CheckMyDesigner

Corina Dumitrescu

Architect

Public records

From the licensing board and the city of San Francisco.

The short answer

Licensed?
License activeArchitect C-37361First issued Sep 25, 2018, expires Jan 31, 2027.

Source: DCA License Search, retrieved Nov 5, 2026

Verify on DCA License Search

Any board discipline?
None found.

We searched the California Architects Board enforcement list on Nov 5, 2026.

Worked in San Francisco?
5 permits since 2018, 5 in the last 5 years. Latest filed Jun 4, 2026.
What kind of projects?
Home remodel 1 · Addition 1 · New building 1
How long do their permits take?
Home remodel: within 1 month. City typical for the same review: within 1 month.

Permits filed each year

San Francisco permits by the year they were filed. The last 5 years are in blue.

What are you planning?

Pick your kind of project to see their permits for it.

Home remodel: 1 permit in San Francisco

In 2023, latest filed Oct 4, 2023.

Time to get a permit

Theirs
Within 1 month
City
Within 1 month

Median from filing to permit, from 1 issued permit filed since 1966. City is the San Francisco median for the same kind of review, from 4,704 permits.

Where

  • Financial District/South Beach1
Permits
6 permits that name Corina Dumitrescu, newest first, including 1 revisions or supplements that are not counted. Select a permit to see the full record.
FiledProjectOpen
Jun 4, 20261550 Church St

Change of use from restaurant to child care. plumbing: change sink to kids friendly heights, change 4 adult toilet into 4 children toilet, demo-tear away all restaurant fixtures bar walking freezer,kitchen cookline, fixed seating areas, wine ceiler to make into open play area for kids. max 50 child

Filed
Sep 24, 2024275 05th St

P/a to address issues identified in the accessibility report (abe202401199308) prepared to comply with the abe program including the removal and replacement of the front door and aluminum storefront system to match (e)

Complete
Jul 3, 20243369 Market St

Remove and replace rotten wood decking members in kind from existing deck. rear side of the bldg not visible from the pulic eye.

Complete
Oct 4, 2023101 Lombard St #319

Unit 319e: ref no-plan permit 202309136440. modification of existing kitchen wall per plans. moving one electrical outlet. widening of interior opening: kitchen to dining at non load bearing wall.

Complete
Aug 10, 20221001 Franklin St

Priority processing - to construct a 7-story, 94 dwelling units, type 3a over 1a, senior affordable housing. residential building.

Filed
Dec 18, 20184312 23rd St

Interior renovations and additions of a garage to an (e) sfh. (n) work consists of (n) interior partitions, (n) garage w/ interior staircase, remodeled 1st flr, remodeled interior staircase & exterior staircase. (n) addition under (e) deck is proposed.

Cancelled

Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.

Are you Corina Dumitrescu? Request a correction.