CheckMyDesigner

Ariane Lebrilla

Architect · Asd | Sky · San Francisco

Public records

From the licensing board and the city of San Francisco.

The short answer

Licensed?
License activeArchitect C-38312First issued Nov 22, 2019, expires Feb 28, 2027.

Source: DCA license roster, retrieved Nov 5, 2026

Verify on DCA License Search

Any board discipline?
None found.

We searched the California Architects Board enforcement list on Nov 5, 2026.

Worked in San Francisco?
211 permits since 2021, 211 in the last 5 years. Latest filed Oct 29, 2026.
What kind of projects?
Commercial or tenant improvement 193 · Other 10 · Home remodel 3
How long do their permits take?
Commercial or tenant improvement: within 1 month. City typical for the same review: within 1 month.

Permits filed each year

San Francisco permits by the year they were filed. The last 5 years are in blue.

What are you planning?

Pick your kind of project to see their permits for it.

Commercial or tenant improvement: 193 permits in San Francisco

From 2021 to 2026, latest filed Oct 29, 2026.
Permits
264 permits that name Ariane Lebrilla, newest first, including 53 revisions or supplements that are not counted. Select a permit to see the full record.
FiledProjectOpen
Oct 29, 2026315 Montgomery St #0

16th floor: tenant improvement include building, new non-structural pertitions.all new or revised hvac,electrical,plumbing and life safety work will be design-build and submitted for permit seperately. building is fully sprinklered.

Filed
Oct 27, 2026185 Berry St

3rd floor: internal demo only, ab017 future t.i. to follow(bldg is fully sprinklered)

Filed
Oct 27, 20261 Embarcadero Center

11/f #1150 - revision to #202508257086: structural attachments to phone booth (4).

Filed
Oct 22, 202655 Francisco St

Tenant improvement including demolishing of non structural partitions and building new non structuctural partitions and building non structural partitions. all new or reused hvac, elec, plumbing, life safety will be design build.

Filed
Oct 5, 20261550 Bryant St

9th floor: seismic bolting of existing phone booths

Issued
Oct 5, 2026550 Battery St

Lobby/1st floor: revision to pa# 202604239962. added package, room 403 and storage room 404

Filed
Sep 18, 2026600 California St

9th floor: space suite: t.i. includes demo, construction of (n) non-str partitions and upgrades to existing restrooms. all new or revised meos, sprinklers and fire alarm work will be design-build and submitted separately(bldg is fully sprinklered)

Filed
Sep 18, 2026600 California St

14th floor: t.i demo of non-structural partitions+ building new non-structural partitions. all new or revised meps and life safety work will design build and submitted separately. (bldg is fully sprinklered)

Filed
Sep 16, 2026400 Montgomery St

4th fl: ti to include demo of non- structural parttitions and build new non- structural partitions. all new or revised hvac, electrical, plumbing and life safety work will be design- build and submitted for permit separately. revision to permit# 202008051181

Issued
Sep 15, 2026534 04th St

Tenant improvement to 1st and 2nd fl. new restrooms, workrooms, open office area, presentation room. building entry stair under sep permit 202608056135. mechanical, electrical, kplumbing, fire/life safety as required by above scope. nfpa 13 fire sprinkler to be provided.

Filed
Sep 11, 2026300 Montgomery St

Ste 200 2/f: t.i, includes seismic bolting of (e) three phone booths.

Issued
Sep 10, 20261550 Bryant St

4th fl/ t.i siesmic bracing of existing phone booths.

Issued
Sep 10, 2026600 California St

5th fl: improvements include the demo of non-structural partitions and building new roof deck pedestal and pavers and planters, and exit access corridor. all new or revised meps and life safety work will design build and submitted separately. (bldg is fully sprinklered)

Filed
Sep 4, 2026200 Kansas St

1/f: improvements include the demolishing of a non-rated exterior window & replacement with a non-rated glass sectional door.

Issued
Aug 31, 2026534 04th St

Alteration to (e) 2 story office buildilng. 1st phase of ti project, limited to construction of (n) building entry and new interior communication stair. select soft demo, (n) floor openings and structural work. complete nfpa 13 system to be provide under separte. no additional plumbing fixtures.

Issued
Aug 31, 2026425 Market St

29th floor: t.i. include demo of non-structural partitions and building. new non-structural partitions. all new or revised. mep and life safety work will be design build, and submitted for permit separately.

Filed
Aug 28, 202690 New Montgomery St

8th/f t.i. demo non-structural partition & install new partitions, dfh, interior glazing, millwork, break area plumbing, lighting & power/data outlets, all new or reused hvac, electrical, plumbing & life safetey will be design build & submitted separately (bldg is fully sprinklered)

Issued
Aug 26, 20261700 Montgomery St

T.i. include the demolishing of non-structural partitions and building new non-structural partitions. all new or revised hvac,electrical,plumbing and life safety work will be design-build and submitted for permit separately. building is "not fully sprinklered"

Filed
Aug 25, 20261 Embarcadero Center

11th fl. suite 1150. t.i. includes demo of non structural partions and building new non structural partions. deferred mep fire protection and fire alarm (building is fully sprinklered)

Issued
Aug 19, 20261265 Battery St

2/f: tenant improvement soft demo of non bearing partition and addition of new partitions, doors/frames, cabinetry, lighting and finishes. mep deferred.

Issued

Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.

Are you Ariane Lebrilla? Request a correction.