Benjamin David Tarcher
Architect · Ben Tarcher Architects · Fairfax
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-18278First issued Jun 11, 1987, expires Sep 30, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 12 permits since 2006, 12 in the last 5 years. Latest filed Aug 20, 2025.
- What kind of projects?
- Commercial or tenant improvement 6 · Other 4 · Home remodel 1
- How long do their permits take?
- Commercial or tenant improvement: 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 6 permits in San Francisco
Time to get a permit
Median from filing to permit, from 6 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 4,701 permits.
Where
- South of Market2
- Outer Richmond1
- Inner Richmond1
- Financial District/South Beach1
Most recent
- 3620 Balboa StRe-tile rest room only, addition of ada signage on doors and grab bars added as per plan, new toilet, new sink, new mirror, new light fixtures. new paint.Nov 14, 2024Complete
- 953 Harrison StAda restrooms/upgrade from e non ada restrooms, some parking re-stripingNov 13, 2019Expired
- 575 04th StNew ti for retail space. new small office, storage, retail, break room, ada restroom, cir, total useable area 4430 sq ft maher not reqFeb 2, 2017Issued
- 815 Clement St #0Response comment from health department inspection. remodel kitchen per health dept comments. remodel main entry door to meet ada accessible. remodel restroom to meet ada accessibleMay 25, 2016Complete
- 50 Post StSpace#10 level 1. remodel interior of old food retail space to yogurt retail shop. redoing some plumbing, electrical, & flooring.Jan 3, 2008Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Aug 20, 2025 | 426 Castro St Legalize e) awning "rossi's deli" Filed | Other | Filed | — | |
| Mar 18, 2025 | 132 Jasper Pl Revision to permit 202502069841. reframe dry-rot and damaged walls in bathroom and bedroom. add washer/dryer into living room. Issued | Revision or supplement | Issued | Within 1 month | |
| Nov 14, 2024 | 3620 Balboa St Re-tile rest room only, addition of ada signage on doors and grab bars added as per plan, new toilet, new sink, new mirror, new light fixtures. new paint. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Jun 5, 2024 | 1601 Fulton St Prop h: to comply with awning amnesty program. legalize existing awning installed without permit. "nopa corner market" Approved | Other | Approved | — | |
| May 30, 2024 | 3544 Balboa St To comply w/ awning amnesty program for a non-illuminated sign "balboa dental" 16' x 22" & an e) awning "superior palace seafood restauranr" 29' x 36" Complete | Other | Complete | 4 months | |
| May 30, 2024 | 6134 Geary Bl #0 To comply w/ awning amnesty program " joe's coffee shop" Complete | Other | Complete | 4 months | |
| May 30, 2024 | 6134 Geary Bl #0 Permiting of e) sign & awning to comply w/ awning amnesty program. to comply w/ nov 202200773 Complete | Legalize or fix a violation | Complete | 4 months | |
| Sep 12, 2023 | 2951 San Bruno Av Units #5 & #7 (3rd floor) and units #1 & #4 (2nd floor): split living room in half. add new walls. add 2 new doors in living rooms. 16 new windows Issued | Home remodel | Issued | 23 months | |
| Nov 13, 2019 | 953 Harrison St Ada restrooms/upgrade from e non ada restrooms, some parking re-striping Expired | Commercial or tenant improvement | Expired | Within 1 month | |
| Feb 2, 2017 | 575 04th St New ti for retail space. new small office, storage, retail, break room, ada restroom, cir, total useable area 4430 sq ft maher not req Issued | Commercial or tenant improvement | Issued | 7 months | |
| May 25, 2016 | 815 Clement St #0 Response comment from health department inspection. remodel kitchen per health dept comments. remodel main entry door to meet ada accessible. remodel restroom to meet ada accessible Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Jan 3, 2008 | 50 Post St Space#10 level 1. remodel interior of old food retail space to yogurt retail shop. redoing some plumbing, electrical, & flooring. Complete | Commercial or tenant improvement | Complete | 3 months | |
| Mar 1, 2006 | 1201 19th Av Kitchen remodel and restripe small portion of parking. may include some ramp access from parking to entrance. new kitchen equipment, flooring, partition walls, wall materioal as required by health code, plumbing code, mech, elec. fire suppression system under sep permit Complete | Commercial or tenant improvement | Complete | 2 months | |
| Aug 10, 2005 | 660 Howard St Change of stair support system revision to:200408131584 Expired | Revision or supplement | Expired | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Benjamin David Tarcher? Request a correction.