Candace Chan
Architect · Revel Architecture And Design · Berkeley
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-40716First issued Oct 19, 2023, expires Dec 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 49 permits since 2024, 49 in the last 5 years. Latest filed Sep 30, 2026.
- What kind of projects?
- Commercial or tenant improvement 48 · Other 1
- How long do their permits take?
- Commercial or tenant improvement: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 48 permits in San Francisco
Time to get a permit
Median from filing to permit, from 45 issued permits filed since 1966; 2 still in review. City is the San Francisco median for the same kind of review, from 13,561 permits.
Where
- Financial District/South Beach30
- South of Market10
- Mission Bay6
- Chinatown1
Most recent
- 185 Berry St1st fl, ste 140 - interior construction of non-structural elements including interior partitions, doors, finishes, ceiling, and lighting. does not affect plumbing, fixtures quantitits, occupancy or path of travel.Sep 30, 2026Filed
- 500 Howard St #0Floors: 2, 4, 6, 7: anchoring of (e) modules phone booths in (e) office.Jul 20, 2026Issued
- 680 Folsom St8th * 9th fl - install of modular phone booths in an existing office fls 8 & 9 existing occupancy are not affected by this work. no demo mep or security work included. structural work includedJun 25, 2026Complete
- 650 California St #012 flr: office t.i. including interior partitions, doors, finishes, ceiling, lights, millwork. seismic requirement for (9) new phone booths. mep deferred.May 11, 2026Issued
- 595 Market St20th/f t.i. demo & new construction of non-structural partitions, doors, finishes, & lighting. ada upgrade at core restrooms, phone booth structural drawings. no change to fixture counts, occupancy loads, or path of traval, mep deferredFeb 26, 2026Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Sep 30, 2026 | 185 Berry St 1st fl, ste 140 - interior construction of non-structural elements including interior partitions, doors, finishes, ceiling, and lighting. does not affect plumbing, fixtures quantitits, occupancy or path of travel. Filed | Commercial or tenant improvement | Filed | — | |
| Sep 18, 2026 | 185 Berry St Revision to open permit#202602125816, design changes, revised evcs stall location. Issued | Revision or supplement | Issued | Within 1 month | |
| Aug 4, 2026 | 300 Mission St 6th fl - revision to 202512222450 installation of life safety seismic requirements for new (2) 1 person and (1) 2 person phone booths in an existing office total of 3 phone booths full restroom remodel included Issued | Revision or supplement | Issued | Within 1 month | |
| Jul 20, 2026 | 500 Howard St #0 Floors: 2, 4, 6, 7: anchoring of (e) modules phone booths in (e) office. Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Jun 25, 2026 | 680 Folsom St 8th * 9th fl - install of modular phone booths in an existing office fls 8 & 9 existing occupancy are not affected by this work. no demo mep or security work included. structural work included Complete | Commercial or tenant improvement | Complete | 3 months | |
| May 11, 2026 | 650 California St #0 12 flr: office t.i. including interior partitions, doors, finishes, ceiling, lights, millwork. seismic requirement for (9) new phone booths. mep deferred. Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Apr 1, 2026 | 595 Market St 12th fl, ste 1250 consist of demo & new construction of non-structural partition walls, doors, finishes, lighting & millwork. mep to be deferred submittal. no change to fixture quantities, occupancy loads, or path of travel (pa 202602135931). restroom ada compliance under pa 202512172039 Complete | Revision or supplement | Complete | 1 month | |
| Feb 26, 2026 | 595 Market St 20th/f t.i. demo & new construction of non-structural partitions, doors, finishes, & lighting. ada upgrade at core restrooms, phone booth structural drawings. no change to fixture counts, occupancy loads, or path of traval, mep deferred Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Dec 22, 2025 | 300 Mission St 6th fl: tenant improvement. selective interior demo and new construction of elements including but not limited to interior partitions, doors, finishes, ceilings & lighting. restroom upgrades are included. no exterior work. pot approved under separate permit. Issued | Commercial or tenant improvement | Issued | 2 months | |
| Dec 17, 2025 | 595 Market St 13/f suite 1300: interior non-structural demo. construction of interior partitions, doors, finishes. mep deferred. work does not affect fixture quantities, occupant loads or path of travel. no exterior work. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Dec 17, 2025 | 595 Market St 12th fl, suite 1200. interior demolition of non structural elements including but not limited to interior partitions, doors, finishes, and lighting. construction of break millwork, storage, lighting, finishes. also includes restroom ada accessibility upgrades. mep under sep permit Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Dec 17, 2025 | 300 Mission St 11th fl - install consists of intallation of life safety and seismic requirements for new 1 person phone booths in an existing office, total of 7 phone booths. restrooms accessibilty upgrades are included up to 20% construction cost and do not affect existing layout or occupancy of egress. Complete | Commercial or tenant improvement | Complete | 1 month | |
| Dec 17, 2025 | 595 Market St 12/f suite 1275 and 1285: interior non-structural demo. construction of new demising walls, conference, break area, and office, ceilings, lighting and finishes. mep deferred. work does not affect fixture quantities, occupant load calcs or path of travel. no exterior work. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Dec 16, 2025 | 595 Market St 11th fl, suite 1150: scope of work on the 11th floor, shall consist of interior demolition of non-structural elements including interior partitions, finishes, and llightinh. construction of new glazing wall, lighting, and finishes. mep under a seperate permit. Filed | Commercial or tenant improvement | Filed | — | |
| Dec 11, 2025 | 1 Market St 13th/f t.i. minor demo of non structural elements, construction of new 23 offices, 13 meeting rooms, break & reception area. new finishes, ceilings, lights. ref 202510238018 Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Dec 8, 2025 | 185 Berry St Provide new exit passageway at ground floor Issued | Commercial or tenant improvement | Issued | 3 months | |
| Sep 5, 2025 | 88 Stevenson St Tenant improvement consisting of lim9ited interior demo new construction of non structural elements including interior partitions, doors, finishes, ceiling, lighting, mech, electrical outlets and switches Issued | Commercial or tenant improvement | Issued | 3 months | |
| Aug 27, 2025 | 1455 Market St Level 1: newly added scope of work consists of addition of a 2nd interior ramp at exit vestibule 1-003. converting of 2 (e) showers into toilet stalls & other minor shifts or adjustments to previously approved portion layout. newly added structural. Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Aug 4, 2025 | 410 Townsend St 3/f: new demising wall to separate existing full floor tenant space into 2 suites (suite 301 and 302). suite 302 - new pantry and upgrades to existing unisex restroom/shower. core area - ada restroom upgrade. mep and fire life safety will be deferred submittal. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Jul 23, 2025 | 185 Berry St #3000: 3rd floor, consists of interior construction. mechanical, electrical, fls, and fire sprinkler work is limited to what is required based on new lighting layout. scope does not affect plumbing fixture quantities, occupant load calculations, or path of travel. Complete | Commercial or tenant improvement | Complete | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Candace Chan? Request a correction.