | Jun 14, 2024 | Jun 17, 2024 | Approved |
Mechanical and energy plan review Building Inspection · MECH | Jun 14, 2024 | Jun 18, 2024 | Approved |
Electrical plan review Building Inspection · MECH-E | Jun 14, 2024 | Jun 17, 2024 | Approved |
Street use and mapping Public Works · DPW-BSM | Jun 14, 2024 | Jun 17, 2024 | Approved-Stipulated |
Public Utilities Commission review Public Utilities · SFPUC | Jun 14, 2024 | Jun 21, 2024 | Approved |
Redevelopment review Redevelopment · REDEV | Jul 10, 2024 | Jul 11, 2024 | Approved |
Disability access review Mayor's Office on Disability · MOD | Jul 12, 2024 | Jul 16, 2024 | Approved |
Building plan review Building Inspection · BLDG | Jul 12, 2024 | Jul 16, 2024 | Approved |
Mechanical and energy plan review Building Inspection · MECH | Jul 12, 2024 | Jul 16, 2024 | Approved |
Electrical plan review Building Inspection · MECH-E | Jul 12, 2024 | Jul 17, 2024 | Approved |
Fire prevention review Fire Department · SFFD | Jul 12, 2024 | Jul 16, 2024 | Approved |
Street use and mapping Public Works · DPW-BSM | Jul 12, 2024 | Jul 15, 2024 | Approved-Stipulated |
Public Utilities Commission review Public Utilities · SFPUC | Jul 12, 2024 | Jul 12, 2024 | Approved |
Central Permit Bureau Building Inspection · CPB | Jul 25, 2024 | Jul 29, 2024 | Administrative |
Addendum 5: Mep
| Review stop | Arrived | Finished | Result |
|---|---|---|---|
Permit Center Permit Center · PERMIT-CTR | Jun 27, 2024 | Jul 9, 2024 | Approved |
Building pre-screening Building Inspection · PRE-BLDG | Jun 28, 2024 | Jun 28, 2024 | Approved |
Electrical pre-screening Building Inspection · PRE-MECH-E | Jun 28, 2024 | Jun 28, 2024 | Approved |
Mechanical pre-screening Building Inspection · PRE-MECH | Jul 5, 2024 | Jul 5, 2024 | Approved |
Central Permit Bureau Building Inspection · CPB | Jul 9, 2024 | Jul 9, 2024 | Administrative |
Building plan review Building Inspection · BLDG | Jul 9, 2024 | Jul 10, 2024 | Not Applicable |
Mechanical and energy plan review Building Inspection · MECH | Jul 9, 2024 | Jul 26, 2024 | Issued Comments |
Electrical plan review Building Inspection · MECH-E | Jul 9, 2024 | Aug 22, 2024 | Issued Comments |
Fire prevention review Fire Department · SFFD | Jul 9, 2024 | Jul 31, 2024 | Issued Comments |
Redevelopment review Redevelopment · REDEV | Jul 9, 2024 | Aug 15, 2024 | Approved |
Permit Processing Center Building Inspection · PPC | Jul 9, 2024 | Mar 21, 2025 | Administrative |
Mechanical plan review quality control Building Inspection · MECH-QC | Jul 19, 2024 | Jul 19, 2024 | Administrative |
Building Inspection MECH-E-QC | Aug 21, 2024 | Aug 21, 2024 | Administrative |
Mechanical and energy plan review Building Inspection · MECH | Nov 4, 2024 | Nov 4, 2024 | Issued Comments |
Electrical plan review Building Inspection · MECH-E | Nov 4, 2024 | Nov 8, 2024 | Issued Comments |
Fire prevention review Fire Department · SFFD | Nov 12, 2024 | Nov 12, 2024 | Issued Comments |
Mechanical and energy plan review Building Inspection · MECH | Feb 3, 2025 | Feb 10, 2025 | Issued Comments |
Mechanical and energy plan review Building Inspection · MECH | Feb 25, 2025 | Feb 25, 2025 | Approved |
Fire prevention review Fire Department · SFFD | Feb 25, 2025 | Feb 25, 2025 | Approved |
Electrical plan review Building Inspection · MECH-E | Mar 6, 2025 | Mar 10, 2025 | Approved |
Redevelopment review Redevelopment · REDEV | Mar 11, 2025 | Mar 13, 2025 | Approved |
