Brandon Quan
Architect · Studio B Architecture
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-36331First issued Mar 2, 2017, expires Feb 28, 2027.
Source: DCA License Search, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 14 permits since 2017, 14 in the last 5 years. Latest filed May 16, 2025.
- What kind of projects?
- Home remodel 8 · Other 3 · Commercial or tenant improvement 2
- How long do their permits take?
- Commercial or tenant improvement: 3 months. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 8 permits in San Francisco
Time to get a permit
Median from filing to permit, from 7 issued permits filed since 1966.
Where
- Haight Ashbury3
- Marina2
- Glen Park1
- Outer Richmond1
Most recent
- 3027 Franklin StInterior remodel of(e)second floor apartment unit(3027 franklin). reconfigure(e)kitchen, combine(e)bathroom & separate water closet into (1)full bath, relocate(e)powder rm, add(n)linen closet, coat closet & laundry rm; ground floor: remove (e)utility sink, laundry, parking blocks, & built-in storageJun 8, 2021Complete
- 437 Gold Mine DrRemodel extg s.f.d: interior work; reconfigure extg bathroom and closet on 1st floor, remodel extg kitchen and 1/2 bathroom on 2nd fl. and remodel extg bathroom and master bathroom on 3rd fl; exterior work; replace all extg windows & sliding patio. doors in kind.Jan 14, 2021Issued
- 1565 Oak StInterior remodel of unit #11 , relocate extg kitchen and bedroom, and add new closet.Jan 14, 2021Complete
- 1565 Oak St #0Unit 2. interior remodel. relocate kitchen and bedroom, add (n ) closetSep 2, 2020Complete
- 770 23rd AvInterior renovation of single family dwelling. lower unit: relocate (e) kitchen & bath, install (n) den, expand into (e) garage for additional 202sf, new cabinets, appliances, finishes. upper unit: relocate (e) kitchen, reconfigure (e) master bed & bath, install (n) bath, (n) cabinets,Apr 12, 2018Withdrawn
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Jan 16, 2026 | 3471 California St Amendment to existing permit 202505166619 to clarify fire alarm is not required per code due to no existing fire alarm present. Complete | Revision or supplement | Complete | Within 1 month | |
| May 16, 2025 | 3471 California St Construct new non structural partitions. install new lights. reuse e hvac system, millworks, doors, and finishes. defereed permits, elec/mech Complete | Commercial or tenant improvement | Complete | 1 month | |
| Feb 16, 2022 | 437 Gold Mine Dr Facade alteration of extg sfd; remove extg wood shingle siding at top 2 floors and replace with combo horizontal siding and stucco finish. Issued | Other | Issued | 1 month | |
| Jun 11, 2021 | 437 Gold Mine Dr Facade alteration of (e) sfd, remove (e) wood shingle siding at top 2 floor; and replace with comination horizontal siding and stucco finish; in kind replacement of (e) window under sep bpa# 202101142722 Withdrawn | Other | Withdrawn | — | |
| Jun 8, 2021 | 3027 Franklin St Interior remodel of(e)second floor apartment unit(3027 franklin). reconfigure(e)kitchen, combine(e)bathroom & separate water closet into (1)full bath, relocate(e)powder rm, add(n)linen closet, coat closet & laundry rm; ground floor: remove (e)utility sink, laundry, parking blocks, & built-in storage Complete | Home remodel | Complete | 5 months | |
| Jan 14, 2021 | 437 Gold Mine Dr Remodel extg s.f.d: interior work; reconfigure extg bathroom and closet on 1st floor, remodel extg kitchen and 1/2 bathroom on 2nd fl. and remodel extg bathroom and master bathroom on 3rd fl; exterior work; replace all extg windows & sliding patio. doors in kind. Issued | Home remodel | Issued | 15 months | |
| Jan 14, 2021 | 1565 Oak St Interior remodel of unit #11 , relocate extg kitchen and bedroom, and add new closet. Complete | Home remodel | Complete | Within 1 month | |
| Sep 2, 2020 | 1565 Oak St #0 Unit 2. interior remodel. relocate kitchen and bedroom, add (n ) closet Complete | Home remodel | Complete | 1 month | |
| Feb 12, 2019 | 683 Commercial St Submit deferred mechanical for 2018-07-11-4314. new hvac system elec & plumbing under separate submittal. revision to pa 2018-0711-4314. no lighting changes as previously proposed. all current lighting and ceiling (e) to remain Complete | Revision or supplement | Complete | Within 1 month | |
| Jul 11, 2018 | 683 Commercial St Interior remodel of (e) grnd flr commercial space w/change of use from office to limited restaurant; (e) entrance and restroom upgrades, new back-of-house area & plmb fixtures, flooring, service counter and lighting; ele & plum under sep permit Complete | Commercial or tenant improvement | Complete | 4 months | |
| Apr 12, 2018 | 770 23rd Av Interior renovation of single family dwelling. lower unit: relocate (e) kitchen & bath, install (n) den, expand into (e) garage for additional 202sf, new cabinets, appliances, finishes. upper unit: relocate (e) kitchen, reconfigure (e) master bed & bath, install (n) bath, (n) cabinets, Withdrawn | Home remodel | Withdrawn | — | |
| Jan 26, 2018 | 1741 Larkin St Interior remodel of (e) third Issued | Home remodel | Issued | 5 months | |
| Dec 8, 2017 | 1565 Oak St #0 Unit 7 - relocation of (e) kitchen and add (n) closet; mep design/build and permitted under separate application Complete | Home remodel | Complete | Within 1 month | |
| Sep 19, 2017 | 340 Ritch St #4 Unit #4: install (n) lot line window per sfdbi administrative bulletin ab-009. maher na Cancelled | Other | Cancelled | — | |
| Aug 25, 2017 | 3535 Fillmore St Units #103 & #202; remodel, install new bedroomn and bathroom for total of 2 bdroom & 2 bath in each unit: relocate non structural walls. relocate extg kitchen, renovate extg bath, new cabinets, appliances, finishes; new plumbing and electrical. n/a maher ordinance Issued | Home remodel | Issued | 6 months | |
| Aug 4, 2017 | 979 Teresita Bl Legalize (e) gr fl bathrm, remodel (e) kitchen & install (n) master bathrm; interior demo walls, (n) partitions, (n) & replacement lighting & plumbing fixtures. (n) finishes, patch & paint & repair of (e) foundation at west wall; exterior - remove (e) window & replace with (n) in same location on s Complete | Legalize or fix a violation | Complete | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Brandon Quan? Request a correction.