Ana C Quezada
Architect · Quezada Architecture Inc · Mill Valley
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-25871First issued Aug 11, 1995, expires Aug 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 35 permits since 2021, 35 in the last 5 years. Latest filed Oct 15, 2026.
- What kind of projects?
- Commercial or tenant improvement 31 · Home remodel 1 · Legalize or fix a violation 1
- How long do their permits take?
- Commercial or tenant improvement: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 31 permits in San Francisco
Time to get a permit
Median from filing to permit, from 30 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 25,225 permits.
Where
- Financial District/South Beach19
- Tenderloin4
- North Beach4
- South of Market3
Most recent
- 235 02nd St #06th fl - minor tenant improvement includes adding 5 new non-rated doors and side lites, with card readers and panic hardware, around the passenger elevator and lobby areasOct 15, 2026Issued
- 2 Embarcadero Center26th floor: t.i.demo of a non-structural partition, millwork, doors, finishes.Aug 11, 2026Issued
- 2 Embarcadero Center28th floor: t.i.demo of a partition of existing pantry and adding one all gender restroom. new non-structural partitions doors, lighting, millwork minor electrical and fixtures.Aug 11, 2026Issued
- 1349 Larkin StMinor ti of 2 levels. and a mezzanine. project scope focuses on new entry doors, lobby, break room, and toilets. this includes non-structural demo, non-structural partitions, and new finishes throughout. mep and structural for stairs will be submitted as deferred submittalAug 3, 2026Issued
- 235 02nd St #0Level 2 & 3 minor ti: project scope focuses on lobby, break rooms and toilets, non-structural demolition, non-structural partitions, new furnature and finishes throughout. existing egress systems, fire rated wall systems, elevators, structure, sprinklers, and existing use to remain.Jun 25, 2026Issued
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Oct 15, 2026 | 235 02nd St #0 6th fl - minor tenant improvement includes adding 5 new non-rated doors and side lites, with card readers and panic hardware, around the passenger elevator and lobby areas Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Sep 16, 2026 | 235 02nd St #0 Revision to issued 202606253898. changes include elminating level 2 - lobby and copy room scope. eliminating level 3 unisex toilet and shower scope. minor reunions to light fixtures. millwork, finishes, and schedules. Issued | Revision or supplement | Issued | Within 1 month | |
| Aug 11, 2026 | 2 Embarcadero Center 26th floor: t.i.demo of a non-structural partition, millwork, doors, finishes. Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Aug 11, 2026 | 2 Embarcadero Center 28th floor: t.i.demo of a partition of existing pantry and adding one all gender restroom. new non-structural partitions doors, lighting, millwork minor electrical and fixtures. Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Aug 3, 2026 | 1349 Larkin St Minor ti of 2 levels. and a mezzanine. project scope focuses on new entry doors, lobby, break room, and toilets. this includes non-structural demo, non-structural partitions, and new finishes throughout. mep and structural for stairs will be submitted as deferred submittal Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Jun 25, 2026 | 235 02nd St #0 Level 2 & 3 minor ti: project scope focuses on lobby, break rooms and toilets, non-structural demolition, non-structural partitions, new furnature and finishes throughout. existing egress systems, fire rated wall systems, elevators, structure, sprinklers, and existing use to remain. Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Mar 25, 2026 | 988 Market St #801 Revision 202503273203- floors 9-10 for demo of portion of concrete floor and steel reinforcing for opening. hvac ducting will go through from floors. Issued | Revision or supplementType unconfirmed | Issued | 1 month | |
| Mar 17, 2026 | 235 02nd St #0 Ground floor ti for suite 1500 to include restroom on 1st floor of an (e) 6 story building. non structural demo, partitions, and (n) act ceiling tile and lighting fixtures, (n) and modified millwork and plumbing fixtures Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Dec 30, 2025 | 988 Market St #801 9/f: provide new ceilings and new lighting. no change in occupancy/use. no additional plumbing fixtures required. Issued | Commercial or tenant improvement | Issued | 3 months | |
| Dec 18, 2025 | 988 Market St #801 Revision to pa #2025-0327-3203: remove act ceilings, (n) air handler unit and add mep drawings. Issued | Revision or supplement | Issued | 3 months | |
| Nov 12, 2025 | 235 02nd St #0 5/f: new rated doors at passenger elevator lobby, card readers, and a door release button. Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Jun 18, 2025 | 34 Woodward St Work is to remove 3 (e) windows. prepare (e) walls for 3 (n) windows openings and install (n) windows into the framed portion of of (e) building on the street facing wall on level 2. Issued | Other | Issued | 1 month | |
| Apr 25, 2025 | 235 02nd St #0 6th/f:t.i. non structural partitions demo, ceilimg, flooring finishes demo. new non-structural partitions, new furnitures, finishes. revisions to main restrooms, new all gender restroom, new mother's room, new pantry, revision to breaks room, new conference & huddle rooms. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Apr 2, 2025 | 235 02nd St #0 Change of use from storage/loading dock to general office. total area of change is 3,482 gross sq ft. infill of existing roll-down garage door, non structural demo of loading dock door & new curtainwall infill of same, per planning commission motion 21168. loading dock area will become b-office Expired | Commercial or tenant improvement | Expired | 2 months | |
| Mar 28, 2025 | 988 Market St #601 7th fl:units 601 and 602: scope includes non structural demo, non structural partitions and new millwork. (e) lighting and restrooms to remain. mep & life safety under a separate permit Issued | Commercial or tenant improvement | Issued | 3 months | |
| Mar 27, 2025 | 218 Mississippi St Correction to planning enforcement 2023-005265enf to legalize clean room and change of use to include accessory b-lab use. Complete | Legalize or fix a violation | Complete | 1 month | |
| Mar 27, 2025 | 988 Market St #801 9th/f: interior non-structural t.i. demo, partitions, new millwork, e) lighting, restrooms, egress system, rated walls to remain. deferred mep & fire. common area Issued | Commercial or tenant improvement | Issued | 3 months | |
| Mar 27, 2025 | 988 Market St #701 8th/f: interior non-structural t.i. demo, partitions, new millwork, e) lighting, restrooms Issued | Commercial or tenant improvement | Issued | 3 months | |
| Mar 20, 2025 | 235 02nd St #0 6th fl-minor interior demo of a single story within 6 story building, scope includes non-structural partitions demolition, ceiling demolition, & flooring, finishes demolition. existing egress systems, fire rated wall systems, elevators, structural, sprinklers & existing use to remain. per ab-017, Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Mar 20, 2025 | 1301 Sansome St 2nd & 3rd - minor 2nd & 3rd fl interior renovations to existing office space. renovations to include addition of new convenience stair between the 2nd and 3rd fl, connected to mezzanine. demolition includes alteration to (e) mezzanine guardrail for stair opening Issued | Commercial or tenant improvement | Issued | 2 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Ana C Quezada? Request a correction.