Central Permit Bureau Building Inspection · CPB | Mar 21, 2025 | Apr 1, 2025 | Administrative |
Addendum 6: Generator and fuel oil
| Review stop | Arrived | Finished | Result |
|---|---|---|---|
Permit Center Permit Center · PERMIT-CTR | Sep 22, 2024 | Oct 4, 2024 | Approved |
Electrical pre-screening Building Inspection · PRE-MECH-E | Sep 27, 2024 | Sep 27, 2024 | Approved |
Mechanical pre-screening Building Inspection · PRE-MECH | Sep 30, 2024 | Sep 30, 2024 | Approved |
Building pre-screening Building Inspection · PRE-BLDG | Oct 4, 2024 | Oct 4, 2024 | Issued Comments |
Building pre-screening Building Inspection · PRE-BLDG | Oct 4, 2024 | Oct 4, 2024 | Approved |
Central Permit Bureau Building Inspection · CPB | Oct 7, 2024 | Oct 7, 2024 | Administrative |
Building plan review Building Inspection · BLDG | Oct 7, 2024 | Oct 25, 2024 | Issued Comments |
Mechanical and energy plan review Building Inspection · MECH | Oct 7, 2024 | Oct 17, 2024 | Approved |
Fire prevention review Fire Department · SFFD | Oct 7, 2024 | Oct 11, 2024 | Issued Comments |
Street use and mapping Public Works · DPW-BSM | Oct 7, 2024 | Oct 8, 2024 | Approved |
Permit Processing Center Building Inspection · PPC | Oct 7, 2024 | Dec 24, 2024 | Administrative |
Redevelopment review Redevelopment · REDEV | Oct 16, 2024 | Oct 22, 2024 | Approved |
Electrical plan review Building Inspection · MECH-E | Oct 25, 2024 | Nov 8, 2024 | Approved |
Building plan review Building Inspection · BLDG | Dec 11, 2024 | Dec 16, 2024 | Issued Comments |
Fire prevention review Fire Department · SFFD | Dec 11, 2024 | Dec 13, 2024 | Issued Comments |
Building plan review Building Inspection · BLDG | Dec 19, 2024 | Dec 20, 2024 | Approved |
Fire prevention review Fire Department · SFFD | Dec 19, 2024 | Dec 23, 2024 | Approved |
Central Permit Bureau Building Inspection · CPB | Dec 24, 2024 | Dec 27, 2024 | Administrative |
Addendum 7: Metal stair
| Review stop | Arrived | Finished | Result |
|---|---|---|---|
Permit Center Permit Center · PERMIT-CTR | Oct 24, 2024 | Nov 4, 2024 | Approved |
Electrical pre-screening Building Inspection · PRE-MECH-E | Oct 25, 2024 | Oct 25, 2024 | Not Applicable |
Building pre-screening Building Inspection · PRE-BLDG | Nov 1, 2024 | Nov 1, 2024 | Approved |
Mechanical pre-screening Building Inspection · PRE-MECH | Nov 4, 2024 | Nov 4, 2024 | Not Applicable |
Central Permit Bureau Building Inspection · CPB | Nov 4, 2024 | Nov 4, 2024 | Administrative |
Building plan review Building Inspection · BLDG | Nov 4, 2024 | Dec 4, 2024 | Issued Comments |
Fire prevention review Fire Department · SFFD | Nov 4, 2024 | Nov 7, 2024 | Approved |
Redevelopment review Redevelopment · REDEV | Nov 4, 2024 | Nov 8, 2024 | Approved |
Permit Processing Center Building Inspection · PPC | Nov 4, 2024 | Dec 10, 2024 | Administrative |
Building plan review Building Inspection · BLDG | Dec 9, 2024 | Dec 9, 2024 | Approved |
Central Permit Bureau Building Inspection · CPB | Dec 10, 2024 | Dec 13, 2024 | Administrative |
Addendum 8: Exterior skin, pre-cast
| Review stop | Arrived | Finished | Result |
|---|---|---|---|
Permit Center Permit Center · PERMIT-CTR | Jan 21, 2025 | Feb 4, 2025 | Approved |
Central Permit Bureau Building Inspection · CPB | Feb 5, 2025 | Feb 5, 2025 | Administrative |
Redevelopment review Redevelopment · REDEV | Feb 5, 2025 | Feb 18, 2025 | Approved |
Building plan review Building Inspection · BLDG | Feb 5, 2025 | Feb 20, 2025 | Issued Comments |
