Breck S Polley
Architect · Huntman · Richmond
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-34828First issued Nov 5, 2014, expires Oct 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 26 permits since 2020, 26 in the last 5 years. Latest filed Oct 29, 2026.
- What kind of projects?
- Commercial or tenant improvement 20 · Other 4 · Home remodel 1
- How long do their permits take?
- Commercial or tenant improvement: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 20 permits in San Francisco
Time to get a permit
Median from filing to permit, from 17 issued permits filed since 1966; 3 still in review. City is the San Francisco median for the same kind of review, from 23,779 permits.
Where
- Financial District/South Beach16
- Presidio Heights2
- Mission Bay2
Most recent
- 1 Maritime PzInterior non structural demolition of partitions, ceilings, light fixtures, millwork, finishes, mep. new fit out of core restroooms, new finishes, ceiling and lighting in elevator lobby. the tenant suites will remain unoccupied at the completion of this project.Oct 29, 2026Filed
- 101 California StFloors 17 and 18 - replace elevator lobby doors, frames, and hardware to address tenant security concerns.Jun 1, 2026Issued
- 150 California St9th fl, ste 900 selective demo of int'r partitions, ceiling and lighting; new non-structuarl partitions, doors, frames, hardware and sidelights; new finishes, minor ceiling rework including relocated and some new lightingFeb 17, 2026Complete
- 150 California St17/f: minor t.i. to make market ready: no occupancy at completion. future t.i. sep permit. renovations/upgrades to(e) restrooms.Feb 6, 2026Complete
- 3565 California StInterior tenant improvement of a new branch bank including new non structural partitions, doors, glazing, finishes, millwork and mep.Sep 3, 2025Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Oct 29, 2026 | 1 Maritime Pz Interior non structural demolition of partitions, ceilings, light fixtures, millwork, finishes, mep. new fit out of core restroooms, new finishes, ceiling and lighting in elevator lobby. the tenant suites will remain unoccupied at the completion of this project. Filed | Commercial or tenant improvement | Filed | — | |
| Sep 2, 2026 | 300 Clay St #0 Alteration to the existing mech. system serviing specific. basement zones and ground flr zones. reduce (e) constent air volume w/variable air volume sf-12 an economizer. provide (n) vav boxes for sf-12 zones and replace hot water coils as indicated in hvac schedules provide (n) return fan rfb to Triage | Other | Triage | — | |
| Jul 14, 2026 | 1 Maritime Pz Removal of interconnecting non egress stair and structural slab infill between floors 4 and 5. north suite (suite 400) scopes include demo of non structural partitions, ceilings, finishes, mep. new paint and general lighting throughout to prepare suite for marketing. no occupancy at the end of the Issued | Home remodelType unconfirmed | Issued | Within 1 month | |
| Jun 24, 2026 | 150 California St Replace 2 existing boilers with new condensing gas fire boilers located in the roof penthouse. Issued | Other | Issued | Within 1 month | |
| Jun 1, 2026 | 101 California St Floors 17 and 18 - replace elevator lobby doors, frames, and hardware to address tenant security concerns. Issued | Commercial or tenant improvement | Issued | 1 month | |
| Apr 8, 2026 | 300 Clay St #0 26/f: replace the (e) general exhaust fan, ef-3, located on the 26th floor of one maritime plaza, with a 31,200 cfm variable - volume exhaust fan to increase tenant exhaust airflow capacity. the exhaust riser will be reused. Complete | Other | Complete | Within 1 month | |
| Feb 17, 2026 | 150 California St 9th fl, ste 900 selective demo of int'r partitions, ceiling and lighting; new non-structuarl partitions, doors, frames, hardware and sidelights; new finishes, minor ceiling rework including relocated and some new lighting Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Feb 6, 2026 | 150 California St 17/f: minor t.i. to make market ready: no occupancy at completion. future t.i. sep permit. renovations/upgrades to(e) restrooms. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Feb 3, 2026 | 3565 California St Revision to pa # 2025-0903-4422: corrected cover sheet only- reduced scope of work. no longer requires deferred life safety/fire alarm submittal. Complete | Revision or supplement | Complete | Within 1 month | |
| Sep 3, 2025 | 3565 California St Interior tenant improvement of a new branch bank including new non structural partitions, doors, glazing, finishes, millwork and mep. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Jun 16, 2025 | 300 Clay St Add (3) overhead electric heaters in an existing outdoor dining area for an existing restaurant. Complete | Other | Complete | Within 1 month | |
| Jan 28, 2025 | 3565 California St Demo only of non structural partitions, ceilings, millwork, finishes and mep. no build-back. ti and remodel of building facades under separate permits. no occupancy at completion of permit Complete | Commercial or tenant improvement | Complete | 3 months | |
| Dec 17, 2024 | 1 Maritime Pz 19th floor. partial demolition of non structural partitons, ceiling, finishes, and mep. new construction of demising partitions. new finishes, ceiling, and mech in common areas. upgrn existing restrooms to bring to compliance with sfbc chapter 11b. electrical deferred. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Dec 12, 2024 | 1 Maritime Pz 24/f: barrier removal only, including selective demo of restroom finishes and accessories construction of non structural partitons wall finishes, restroom accessories and hevy drinking fountain to bring restrooms up to full compliance with sfbc chapter 11b Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Sep 24, 2024 | 1 Maritime Pz 26th flr.minor office ti.(n)freestanding office enclosure, new millwork and sink. voluntary upgrade of non accessible(e)multi occupancy restroom & locker facility designed for use of men only to a fully accessible single occupancy facility including demo, new partitions,doors,ceilings, finishes &mep Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Aug 19, 2024 | 1 Maritime Pz Interior tenant improvement on occupied multi tenant floor. scope includes selective demo of non structural partitions, interior glazing, ceilings, light fixtures, millwork finishes. fuild back non structural paritions, doos, interior glazing, ceilings, light fixtures, millwork, finishes. mep defer. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Aug 2, 2024 | 101 California St 18th floor: full floor office t.i. including new non-load bearing partitions; doors, frames, & hardware; ceilings, lighting, & controls; millwork; finishes; & mep. project also includes minor structural upgrades to support an operable partition(sliding, stacking type) Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Jul 26, 2024 | 101 California St 17/fl- full office ti to include (n) non loading bearing partitions, doors, frames, and hardware. ceilings, lighting and controls, millwork finishes and mep Complete | Commercial or tenant improvement | Complete | 1 month | |
| Apr 22, 2024 | 1 Maritime Pz Revision to approved permit 2023-1211-2251;; minor revisions to mechanicl and plumbing systems simplified structural upgards Complete | Revision or supplement | Complete | 2 months | |
| Jan 25, 2024 | 1 Maritime Pz 17th and 18th floors- floor demo of 17th and 18th floor with tenant improvements to core restrooms and elevator lobbies. no exterior work. Complete | Commercial or tenant improvement | Complete | 3 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Breck S Polley? Request a correction.