CheckMyDesigner

Questions to ask an architect before you sign

Last checked Nov 6, 2026

The questions at a glance

Bring these to your meeting with an architect or designer. Each one comes with why it matters and how to check the answer in public records, so you can compare candidates on facts.

The questions, one by one

  1. 1. Are you licensed in California? What is your license number?

    Why it matters: Only a licensed architect may use the title “architect” or “architectural designer” (B&P Code §5536). A building designer without a license can still draw some projects, so the answer tells you what you're hiring, not whether it's allowed.

    How to check: Look the number up on the architect license lookup and confirm the name, license type and status match.

  2. 2. Who will stamp the drawings, and who does the structural engineering?

    Why it matters: If part of your project departs from conventional wood framing, the city must require drawings for that part stamped by a licensed architect or engineer (B&P Code §5537). That person is often a separate structural engineer.

    How to check: Get the engineer's name and license number, and look them up on the engineer license lookup.

  3. 3. Have you done projects like mine in San Francisco?

    Why it matters: Experience with the same kind of work, such as an ADU, an addition or a seismic retrofit, is easier to judge than a general portfolio.

    How to check: Ask for the permit numbers or addresses. Permits are public, and our reports list the San Francisco permits that name a licensed person.

  4. 4. How long did your recent permits take, and what kind of review did they go through?

    Why it matters: Over-the-counter permits and permits that go through full plan review can take very different amounts of time, so compare like with like.

    How to check: Compare their answer with their permit history in our report, which shows each permit's review type and how long it took.

  5. 5. Will we sign a written contract before you start?

    Why it matters: A licensed architect must use a written contract, signed before work begins, with a few exceptions (B&P Code §5536.22). The list below shows what it must include.

    How to check: Read the contract against that list before you sign.

  6. 6. What happens if the city asks for changes during plan check?

    Why it matters: The architect's contract must describe how additional services and changes to the project, services or fees are handled (B&P Code §5536.22).

    How to check: Ask whether answering plan check comments is part of the fee, and find where the contract says so.

  7. 7. Who owns the drawings when the project is done?

    Why it matters: The contract must include a statement on the ownership and use of the drawings and other documents the architect prepares (B&P Code §5536.22).

    How to check: Find that statement in the contract and make sure you understand it.

  8. 8. Has a licensing board ever taken action against you?

    Why it matters: Board actions such as citations or discipline are public records.

    How to check: Don't rely on the answer alone. The license record on DCA License Search shows public record and disciplinary actions.

What an architect's written contract must include

Under B&P Code §5536.22, a licensed architect's contract must include at least:

  • A description of the project.
  • A description of the services the architect will provide.
  • How the architect will be paid, and the payment method you both agree on.
  • The architect's name, address and license number, your name and address, and the project address.
  • How additional services and changes to the project, services or fees will be handled.
  • How either of you can end the contract.
  • Who owns, and may use, the drawings and other documents the architect prepares.
  • A notice that architects are licensed and regulated by the California Architects Board.

The law lists exceptions, for example when the work is unpaid or you knowingly waive a written contract in writing. A building designer without a license isn't covered by this section. See architect vs building designer.

Statutes quoted from the official California Legislative Information site, checked Nov 5, 2026. This is general information, not legal advice.

Check the name on your proposal

See their license status, board actions and the firms they've worked under.

For example “Jordan Lee” or C-34567.

More guides

All guides