Anthony A Pantaleoni
Architect · Kotas/Pantaleoni Architects · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-14072First issued Jun 1, 1983, expires Aug 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 194 permits since 1993, 194 in the last 5 years. Latest filed Oct 28, 2026.
- What kind of projects?
- Home remodel 41 · Commercial or tenant improvement 40 · New building 32
- How long do their permits take?
- Home remodel: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 41 permits in San Francisco
Time to get a permit
Median from filing to permit, from 38 issued permits filed since 1966; 1 still in review. City is the San Francisco median for the same kind of review, from 23,779 permits.
Where
- Marina6
- Hayes Valley5
- Pacific Heights5
- West of Twin Peaks4
Most recent
- 68 Monterey BlNon-structural interior demolition of (e) study conversion to (n) primary bathroom. plumbing and electrical work to be included.Aug 17, 2026Filed
- 44 Lynch StInterior remodel. (e) bathroom fixtures to be relaced, (e) dining room & kitchen to reconfigures, electrical & plumbing work to be performed.Mar 25, 2026Complete
- 137 Lundys LnNon-structural renovation of (e) kitchen. plumbing and electrical work to be performed. moving one window on rear of building and add siding to match (e).Dec 16, 2025Complete
- 401 Twin Peaks BlDivide existing master bathroom into 2 bathrooms. provide enclosure for master bathroom toilet. provide new insulation, sheetrock, carpet, tile, and hardwood flooring in water damaged areas. no structural work. exterior work limited to painting onlyJan 31, 2025Complete
- 17 Heather AvInterior renovation of (e) 1st floor : convert unconditioned garage space to family room, powder room, and (n) stairs to 2nd floor. interior renovation of unit a- interior renovation of (e) 2nd floor: (n) stair from 1st floor and minor alteration of kitchen. include mep workJan 23, 2025Issued
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Oct 28, 2026 | 2234 Chestnut St Barrier removal:add ada compliant mirror, dead bolt, coat hook, toilet paper holder, sink trap wrap to existing ada bathroom Filed | Commercial or tenant improvement | Filed | — | |
| Oct 21, 2026 | 175 Frida Kahlo Wy Construct batting cage, include new concrete slab and electrical work. Filed | Deck, stairs or patio coverType unconfirmed | Filed | — | |
| Oct 20, 2026 | 353 Lexington St Structural foundation replacement & building upgrade. (e) brick foundation to be removed & replaced w/ (n) concrete foundation. (n) shearwalls & holddowns for building upgrade. (n) foundation, walls & roof for single-story 37 s.f. addition. architectural work under separate permit. Filed | Seismic retrofit or foundation | Filed | — | |
| Oct 13, 2026 | 353 Lexington St Exploratory excavations in one locations, each about 18 inches on a side to observe conditions of subject property and adjacent property's foundation which may consist of a shared, brick system. Issued | Retaining wall or site work | Issued | Within 1 month | |
| Aug 17, 2026 | 68 Monterey Bl Non-structural interior demolition of (e) study conversion to (n) primary bathroom. plumbing and electrical work to be included. Filed | Home remodel | Filed | — | |
| Jun 11, 2026 | 301 Howard St Suite 550: installation of 7 pre-fab privacy booths. no pluminbg or electrical work to be done. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Mar 25, 2026 | 44 Lynch St Interior remodel. (e) bathroom fixtures to be relaced, (e) dining room & kitchen to reconfigures, electrical & plumbing work to be performed. Complete | Home remodel | Complete | Within 1 month | |
| Dec 16, 2025 | 137 Lundys Ln Non-structural renovation of (e) kitchen. plumbing and electrical work to be performed. moving one window on rear of building and add siding to match (e). Complete | Home remodel | Complete | 4 months | |
| Nov 25, 2025 | 850 Corbett Av #2 Unit#2: correct nov#202546349, legalize an (e) 7'7" tall wood fence at the rear terrace at the 1st floor.fence lenght 13' 6" Suspend | Legalize or fix a violation | Suspend | Within 1 month | |
| Nov 25, 2025 | 850 Corbett Av #1 Unit#1: correct nov #202545537 & #202545865, legalize an existing 7'7" tsll wood fence at the rear terraces at the 1st floor. correcting unpermitted electrical lighting installed in common areas. fence lenght 13' 6" Suspend | Legalize or fix a violation | Suspend | Within 1 month | |
| Nov 24, 2025 | 428 Ofarrell St Abate planning enforcement case 2025002087 enf. remove e opaque glass blocks and solid interior partitoins at gr fl. storefront. replace 2 windows. remove 1 sign copy, 1 awning copy. legalize e awning structure under awning amnesty program. Complete | Legalize or fix a violation | Complete | Within 1 month | |
| Nov 6, 2025 | 1615 20th St Barrier removal: new ada restroom. change swing of door. Complete | Commercial or tenant improvement | Complete | 2 months | |
| Aug 4, 2025 | 137 Lundys Ln Detached garage: demolition of (e) detached garage and rebuild in kind. existing foundation to remain. Issued | Other | Issued | 8 months | |
| Jun 24, 2025 | 17 Heather Av 1st fl addition: addition of 45 sqft replace (e) entry & garage doors. 2nd fl: addition of 45 sq ft scope to include interior renovation of kitchen, bedrroms, bathrooms (n) powder room. (e) windows to be replaced. plumbing and eletrical work Issued | Addition | Issued | Within 1 month | |
| Jun 10, 2025 | 95 Nordhoff St Revision to 202501087919, to document fence boards to run horizontally. Complete | Revision or supplement | Complete | Within 1 month | |
| May 29, 2025 | 1620 Dolores St Convert existing closet area into new bathroom on 3rd floor.construct vertical expansion to accomodate bathroom. Complete | AdditionType unconfirmed | Complete | Within 1 month | |
| May 12, 2025 | 2142 Bay St Interior remodel of (e) 1st floor unit. replace in kind 4 single pane windows and door with double pane windows and doors. no work visible from street. Complete | OtherType unconfirmed | Complete | Within 1 month | |
| May 7, 2025 | 17 Heather Av Foundation replacement. revision to pa# 202501238889 Issued | Revision or supplement | Issued | Within 1 month | |
| May 6, 2025 | 175 Frida Kahlo Wy Barrier removal; non structural renovation of (e) restrooms to gender neutral multi-accomodation ada compliant restroom. Complete | Commercial or tenant improvement | Complete | 2 months | |
| Feb 25, 2025 | 46 Surrey St Rev to pa 202102174789 & 202210275329 at the basement and 1/f. replace kitchen removed during the remodel. Complete | Revision or supplement | Complete | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Anthony A Pantaleoni? Request a correction.