Brittany D Dhawan
Architect · Studio 144 · Oakland
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-36879First issued Jan 31, 2018, expires Mar 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 12 permits since 2019, 12 in the last 5 years. Latest filed Jan 6, 2026.
- What kind of projects?
- Commercial or tenant improvement 7 · Legalize or fix a violation 2 · Other 2
- How long do their permits take?
- Commercial or tenant improvement: 4 months. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 7 permits in San Francisco
Time to get a permit
Median from filing to permit, from 7 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 4,704 permits.
Where
- Pacific Heights3
- South of Market2
- Bernal Heights1
- West of Twin Peaks1
Most recent
- 1256 Folsom StTo comply with abe program ord 51-16 this is a technical infeasibility for an ave program permit is building is a 1911 category a historic building with a 57 1/2" level change from sidewalk level at folsom st and on existing non conforming staircase from street to entries. abe 201912059292Apr 25, 2023Complete
- 400 Precita AvPour new concrete curb and new landing to provide for better accessibility to entry. add power door threshold for requirment of the accessible business entrance program.Dec 1, 2020Complete
- 490 Taraval StTo comply with abe program per ordinance 51-16 - new power door operator to be installed. new entry door. replacement in kind to existing.Nov 19, 2020Complete
- 1943 Divisadero St1943: for compliance with abe program certification - new power door operator, threshold work, new hardwareNov 19, 2020Issued
- 1939 Divisadero StTo comply with abe program -technical infeasibility request for upgrading the entrance to accessible for 1939 divisadero street. minor upgrades to hardware at (e) gate and entry door per ordinance 51-16.Oct 1, 2020Issued
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Jan 6, 2026 | 204 Ortega St Legalize (e) space on ground floor as an adu state program. upgrade exit corridor to 1 hr rating by addition of gypsum board layer, upgrade ceiling of the exit corridor & garage to 1 hr rating by the addition of a gypsum board layer. enlarge adu unit bedroom window to eero req's. replace 2 doors for Issued | Legalize or fix a violationType unconfirmed | Issued | 10 months | |
| Jun 21, 2024 | 1156 Clement St To permit the work under notice of violation #202420194. an (e) exterior stairs located at the rear of the 1156 clement property was enclosed 10 years ago. additional unpermitted work includes exterior wall and extention of the side walls and a roof. Complete | Legalize or fix a violation | Complete | Within 1 month | |
| Jun 5, 2023 | 2757 Vallejo St (n) retaining wall over 2 parcels to provide a replacement for the (e) unreinforced concrete retaining wall covering rear yard line of 2750 broadway. (e) retaining wall to be continuous as shown over part of rear yard of 2757 vallejo st. each of 3 addresses will have same permit application w/ plans Complete | Retaining wall or site work | Complete | 2 months | |
| Apr 25, 2023 | 1256 Folsom St To comply with abe program ord 51-16 this is a technical infeasibility for an ave program permit is building is a 1911 category a historic building with a 57 1/2" level change from sidewalk level at folsom st and on existing non conforming staircase from street to entries. abe 201912059292 Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Nov 29, 2022 | 2750 Broadway Install home elevator between 1st & 2nd floors. stiltz duo model, cut and finish hole in floor for elevator. install 3 form screen at 1st floor. Complete | Other | Complete | Within 1 month | |
| Nov 2, 2021 | 2651 20th Av Rev. to 2021-0211-4503: remove existing unpermitted skylights from lower rear roof & patch back. more over washer/dryer location within kitchen of adu because of (e)plumbing drainn line. remove(e)whirlpool tub in adu & replace with shower. Complete | Revision or supplement | Complete | 6 months | |
| Jul 22, 2021 | 2651 20th Av New duct chase at second flr in artrium for new mechanical ducts to exhaust at roof. emergency escape and rescue route, opening to 60' rear yard. Withdrawn | Other | Withdrawn | — | |
| Dec 1, 2020 | 400 Precita Av Pour new concrete curb and new landing to provide for better accessibility to entry. add power door threshold for requirment of the accessible business entrance program. Complete | Commercial or tenant improvementType unconfirmed | Complete | 7 months | |
| Nov 19, 2020 | 490 Taraval St To comply with abe program per ordinance 51-16 - new power door operator to be installed. new entry door. replacement in kind to existing. Complete | Commercial or tenant improvement | Complete | 8 months | |
| Nov 19, 2020 | 1943 Divisadero St 1943: for compliance with abe program certification - new power door operator, threshold work, new hardware Issued | Commercial or tenant improvement | Issued | 4 months | |
| Oct 1, 2020 | 1939 Divisadero St To comply with abe program -technical infeasibility request for upgrading the entrance to accessible for 1939 divisadero street. minor upgrades to hardware at (e) gate and entry door per ordinance 51-16. Issued | Commercial or tenant improvement | Issued | 5 months | |
| Oct 1, 2020 | 1947 Divisadero St Technical infeaibility request for upgrading the entrance to accessible for 1947 divisadero street. minor upgrades to hardware at (e) gate and entry door per ordinance 51-16. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Jan 9, 2019 | 865 Market St Space 106: tenant improvement (e) 1st fl retail space in mall. new interior partitions, new storefront, new hvac sytem, modification of (e) to remain, elec system. maher n/a. Complete | Commercial or tenant improvement | Complete | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Brittany D Dhawan? Request a correction.