Ana Sylvia B Wade
Architect · Wade Design Architects · San Anselmo
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-31956First issued Mar 4, 2009, expires Mar 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 4 permits since 2023, 4 in the last 5 years. Latest filed Oct 27, 2023.
- What kind of projects?
- Retaining wall or site work 2 · Home remodel 1 · Other 1
- How long do their permits take?
- Retaining wall or site work: 5 months. City typical for the same review: 5 months.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Retaining wall or site work: 2 permits in San Francisco
Time to get a permit
Median from filing to permit, from 2 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 5,278 permits.
Where
- Marina1
- Castro/Upper Market1
Most recent
- 2615 Union StNo change to proposed building mass,height, setback, ftprnt.no work public right of way.e boundry walls and fences to remain. remodel rear yard to replace e concrete retaining walls,planter walls, landcape features,stairs. e con grill area to be demo'd new bbq area to be built in new location.Jun 30, 2023Complete
- 359 Cumberland StFurther excavation of (e) crawl space and installation of retaining wall to stabilize slope, to provide positive drainage away from (e) retaining wall and to remedy water infiltration @ (e) retaining wall.Jan 11, 2023Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Dec 19, 2024 | 2615 Union St Revision to 202304065189: move partition walls of closet on 2nd floor, finish, electrical, & interior door changes. Complete | Revision or supplement | Complete | Within 1 month | |
| Jun 24, 2024 | 359 Cumberland St Revision to pa# 202211106305 addition of (n) sealed gas appliance to living room on level one. Complete | Revision or supplement | Complete | Within 1 month | |
| Apr 12, 2024 | 2615 Union St Revision to 202304065189: interior remodel 3rd fl to include interior partition wall changes; replacement of finishes and fixtures, new interior doors, and additional fixtures, relocate wetbar. Complete | Revision or supplement | Complete | Within 1 month | |
| Oct 27, 2023 | 2615 Union St Revision to pa# 202304065189, remodel of 3/f to include interior partition wall changes, partial replacment of finishes and fixtures, new interior doors, and additional fixtures. Complete | Revision or supplement | Complete | 1 month | |
| Oct 27, 2023 | 2615 Union St Front door replacement. no change to the rest of the front facade. Complete | Other | Complete | 1 month | |
| Jun 30, 2023 | 2615 Union St No change to proposed building mass,height, setback, ftprnt.no work public right of way.e boundry walls and fences to remain. remodel rear yard to replace e concrete retaining walls,planter walls, landcape features,stairs. e con grill area to be demo'd new bbq area to be built in new location. Complete | Retaining wall or site work | Complete | Within 1 month | |
| Apr 18, 2023 | 2615 Union St Revision to pa# 202304065189, structural change and partition change to 2nd flr, fixture and finishes and interior door changes to 2nd flr Complete | Revision or supplement | Complete | Within 1 month | |
| Apr 6, 2023 | 2615 Union St No change to bldg. height, massing, or setbacks. add wall to return bldg to (2) units. changes to interior wall partitions. main stair redesign, replacement of finishes & fixture throughout 1st & 2nd levels. changes to some (e) openings. replacment of some facade materials. Complete | Home remodel | Complete | Within 1 month | |
| Mar 8, 2023 | 359 Cumberland St Addition of powder bathroom on level 1. revision to bpa#202211106305. Complete | Revision or supplement | Complete | 2 months | |
| Jan 11, 2023 | 359 Cumberland St Further excavation of (e) crawl space and installation of retaining wall to stabilize slope, to provide positive drainage away from (e) retaining wall and to remedy water infiltration @ (e) retaining wall. Complete | Retaining wall or site work | Complete | 9 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Ana Sylvia B Wade? Request a correction.