Amir Massoud Kakavand
Architect · Amir Kakavand · Oakland
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-30095First issued Feb 22, 2005, expires Aug 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 8 permits since 2007, 8 in the last 5 years. Latest filed Aug 10, 2026.
- What kind of projects?
- Commercial or tenant improvement 5 · Home remodel 2 · Other 1
- How long do their permits take?
- Commercial or tenant improvement: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 5 permits in San Francisco
Time to get a permit
Median from filing to permit, from 4 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 3,682 permits.
Where
- Financial District/South Beach2
- Hayes Valley2
- South of Market1
Most recent
- 539 Bryant StTenant improvement remodel including new enclosure at basement level elevator hoistway opening and a new smoke draft curtain at 2nd and 4th floor elevator hoistway opening.Aug 10, 2026Issued
- 455 Market St20th f/l, ste 2000 & 2070: addition of new non-load bearing demising partition w/ the reloacation of one (1) light fixture and re-switching if fixtures.Aug 7, 2026Issued
- 101 02nd St3/f suite 350 - work includes: new partitions, office door and glazing and mill work.Mar 26, 2026Issued
- 521 Gough StInstall metal scissor security gate in front entrance doors and windows. 1/f front of 521 gough st. 120sf. sliding scissor gate are attached to a frame on a steel box track. the frame is attached to the floor, walls and ceiling of entryway (concrete).Jun 7, 2022Cancelled
- 521 Gough St1st fl- restroom remodel, converting shower room to restroomJun 20, 2018Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Aug 10, 2026 | 539 Bryant St Tenant improvement remodel including new enclosure at basement level elevator hoistway opening and a new smoke draft curtain at 2nd and 4th floor elevator hoistway opening. Issued | Commercial or tenant improvement | Issued | 1 month | |
| Aug 7, 2026 | 455 Market St 20th f/l, ste 2000 & 2070: addition of new non-load bearing demising partition w/ the reloacation of one (1) light fixture and re-switching if fixtures. Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Jul 14, 2026 | 101 02nd St 8/f suite 800: tenant improvement remodel including new partitions, office door and glazing. reference plan for restrooms #202504285316 completed 11/18/2025. mep deferred. Issued | Revision or supplementType unconfirmed | Issued | Within 1 month | |
| Apr 27, 2026 | 101 02nd St (ste# 350 / 3rd floor) revision to pa# 202603268312: work includes installation of 6 phone booths. Issued | Revision or supplement | Issued | Within 1 month | |
| Mar 26, 2026 | 101 02nd St 3/f suite 350 - work includes: new partitions, office door and glazing and mill work. Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Jul 18, 2025 | 3106 Turk Bl New concrete slab on grade. revision to pa: 202505015594. Complete | Revision or supplement | Complete | Within 1 month | |
| May 1, 2025 | 3106 Turk Bl Enlarge an exterior 4 x 3 window to 4 x 4. removing existing door and adding 6' sliding door. moving a partition wall back 4' to create 2 rooms. adding a kitchenette with a 2 burner stove top. enlarging an existing bathroom. all work at basement level of home Complete | Home remodel | Complete | Within 1 month | |
| Sep 27, 2022 | 500 Sutter St Facade repairs including brick, terracotta, wood windows and metal cornices Filed | Other | Filed | — | |
| Jun 7, 2022 | 521 Gough St Install metal scissor security gate in front entrance doors and windows. 1/f front of 521 gough st. 120sf. sliding scissor gate are attached to a frame on a steel box track. the frame is attached to the floor, walls and ceiling of entryway (concrete). Cancelled | Commercial or tenant improvementType unconfirmed | Cancelled | — | |
| Jun 20, 2018 | 521 Gough St 1st fl- restroom remodel, converting shower room to restroom Complete | Commercial or tenant improvement | Complete | 8 months | |
| Apr 16, 2007 | 515 29th St Removing existing stud wall guardrail and repalce with new glass railing system. approximately 28' linear feet of 42" high glass railing in entry room/mezzanine area. Expired | Home remodel | Expired | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Amir Massoud Kakavand? Request a correction.