Fire prevention review Fire Department · SFFD | Feb 5, 2025 | Feb 7, 2025 | Approved |
Permit Processing Center Building Inspection · PPC | Feb 5, 2025 | Jun 24, 2025 | Administrative |
Redevelopment review Redevelopment · REDEV | Jun 16, 2025 | Jun 23, 2025 | Approved |
Building plan review Building Inspection · BLDG | Jun 16, 2025 | Jun 16, 2025 | Approved |
Fire prevention review Fire Department · SFFD | Jun 16, 2025 | Jun 17, 2025 | Approved-Stipulated |
Central Permit Bureau Building Inspection · CPB | Jun 24, 2025 | Jul 2, 2025 | Administrative |
Addendum 9: Exterior skin, unitized curtain wall
| Review stop | Arrived | Finished | Result |
|---|---|---|---|
Permit Center Permit Center · PERMIT-CTR | May 8, 2025 | May 20, 2025 | Approved |
Central Permit Bureau Building Inspection · CPB | May 22, 2025 | May 22, 2025 | Administrative |
Redevelopment review Redevelopment · REDEV | May 22, 2025 | May 27, 2025 | Approved |
Building plan review Building Inspection · BLDG | May 22, 2025 | Jun 27, 2025 | Approved |
Structural plan approval Building Inspection · PAD-STR | May 22, 2025 | Jun 27, 2025 | Approved |
Fire Department housing review Fire Department · SFFD-HQ | May 22, 2025 | Jun 23, 2025 | Approved-Stipulated |
Permit Processing Center Building Inspection · PPC | May 22, 2025 | Jul 10, 2025 | Administrative |
Central Permit Bureau Building Inspection · CPB | Jul 10, 2025 | Jul 14, 2025 | Administrative |
Addendum 10: Fire alarm/ 2-way communication system
| Review stop | Arrived | Finished | Result |
|---|---|---|---|
Permit Center Permit Center · PERMIT-CTR | Apr 28, 2025 | May 16, 2025 | Approved |
Central Permit Bureau Building Inspection · CPB | May 16, 2025 | May 16, 2025 | Administrative |
Redevelopment review Redevelopment · REDEV | May 16, 2025 | May 27, 2025 | Approved |
Fire Department housing review Fire Department · SFFD-HQ | May 16, 2025 | Jun 27, 2025 | Issued Comments |
Permit Processing Center Building Inspection · PPC | May 16, 2025 | Nov 24, 2025 | Administrative |
Fire Department housing review Fire Department · SFFD-HQ | Sep 19, 2025 | Sep 19, 2025 | Issued Comments |
Fire Department housing review Fire Department · SFFD-HQ | Oct 27, 2025 | Nov 19, 2025 | Approved-Stipulated |
Redevelopment review Redevelopment · REDEV | Nov 19, 2025 | Nov 21, 2025 | Approved |
Central Permit Bureau Building Inspection · CPB | Nov 24, 2025 | Nov 26, 2025 | Administrative |
Addendum 11: Fire sprinkler
| Review stop | Arrived | Finished | Result |
|---|---|---|---|
Permit Center Permit Center · PERMIT-CTR | Dec 18, 2024 | Dec 30, 2024 | Approved |
Central Permit Bureau Building Inspection · CPB | Dec 30, 2024 | Dec 30, 2024 | Administrative |
Fire prevention review Fire Department · SFFD | Dec 30, 2024 | Jan 16, 2025 | Issued Comments |
Street use and mapping Public Works · DPW-BSM | Dec 30, 2024 | Dec 31, 2024 | Approved |
Permit Processing Center Building Inspection · PPC | Dec 30, 2024 | Mar 11, 2025 | Administrative |
Fire prevention review Fire Department · SFFD | Mar 5, 2025 | Mar 5, 2025 | Approved |
Street use and mapping Public Works · DPW-BSM | Mar 6, 2025 | Mar 11, 2025 | Approved-Stipulated |
Central Permit Bureau Building Inspection · CPB | Mar 11, 2025 | Mar 19, 2025 | Administrative |
Addendum 12: Errcs
| Review stop | Arrived | Finished | Result |
|---|---|---|---|
Permit Center Permit Center · PERMIT-CTR | Jul 15, 2025 | Jul 22, 2025 | Approved |
Central Permit Bureau Building Inspection · CPB | Jul 23, 2025 | Jul 23, 2025 | Administrative |
