Alfonso Norman Aguilera
Engineer · Public Works - Sf · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeCivil Engineer C-84697First issued Dec 15, 2015, expires Mar 31, 2028.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 9 permits since 2023, 9 in the last 5 years. Latest filed Nov 3, 2026.
- What kind of projects?
- Retaining wall or site work 7 · Home remodel 1 · New building 1
- How long do their permits take?
- Retaining wall or site work: 9 months. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Retaining wall or site work: 7 permits in San Francisco
Time to get a permit
Median from filing to permit, from 6 issued permits filed since 1966; 1 still in review. City is the San Francisco median for the same kind of review, from 9,405 permits.
Where
- Tenderloin5
- Financial District/South Beach2
Most recent
- 301 Geary StSelective demo and replacement on basement roof slab, concrete sidewalk toping slab and curb ramp replacment. installation of traffic signal and street liight pol with corbel like support on basement wall. no work to facade of building.Nov 12, 2024Issued
- 246 Powell StDemolish and replacement of concrete sidewalk topping slab and curb ramps. surface mounting of pedestrian push button. no work to facade or buildingNov 12, 2024Filed
- 200 Powell StReplacement of concrete sidewalk topping & regrading of curbramps, installation of steel st light & traffic signal pole w/ steel column support in basement. no work to the building nor facadeOct 28, 2024Issued
- 111 Ellis St #0Replacement of brick pavers & curbramp, installation of steel streetlight and steel pole support in basement.Oct 9, 2024Issued
- 101 Powell StTopping sidewalk replacement. installation of traffic signals and support in basement area. installation of traffic signal pedestal and cabinet at sidewalk level.Oct 9, 2024Issued
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Nov 3, 2026 | 353 Kearny St Demoliton and recontruction of the sub-sidewalak basement roof slab. Filed | Home remodel | Filed | — | |
| Mar 17, 2026 | 201 Powell St Revision 202410283844 to include removing (n) column from design and framing to (e) column Filed | Revision or supplement | Filed | — | |
| Feb 25, 2026 | 999 Unknown Proj-25-0626; sfpuc-mou: to erect 2 stories, no basement, type ii-b, office building. moccasin engineering & records building: demo & removal of (3) one-story trailers, (e) site work, upper parking lot, pavement, irrigation & utilities. construct new two-story engineering & records building, Approved | New building | Approved | — | |
| Nov 12, 2024 | 301 Geary St Selective demo and replacement on basement roof slab, concrete sidewalk toping slab and curb ramp replacment. installation of traffic signal and street liight pol with corbel like support on basement wall. no work to facade of building. Issued | Retaining wall or site work | Issued | 9 months | |
| Nov 12, 2024 | 246 Powell St Demolish and replacement of concrete sidewalk topping slab and curb ramps. surface mounting of pedestrian push button. no work to facade or building Filed | Retaining wall or site work | Filed | — | |
| Oct 28, 2024 | 200 Powell St Replacement of concrete sidewalk topping & regrading of curbramps, installation of steel st light & traffic signal pole w/ steel column support in basement. no work to the building nor facade Issued | Retaining wall or site work | Issued | 9 months | |
| Oct 9, 2024 | 111 Ellis St #0 Replacement of brick pavers & curbramp, installation of steel streetlight and steel pole support in basement. Issued | Retaining wall or site workType unconfirmed | Issued | 10 months | |
| Oct 9, 2024 | 101 Powell St Topping sidewalk replacement. installation of traffic signals and support in basement area. installation of traffic signal pedestal and cabinet at sidewalk level. Issued | Retaining wall or site work | Issued | 10 months | |
| Sep 5, 2023 | 1 Taylor St Demo & replacement of topping sidewalk, partial demo of basement roof slab & reconstruction w/traffic signal foundation concrete below Issued | Retaining wall or site workType unconfirmed | Issued | Within 1 month | |
| Sep 5, 2023 | 1182 Market St Concrete topping sidewalk replacement & removal of (e) traffic signal pole Cancelled | Retaining wall or site work | Cancelled | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Alfonso Norman Aguilera? Request a correction.