Alicia Hergenroeder
Architect · Practice Makes Architecture
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-38814First issued Oct 2, 2020, expires Aug 31, 2027.
Source: DCA License Search, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 13 permits since 2020, 13 in the last 5 years. Latest filed Aug 25, 2026.
- What kind of projects?
- Home remodel 7 · Addition 2 · ADU 1
- How long do their permits take?
- Home remodel: 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 7 permits in San Francisco
Time to get a permit
Median from filing to permit, from 5 issued permits filed since 1966; 1 still in review. City is the San Francisco median for the same kind of review, from 15,396 permits.
Where
- Noe Valley2
- Potrero Hill2
- Inner Sunset1
- Glen Park1
Most recent
- 639 Belvedere St3/f: convert (e) single bath to (2) full baths. new stacked laundry closet. new shearwall. add new skylight and 1-hr rated parapet at roof level. voluntary framing upgrade at garage.Apr 29, 2025Complete
- 933 Noe StRemodel (e) kitchen. reconfigure rear bedroom and bath. add (n) folding door at rear facade. repair dryrot. replace (e) wood deck with (n) wood deck. framed to current cbu standards.Jul 10, 2024Filed
- 1125 Rhode Island StUpgrade partial foundation & ground lvl shear walls, repair & replace sog in-kind where req'd, convert 370 sqft of unconditioned gr lvl to conditioned space to contain laundry, storage, utility closets and new bath, add new windows in lightwell, replace exterior doors at ground floor in-kind,...Sep 1, 2023Complete
- 933 Noe StRemodel (e) bath: replace finishes, fixtures, remove (e) window & add (n) window in showerAug 17, 2022Complete
- 2734 Diamond StReconfigure extg kitchen and upgrade with new finishes. replace extg windows and door with new french door and window at side of house. frame as needed to support new openings. (not visible from street)Jun 28, 2022Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Aug 25, 2026 | 4634 03rd St Interior t. i. for legal aid org. reconfigure conference room, replace flooring throughout (including washroom (#106) and breakroom (105), install privacy portion wall for work areas, reception desk, install new high efficacy lighting throughout. no phone booths. 9/10/26 az Issued | Commercial or tenant improvement | Issued | 1 month | |
| Jul 10, 2026 | 2880 21st St On rear dwelling unit (2880 21st st) convert (e) uninhabited roof plane to usable space to include: acess stair to roof plane. 330 gross sq ft addition to contain: 1 bdr,1 ba, 215 useable sqft roof deck, 60 sqft fixed planter,electrical,mechanical,plumbing sprinkler work associated with the addition Filed | Addition | Filed | — | |
| Sep 12, 2025 | 600 Montgomery St #0 22nd fl - revision to pa202504114245 for relocation of fire smoke dampers Complete | Revision or supplement | Complete | Within 1 month | |
| Apr 29, 2025 | 639 Belvedere St 3/f: convert (e) single bath to (2) full baths. new stacked laundry closet. new shearwall. add new skylight and 1-hr rated parapet at roof level. voluntary framing upgrade at garage. Complete | Home remodelType unconfirmed | Complete | 1 month | |
| Nov 12, 2024 | 2105 20th St Revision: 1) (n) egress and common path of travel to (n) gate location. 2) inclusion of (n) rear yard slab. revision for permit 202011199318 Complete | Revision or supplement | Complete | Within 1 month | |
| Jul 10, 2024 | 933 Noe St Remodel (e) kitchen. reconfigure rear bedroom and bath. add (n) folding door at rear facade. repair dryrot. replace (e) wood deck with (n) wood deck. framed to current cbu standards. Filed | Home remodel | Filed | — | |
| Nov 8, 2023 | 57 Joost Av Remove (e) damaged rear decks. add (n) 155sqft rear deck accessible from upper lvl. add (n) 217sqft rear deck at grade lvl. repair dryrot at rear facade & replace siding in-kind. add (n) windows & doors at rear facade. convert grd lvl storage rm to 630 sqft gross conditioned secondary kitchenette... Complete | AdditionType unconfirmed | Complete | 9 months | |
| Sep 1, 2023 | 1125 Rhode Island St Upgrade partial foundation & ground lvl shear walls, repair & replace sog in-kind where req'd, convert 370 sqft of unconditioned gr lvl to conditioned space to contain laundry, storage, utility closets and new bath, add new windows in lightwell, replace exterior doors at ground floor in-kind,... Complete | Home remodel | Complete | 2 months | |
| Mar 23, 2023 | 2734 Diamond St Rev pa# 202206287271: r/r (e) footings & sog in area of demo (kitchen). reframe portion of southern wall w/ inadequate (e) framing. add step between living room & kitchen to level floor. no exterior work. Complete | Revision or supplement | Complete | Within 1 month | |
| Feb 10, 2023 | 933 Noe St Respond to planning nov 2022-009339enf. repalce (e) gas range w/ new 2 burner cooktop. legalize ground fl living rm, secondary kitchen, bath, storage, laundry, bonus room, and fire rated egress @ hallway ground level. Complete | Legalize or fix a violation | Complete | 2 months | |
| Aug 17, 2022 | 933 Noe St Remodel (e) bath: replace finishes, fixtures, remove (e) window & add (n) window in shower Complete | Home remodel | Complete | Within 1 month | |
| Jun 28, 2022 | 2734 Diamond St Reconfigure extg kitchen and upgrade with new finishes. replace extg windows and door with new french door and window at side of house. frame as needed to support new openings. (not visible from street) Complete | Home remodel | Complete | Within 1 month | |
| Apr 19, 2021 | 1410 Shrader St Remove and replace (e) plubming fixtures in primary bath; remodel primary bath, replace finishes. add (n) skylight + remove one (e) window in primary bath. convert (e) wc to (n) second bath. Cancelled | Home remodel | Cancelled | — | |
| Feb 25, 2021 | 2105 20th St Replace (e) exterior stair, brought up to current standards. replace lowest flight of stair in-kind per dbi- pre-app meeting. extend (e) stair one level to provide access to private roof deck for unit #1. construct firewall to support reconstructed stair. increase roof deck footprint to 455 gross sf Complete | Deck, stairs or patio cover | Complete | 13 months | |
| Nov 20, 2020 | 2105 20th St Reconfig unit 1 to contain 3 bed-2.5 baths, laundry, remod kitch, mod interior stair access to unit 1. remove (e) mezz. unit 2-replace (e) spiral stair, enclose laundry for dedicated access. unit 3-add w/d. Complete | Home remodel | Complete | 9 months | |
| Nov 19, 2020 | 2105 20th St Convert (e) two-car garage area to ground floor adu looking onto rear yard and 20th street. (n) adu to be entirely within (e) building envelope. (n) adu to be type va construction and be sprinklered per cbc 903.3.1.1 or 903.3.1.2. (n) adu to contain: living room, kitchen, (1) bath, (1) bedroom. Complete | ADU | Complete | 11 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Alicia Hergenroeder? Request a correction.