Fire Department housing review Fire Department · SFFD-HQ | Jul 23, 2025 | Aug 14, 2025 | Issued Comments |
Permit Processing Center Building Inspection · PPC | Jul 23, 2025 | Dec 3, 2025 | Administrative |
Fire Department housing review Fire Department · SFFD-HQ | Oct 3, 2025 | Dec 3, 2025 | Approved |
Central Permit Bureau Building Inspection · CPB | Dec 3, 2025 | Dec 4, 2025 | Administrative |
Addendum 13: Fsae
| Review stop | Arrived | Finished | Result |
|---|---|---|---|
Permit Center Permit Center · PERMIT-CTR | Jan 27, 2026 | Feb 11, 2026 | Approved |
Central Permit Bureau Building Inspection · CPB | Feb 13, 2026 | Feb 13, 2026 | Administrative |
Building plan review Building Inspection · BLDG | Feb 13, 2026 | Feb 26, 2026 | Not Applicable |
Fire Department housing review Fire Department · SFFD-HQ | Feb 13, 2026 | Feb 26, 2026 | Issued Comments |
Permit Processing Center Building Inspection · PPC | Feb 13, 2026 | Mar 19, 2026 | Administrative |
Fire Department housing review Fire Department · SFFD-HQ | Mar 17, 2026 | Mar 17, 2026 | Approved |
Central Permit Bureau Building Inspection · CPB | Mar 19, 2026 | Mar 26, 2026 | Administrative |
Addendum 14: Ebm
| Review stop | Arrived | Finished | Result |
|---|---|---|---|
Permit Center Permit Center · PERMIT-CTR | Dec 29, 2025 | Jan 16, 2026 | Approved |
Central Permit Bureau Building Inspection · CPB | Jan 16, 2026 | Jan 16, 2026 | Administrative |
Building plan review Building Inspection · BLDG | Jan 16, 2026 | Feb 19, 2026 | Approved |
Structural plan approval Building Inspection · PAD-STR | Jan 16, 2026 | Feb 19, 2026 | Approved |
Fire Department housing review Fire Department · SFFD-HQ | Jan 16, 2026 | Jan 26, 2026 | Approved-Stipulated |
Street use and mapping Public Works · DPW-BSM | Jan 16, 2026 | Jan 30, 2026 | Approved |
Permit Processing Center Building Inspection · PPC | Jan 16, 2026 | Feb 19, 2026 | Administrative |
Redevelopment review Redevelopment · REDEV | Jan 27, 2026 | Jan 30, 2026 | Approved |
Central Permit Bureau Building Inspection · CPB | Feb 19, 2026 | Feb 20, 2026 | Administrative |
Addendum 15: Seismic monitoring
| Review stop | Arrived | Finished | Result |
|---|---|---|---|
Permit Center Permit Center · PERMIT-CTR | Mar 23, 2026 | Apr 1, 2026 | Approved |
Central Permit Bureau Building Inspection · CPB | Apr 2, 2026 | Apr 2, 2026 | Administrative |
Building plan review Building Inspection · BLDG | Apr 2, 2026 | Apr 14, 2026 | Approved |
Structural plan approval Building Inspection · PAD-STR | Apr 2, 2026 | Apr 14, 2026 | Approved |
Fire Department housing review Fire Department · SFFD-HQ | Apr 2, 2026 | Apr 6, 2026 | Approved-Stipulated |
Permit Processing Center Building Inspection · PPC | Apr 2, 2026 | Apr 15, 2026 | Administrative |
Central Permit Bureau Building Inspection · CPB | Apr 15, 2026 | Apr 16, 2026 | Administrative |
Addendum 16: Solar pv
| Review stop | Arrived | Finished | Result |
|---|---|---|---|
Permit Center Permit Center · PERMIT-CTR | Dec 16, 2025 | Jan 5, 2026 | Approved |
Central Permit Bureau Building Inspection · CPB | Jan 6, 2026 | Jan 6, 2026 | Administrative |
Building plan review Building Inspection · BLDG | Jan 6, 2026 | Feb 3, 2026 | Issued Comments |
Structural plan approval Building Inspection · PAD-STR | Jan 6, 2026 | Feb 3, 2026 | Issued Comments |
Electrical plan review Building Inspection · MECH-E | Jan 6, 2026 | Jan 15, 2026 | Approved |
