Anthony Hubert Groce
Architect · Drake Design Associates · Hercules
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-18089First issued Apr 8, 1987, expires Oct 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 9 permits since 2019, 9 in the last 5 years. Latest filed Nov 25, 2025.
- What kind of projects?
- Commercial or tenant improvement 6 · Other 3
- How long do their permits take?
- Commercial or tenant improvement: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 6 permits in San Francisco
Time to get a permit
Median from filing to permit, from 6 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 15,393 permits.
Where
- North Beach6
Most recent
- 201 Filbert St6th fl: minor work to construct an open coffee lounge, 2 phone rooms & demised lobby/reception area. work includes new non bearing partitions. 2 new doors, new lighting flooring, millwork, sink and paint. elec & telecom outlets & fls devices will be added to accommodate reconfiguration.Nov 14, 2025Issued
- 201 Filbert St2nd fl: minor work to enclose an (e) coffee room & create (n) work room & conference room. limited demo, (n) non load bearing partitions, (2) new doors, additional electrical & telecom outlets, new flooring & replacement of floor; lights with new led lights. relocate fire sprinkelrs & horn strobesDec 30, 2024Complete
- 201 Filbert St3rd floor: soft demo work & disabled access upgrade to toilet rms on vacant fl. demo work is specific to toilet rooms & limited areas within the interior of the office suite. work includes partial ht. partition, millwork & floor finishes demo, replacement of incondesent/ florescent light fixtureJul 23, 2024Complete
- 201 Filbert St7th fl: soft demo work throughout fl. includig removal of suspended clg. system, lgt fixtures & ceiling ht. partitions. upgrade toilet rooms to include accessible compliance, plmg fixture, interior finishes, & ltg upgrades. upgrade at ext perimeter offices to include nw suspended clg. system.Feb 2, 2024Complete
- 201 Filbert St6th fl: soft demo work throughout fl. includig removal of suspended clg. system, lgt fixtures & ceiling ht. partitions. upgrade toilet rooms to include accessible compliance, plmg fixture, interior finishes, & ltg upgrades. upgrade at ext perimeter offices to include nw suspended clg. system.Feb 2, 2024Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Nov 25, 2025 | 201 Filbert St Removal of e fire hose cabinets, floors 1-7. e gr fl exterior standpipes will be remain in place with caps welded in place to ensure they are never used again. infill wall openings at removed fire hose cabinets Issued | OtherType unconfirmed | Issued | 3 months | |
| Nov 14, 2025 | 201 Filbert St 6th fl: minor work to construct an open coffee lounge, 2 phone rooms & demised lobby/reception area. work includes new non bearing partitions. 2 new doors, new lighting flooring, millwork, sink and paint. elec & telecom outlets & fls devices will be added to accommodate reconfiguration. Issued | Commercial or tenant improvement | Issued | 3 months | |
| Mar 13, 2025 | 201 Filbert St 1st floor: relocation of e fire smoke (manual fan and damper panel from lobby of bldg to adjacent fire annunciator room Expired | Other | Expired | Within 1 month | |
| Dec 30, 2024 | 201 Filbert St 2nd fl: minor work to enclose an (e) coffee room & create (n) work room & conference room. limited demo, (n) non load bearing partitions, (2) new doors, additional electrical & telecom outlets, new flooring & replacement of floor; lights with new led lights. relocate fire sprinkelrs & horn strobes Complete | Commercial or tenant improvement | Complete | 2 months | |
| Jul 23, 2024 | 201 Filbert St 3rd floor: soft demo work & disabled access upgrade to toilet rms on vacant fl. demo work is specific to toilet rooms & limited areas within the interior of the office suite. work includes partial ht. partition, millwork & floor finishes demo, replacement of incondesent/ florescent light fixture Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Feb 2, 2024 | 201 Filbert St 7th fl: soft demo work throughout fl. includig removal of suspended clg. system, lgt fixtures & ceiling ht. partitions. upgrade toilet rooms to include accessible compliance, plmg fixture, interior finishes, & ltg upgrades. upgrade at ext perimeter offices to include nw suspended clg. system. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Feb 2, 2024 | 201 Filbert St 6th fl: soft demo work throughout fl. includig removal of suspended clg. system, lgt fixtures & ceiling ht. partitions. upgrade toilet rooms to include accessible compliance, plmg fixture, interior finishes, & ltg upgrades. upgrade at ext perimeter offices to include nw suspended clg. system. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Sep 19, 2022 | 201 Filbert St Amendment to 202206236950 for phase 2 ti improvements in tenant suites 200 & 201. new interior partions, new elec & telecom outlets, new suspended clg. syste, new led lighting, relocated hvac diffusers & t-stats, relocated doors in new frames, new millwork... Complete | Revision or supplement | Complete | Within 1 month | |
| Jun 23, 2022 | 201 Filbert St Ste 200: soft demo 1 of 2 (e) vacant suites. remove ceiling & light fixtures in common corridor, elevator lobby & ste 200. upgrades in both men's & women's toilet rooms including accessible compliance upgrades, lights & finishes. sprinkler under pa# 202206156368. Complete | Commercial or tenant improvementType unconfirmed | Complete | Within 1 month | |
| Apr 18, 2019 | 201 Filbert St Upgrade (e) elevator lobbies on floors 4, 6 & 7 to provide/install new smoke curtains at elevator doors. work is fire/life-safety upgrade to bring new elevator lobbies into code compliance. Complete | Other | Complete | 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Anthony Hubert Groce? Request a correction.