Angelito Miranda Perez
Engineer · South Bay Consulting Engr · Hayward
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeCivil Engineer C-68198First issued Jun 24, 2005, expires Sep 30, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 48 permits since 2011, 48 in the last 5 years. Latest filed Aug 19, 2026.
- What kind of projects?
- Home remodel 24 · Deck, stairs or patio cover 8 · Commercial or tenant improvement 5
- How long do their permits take?
- Home remodel: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 24 permits in San Francisco
Time to get a permit
Median from filing to permit, from 20 issued permits filed since 1966; 4 still in review. City is the San Francisco median for the same kind of review, from 19,078 permits.
Where
- Sunset/Parkside6
- Inner Sunset5
- Noe Valley2
- Mission2
Most recent
- 3620 Ulloa StInfill of (e) space under (e) 2nd floor. garage conversion into livable space. new bathroom.Aug 19, 2026Issued
- 2336 Quintara StConvert portion of (e) garage into habbitable space on 1st floor. new living space connected to main living area on 2nd floor, new bedroom, living room, half and full bath, laundry space replacing and increasing size of rear window and door.Jul 17, 2026Filed
- 34 Houston St #0Interior alteration to the (e) single family/residence includes all bedrooms, kitchen, living room, dining room, closet, & all bathrooms. electrical & plumbing will be affected due to alteration work includes windows & doors.May 12, 2026Filed
- 4272 26th StSignificant kitchen remodel including the removal of load bearing and non-load bearing walls, installation of new framing members, shearwall and foundation elements.May 5, 2026Filed
- 1350 Ortega StConvert (e) garage/basement area into livable space with 2 bedrooms and 1 bathroom; remove wall between existing garage and hallMar 4, 2026Issued
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Oct 30, 2026 | 3620 Ulloa St Revision to #202608196863: revise structural plans. Issued | Revision or supplement | Issued | Within 1 month | |
| Sep 25, 2026 | 2725 Clement St #0 Rev to pa#202211106256. legalization: garden shade struc for (n) laundry area & ev charging station @ rear. provide (e) roof shingles, provide 1-hr fire resistive wall on right side. extended garage @ front. (n) 1-hr fire rated wall & door btw garage & dining/adu @ g/f. re-oriented kitchen & doors Filed | Revision or supplement | Filed | — | |
| Aug 19, 2026 | 3620 Ulloa St Infill of (e) space under (e) 2nd floor. garage conversion into livable space. new bathroom. Issued | Home remodelType unconfirmed | Issued | Within 1 month | |
| Aug 18, 2026 | 474 02nd Av Revise pa# 202605010538 (sheet a-2): revise 3rd & 4th fl bathroom and kitchen configurations. no change in plumbing fixture count. Issued | Revision or supplement | Issued | Within 1 month | |
| Jul 17, 2026 | 315 Capistrano Av Convert of (e) garage into adu (634sf). extension/addition at back of rear of strutcure (166sf) Cancelled | ADU | Cancelled | — | |
| Jul 17, 2026 | 2336 Quintara St Convert portion of (e) garage into habbitable space on 1st floor. new living space connected to main living area on 2nd floor, new bedroom, living room, half and full bath, laundry space replacing and increasing size of rear window and door. Filed | Home remodelType unconfirmed | Filed | — | |
| May 12, 2026 | 34 Houston St #0 Interior alteration to the (e) single family/residence includes all bedrooms, kitchen, living room, dining room, closet, & all bathrooms. electrical & plumbing will be affected due to alteration work includes windows & doors. Filed | Home remodel | Filed | — | |
| May 5, 2026 | 4272 26th St Significant kitchen remodel including the removal of load bearing and non-load bearing walls, installation of new framing members, shearwall and foundation elements. Filed | Home remodel | Filed | — | |
| Apr 16, 2026 | 213 06th Av #0 Revision to pa 202603167634 (repair front step <50%) replace (e) wood stair in-kind; repair (e) upper deck/landing in-kind new steel railing at deck stair Complete | Revision or supplement | Complete | Within 1 month | |
| Mar 24, 2026 | 331 Ellsworth St Replace exterior guard rail. re-water proofing deck area. Issued | Deck, stairs or patio cover | Issued | Within 1 month | |
| Mar 18, 2026 | 332 Hill St Revision to pa 202511109295 to add additional structural strengthening; add floor to the existing loft/mezzanine area above (e) master bedroom; interior remove (e) sprial stairs and install new stair to the mezzanine; add new skylight above the mezzanine Issued | Revision or supplement | Issued | 3 months | |
| Mar 4, 2026 | 1350 Ortega St Convert (e) garage/basement area into livable space with 2 bedrooms and 1 bathroom; remove wall between existing garage and hall Issued | Home remodel | Issued | Within 1 month | |
| Feb 3, 2026 | 221 11th St Revise p/a's to 2024-0705-55875, 2024-0927-1800 and recommencement p/a 2026-0127-4650 to document the exxclusion of elevator upgrade from the previously approved scope of work. Complete | Revision or supplement | Complete | Within 1 month | |
| Jan 30, 2026 | 474 02nd Av Removing one wall per engineering plans, adding a new wall per plan. remodeling one bathroom, opening wall to add a closet to the bathroom, relocating vanity to new location rest will be remain the same. replacing portion of 2nd floor framing. Issued | Home remodel | Issued | Within 1 month | |
| Jan 22, 2026 | 275 Christopher Dr Convert portion of the garage into a master bedroom with walk in closet and master bath, family room and dedicated laundry room with a closet. voluntary seismic upgrade. Complete | Home remodel | Complete | Within 1 month | |
| Dec 11, 2025 | 1477 09th Av Comply with board of appeals decision: 24-060 built in planter is 3 ft wide and 18 in high that runs the length of the deck from the house to approx within 38 in of the stairs. guard rail with min height of 42 in that is made either a tempered or laminate safety glass or b. with a metal frame and Issued | Deck, stairs or patio cover | Issued | Within 1 month | |
| Dec 5, 2025 | 481 Noe St Reconstruction of exterior stairs like for like for like at rear Issued | Deck, stairs or patio cover | Issued | Within 1 month | |
| Nov 21, 2025 | 1307 Francisco St Master bathroom remodel and full kitchen remodel, re-pipe all water pipes and rewire plus new 100 amp subpanel. Complete | Home remodel | Complete | Within 1 month | |
| Nov 10, 2025 | 332 Hill St New window installation in exterior east wall and structural strengthening. Issued | Home remodelType unconfirmed | Issued | Within 1 month | |
| Oct 9, 2025 | 2290 26th Av Remove interior wall between the dining room and the kitchen Complete | Home remodelType unconfirmed | Complete | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Angelito Miranda Perez? Request a correction.