Fire Department housing review Fire Department · SFFD-HQ | Jan 6, 2026 | Jan 30, 2026 | Issued Comments |
Permit Processing Center Building Inspection · PPC | Jan 6, 2026 | Apr 10, 2026 | Administrative |
Redevelopment review Redevelopment · REDEV | Jan 27, 2026 | Jan 30, 2026 | Approved |
Fire Department housing review Fire Department · SFFD-HQ | Mar 20, 2026 | Apr 7, 2026 | Approved |
Building plan review Building Inspection · BLDG | Mar 31, 2026 | Mar 31, 2026 | Approved |
Structural plan approval Building Inspection · PAD-STR | Mar 31, 2026 | Mar 31, 2026 | Approved |
Fire Department housing review Fire Department · SFFD-HQ | Apr 7, 2026 | Apr 7, 2026 | Approved |
Redevelopment review Redevelopment · REDEV | Apr 9, 2026 | Apr 10, 2026 | Approved |
Electrical plan review Building Inspection · MECH-E | Apr 9, 2026 | Apr 9, 2026 | Approved |
Central Permit Bureau Building Inspection · CPB | Apr 10, 2026 | Apr 14, 2026 | Administrative |
Addendum 17: Evacuation signage
| Review stop | Arrived | Finished | Result |
|---|---|---|---|
Permit Center Permit Center · PERMIT-CTR | Dec 2, 2025 | Dec 8, 2025 | Approved |
Central Permit Bureau Building Inspection · CPB | Dec 8, 2025 | Dec 8, 2025 | Administrative |
Fire Department housing review Fire Department · SFFD-HQ | Dec 8, 2025 | Dec 16, 2025 | Approved |
Permit Processing Center Building Inspection · PPC | Dec 8, 2025 | Dec 17, 2025 | Administrative |
Central Permit Bureau Building Inspection · CPB | Dec 17, 2025 | Dec 23, 2025 | Administrative |
Addendum 18: Rev/1 to "issued" addendum-3
| Review stop | Arrived | Finished | Result |
|---|---|---|---|
Permit Center Permit Center · PERMIT-CTR | Apr 7, 2025 | Apr 21, 2025 | Approved |
Central Permit Bureau Building Inspection · CPB | Apr 22, 2025 | Apr 22, 2025 | Administrative |
Building plan review Building Inspection · BLDG | Apr 22, 2025 | May 27, 2025 | Issued Comments |
Street use and mapping Public Works · DPW-BSM | Apr 22, 2025 | Apr 23, 2025 | Approved |
Redevelopment review Redevelopment · REDEV | Apr 22, 2025 | Apr 25, 2025 | Approved |
Permit Processing Center Building Inspection · PPC | Apr 22, 2025 | Jul 18, 2025 | Administrative |
Building plan review Building Inspection · BLDG | Jul 17, 2025 | Jul 17, 2025 | Approved |
Central Permit Bureau Building Inspection · CPB | Jul 18, 2025 | Jul 21, 2025 | Administrative |
Addendum 19: Rev/1 to "issued"add 4
| Review stop | Arrived | Finished | Result |
|---|---|---|---|
Permit Center Permit Center · PERMIT-CTR | Aug 27, 2025 | Sep 10, 2025 | Approved |
Central Permit Bureau Building Inspection · CPB | Sep 11, 2025 | Sep 11, 2025 | Administrative |
Redevelopment review Redevelopment · REDEV | Sep 11, 2025 | Sep 19, 2025 | Approved |
Building plan review Building Inspection · BLDG | Sep 11, 2025 | Sep 25, 2025 | Issued Comments |
Mechanical and energy plan review Building Inspection · MECH | Sep 11, 2025 | Sep 26, 2025 | Approved |
Fire Department housing review Fire Department · SFFD-HQ | Sep 11, 2025 | Sep 29, 2025 | Issued Comments |
Street use and mapping Public Works · DPW-BSM | Sep 11, 2025 | Sep 15, 2025 | Approved |
Urban forestry Public Works · DPW-BUF | Sep 11, 2025 | Oct 29, 2025 | Approved |
Public Utilities Commission review Public Utilities · SFPUC | Sep 11, 2025 | Sep 12, 2025 | Approved |
Public Health HEALTH-MH | Sep 11, 2025 | Sep 24, 2025 | Approved |
Permit Processing Center Building Inspection · PPC | Sep 11, 2025 | Dec 23, 2025 | Administrative |
