Bassel Edward Samaha
Architect · Bassel Samaha Architecture · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-29936First issued Oct 13, 2004, expires May 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 34 permits since 2006, 34 in the last 5 years. Latest filed Dec 21, 2022.
- What kind of projects?
- Home remodel 20 · Addition 6 · Other 4
- How long do their permits take?
- Home remodel: 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 20 permits in San Francisco
Time to get a permit
Median from filing to permit, from 20 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 5,514 permits.
Where
- West of Twin Peaks4
- Sunset/Parkside2
- Haight Ashbury2
- Nob Hill2
Most recent
- 1524 36th AvDown to the studs remodel of an existing bathroom to include new fixtures, finishes, lighting and windows at second floorDec 21, 2022Complete
- 40 De Soto StDown to the stair remodel of the (e) kitchen and family room. included in the remodel are new windows and doors @ the rear facing elevation (yard)Dec 14, 2022Complete
- 1243 12th Av2 front facade, repair (e) dry-rot @ the entry stairs & porch to match in-kind; 2nd fl - add gas fireplace & remodel (e) kitchen; 3rd f- add (n) bathroom & remodel (e) bathroom; 1st fl - add fire rated wall & door betweeen garage & storage roomNov 16, 2022Complete
- 2182 48th AvRemoval of existing sub floor on level 1 and replace w/new concrete slab on grade and exterior sunken patio. floor plan reconfigured on level 1 and new code compliant stair, new bathroom and laundry room. new and replaced windows on the rear yard facade.Mar 3, 2022Complete
- 2177 17th AvThe project involves the down to the studs remodel of (e) kitchen & bathroom on level 2. removal of walls and new finishes @ media room; replacement of (e) deck w/a new deck & stairs. new windows & sidingOct 8, 2021Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Nov 17, 2023 | 2244 19th St Revision to permit 202105110179-s1 to include framing change due to field coordination, change of finish at stairs and floor at level 3, and a new glass guardrail @ level 2 stair opening. Complete | Revision or supplement | Complete | Within 1 month | |
| Dec 21, 2022 | 1524 36th Av Down to the studs remodel of an existing bathroom to include new fixtures, finishes, lighting and windows at second floor Complete | Home remodel | Complete | 2 months | |
| Dec 14, 2022 | 40 De Soto St Down to the stair remodel of the (e) kitchen and family room. included in the remodel are new windows and doors @ the rear facing elevation (yard) Complete | Home remodel | Complete | 1 month | |
| Nov 16, 2022 | 1243 12th Av 2 front facade, repair (e) dry-rot @ the entry stairs & porch to match in-kind; 2nd fl - add gas fireplace & remodel (e) kitchen; 3rd f- add (n) bathroom & remodel (e) bathroom; 1st fl - add fire rated wall & door betweeen garage & storage room Complete | Home remodel | Complete | Within 1 month | |
| Apr 1, 2022 | 142 28th Av Revision to pa# 202106253254. lower slab at storage to create wine room. reframe porch due to dryrot. structural revision to gridlines b and e. Complete | Revision or supplement | Complete | Within 1 month | |
| Mar 3, 2022 | 2182 48th Av Removal of existing sub floor on level 1 and replace w/new concrete slab on grade and exterior sunken patio. floor plan reconfigured on level 1 and new code compliant stair, new bathroom and laundry room. new and replaced windows on the rear yard facade. Complete | Home remodelType unconfirmed | Complete | 2 months | |
| Jan 4, 2022 | 183 Saint Germain Av Addition of a new manually operated skylight and related structural work. Complete | Other | Complete | Within 1 month | |
| Oct 8, 2021 | 2177 17th Av The project involves the down to the studs remodel of (e) kitchen & bathroom on level 2. removal of walls and new finishes @ media room; replacement of (e) deck w/a new deck & stairs. new windows & siding Complete | Home remodel | Complete | Within 1 month | |
| Jun 25, 2021 | 142 28th Av At basement, create habitable space including a media room, full bathroom, mechanical room, and a new stair from the 1/f. on level 1, remodel the kitchen, remove a full bathroom and create a half bath. new laundry room at level 2. new windows/doors Complete | Home remodel | Complete | 9 months | |
| May 11, 2021 | 2244 19th St Horizontal & verticial addition single family house adding 3rd story. interior remodel & reocation of (e) kitchen & bathrooms. add 3rd bathroom, (n) stairway, (n) balconies & (n) stairs to the rear yard Complete | Addition | Complete | 17 months | |
| Mar 3, 2021 | 340 Urbano Dr Addition of insulation and gypsum wallboard to ceiling of (e) garage. replace (e) 2 furnaces. remodel (e) kitchen and (e) bathroom. relocate (e) bathroom. replace (e) aluminum windows at living room and kitchen with wood windows. Complete | Home remodel | Complete | 3 months | |
| Oct 10, 2020 | 2428 14th Av Interior remodel of 2nd level: remodel existing kitchen and bathroom, addition of new bathroom, laundry room & reconstruction of existing stairway in-kind. remove bay window, alight wall, new windows, stucco patch & paint. Complete | Home remodel | Complete | 2 months | |
| Mar 6, 2020 | 1705 Page St #4 Relocation of 1 (e), non-structural, partition wall to return the floor plans of unit 1703 and 1705 #4 to be in conformance with the condominium map of 1999 Complete | Home remodel | Complete | 4 months | |
| Mar 6, 2020 | 1703 Page St Relocation of 1 (e), non-structural, partition wall to return the floor plans of unit 1703 and 1705 #4 to be in conformance with the condominium map of 1999 Complete | Home remodel | Complete | 4 months | |
| Jan 15, 2020 | 2639 17th Av Rev to pa201910285681: in garage - remove (e) post and wood beams and replace with (n) steel beam with post and footing. Complete | Revision or supplement | Complete | Within 1 month | |
| Nov 21, 2019 | 1253 Bush St Remodel of e residential studio unit to include interior remodel of e kitchen and bath. scope includes new plumbinb fixtures, new appliances, new finishes and upgraded elec, add closet wall and door. Complete | Home remodel | Complete | Within 1 month | |
| Oct 28, 2019 | 2639 17th Av Level one:expansion of habitable area with some excavation to create a nw split level. the extg bathroom & bedroom to be remodeled, and second bedroom, media room, laundry, & mechanical created. on level 2: remodel kitchen & bathroom and add 2nd bathroom. new stairway & windows added. Complete | Addition | Complete | Within 1 month | |
| Apr 5, 2019 | 178 Townsend St Removal & relocation of the (e) entry doors & sidelites which are aluminum & glass. (n) doors & sidelites are to be painted wood w/ clear glass & true divided lites. (n) doors will also include a power operator for increased accessibility. Cancelled | Other | Cancelled | — | |
| Jan 18, 2019 | 659 Pine St Add 2 8'-0" long wall mounted flagpoles to the street facade of the existing building Issued | OtherType unconfirmed | Issued | Within 1 month | |
| Dec 19, 2018 | 720 Stockton St #12 Ti of an existing residential unit to include the remodel of 2 existing bathrooms & 1 powder room w/new plumbing fixtures in current locations. also new exhaust hood, gas fireplace, windows and exterior door in kind replacement. new finishes, cabinetry and lighting Complete | Home remodel | Complete | 2 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Bassel Edward Samaha? Request a correction.