Building plan review Building Inspection · BLDG | Sep 25, 2025 | Sep 25, 2025 | Administrative |
Fire Department housing review Fire Department · SFFD-HQ | Nov 19, 2025 | Nov 19, 2025 | Approved |
Redevelopment review Redevelopment · REDEV | Nov 26, 2025 | Dec 10, 2025 | Approved |
Building plan review Building Inspection · BLDG | Nov 26, 2025 | Dec 9, 2025 | Approved |
Mechanical and energy plan review Building Inspection · MECH | Nov 26, 2025 | Dec 2, 2025 | Approved |
Street use and mapping Public Works · DPW-BSM | Nov 26, 2025 | Dec 1, 2025 | Approved |
Urban forestry Public Works · DPW-BUF | Nov 26, 2025 | Dec 5, 2025 | Approved |
Public Utilities Commission review Public Utilities · SFPUC | Nov 26, 2025 | Dec 4, 2025 | Approved |
Public Health HEALTH-MH | Nov 26, 2025 | Dec 1, 2025 | Approved |
Central Permit Bureau Building Inspection · CPB | Dec 23, 2025 | Dec 24, 2025 | Administrative |
Addendum 20: Rev /1 to approved s-5 plumbing
| Review stop | Arrived | Finished | Result |
|---|---|---|---|
Permit Center Permit Center · PERMIT-CTR | Aug 6, 2025 | Aug 20, 2025 | Issued Comments |
Permit Center Permit Center · PERMIT-CTR | Oct 3, 2025 | Oct 17, 2025 | Approved |
Central Permit Bureau Building Inspection · CPB | Oct 20, 2025 | Oct 20, 2025 | Administrative |
Redevelopment review Redevelopment · REDEV | Oct 20, 2025 | Oct 23, 2025 | Approved |
Street use and mapping Public Works · DPW-BSM | Oct 20, 2025 | Oct 27, 2025 | Approved |
Urban forestry Public Works · DPW-BUF | Oct 20, 2025 | Oct 29, 2025 | Approved |
Public Utilities Commission review Public Utilities · SFPUC | Oct 20, 2025 | Oct 22, 2025 | Not Applicable |
Permit Processing Center Building Inspection · PPC | Oct 20, 2025 | Nov 4, 2025 | Administrative |
Central Permit Bureau Building Inspection · CPB | Nov 4, 2025 | Nov 7, 2025 | Administrative |
Addendum 21: Rev/2 to approved s5 mechanical in child care center
| Review stop | Arrived | Finished | Result |
|---|---|---|---|
Permit Center Permit Center · PERMIT-CTR | Feb 18, 2026 | Mar 6, 2026 | Approved |
Central Permit Bureau Building Inspection · CPB | Mar 9, 2026 | Mar 9, 2026 | Administrative |
Building plan review Building Inspection · BLDG | Mar 9, 2026 | Mar 26, 2026 | Not Applicable |
Mechanical and energy plan review Building Inspection · MECH | Mar 9, 2026 | Mar 17, 2026 | Approved |
Electrical plan review Building Inspection · MECH-E | Mar 9, 2026 | Mar 13, 2026 | Not Applicable |
Fire Department housing review Fire Department · SFFD-HQ | Mar 9, 2026 | Mar 24, 2026 | Approved |
Permit Processing Center Building Inspection · PPC | Mar 9, 2026 | Mar 27, 2026 | Administrative |
Central Permit Bureau Building Inspection · CPB | Mar 27, 2026 | Apr 1, 2026 | Administrative |
Source: DataSF 87xy-gk8d (Building Permit Addenda with Routing), retrieved Nov 6, 2026. Reviewer names and notes are left out.
- Permit type
- New construction
- Status
- Issued
- Estimated cost
- $74,471,078
| Name | Role | License on permit |
|---|---|---|
| Owen Cheatham Kennerly Kennerly Architecture | Architect | C29565 |
San Francisco Department of Building Inspection, the official record
- DataSF Building PermitsAddress, scope, cost, dates and statusRetrieved Nov 5, 2026
- DataSF Building Permit ContactsArchitects and engineers named on the permitRetrieved Nov 5, 2026
- DataSF Building Permit Addenda with RoutingPlan review stops and resultsRetrieved Nov 6, 2026
- Google Street ViewStreet photoTaken Jul 2024