D Ian Bevilacqua
Architect · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-34402First issued Sep 5, 2013, expires Jul 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 10 permits since 2020, 10 in the last 5 years. Latest filed Jan 14, 2025.
- What kind of projects?
- Home remodel 7 · Other 3
- How long do their permits take?
- Home remodel: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 7 permits in San Francisco
Time to get a permit
Median from filing to permit, from 7 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 10,692 permits.
Where
- Financial District/South Beach5
- Seacliff1
- Nob Hill1
Most recent
- 415 El Camino Del MarAddition of elevator spanning all 3 floors. remodel of interior non structural walls and bathrooms. including remodel of kitchen finishes and fixtures.Jan 14, 2025Complete
- 181 Fremont St #5643/f, unit 56a: new wood floors, non structural reconfiguration of kithen, den, master bdrmoom closet, and removal of entry closets. open drywall for the purpose of minor elec work. electrical and sprinkler under sep permitsJul 14, 2022Issued
- 154 Lombard StInterior remodel of common corridors include new tile flooring on level 1, new finishes (wall to wall carpet, wall covering, paint). and replacing existing light fixtures wiht new low energy light fixtures. new led lighting at select locations.Sep 14, 2020Complete
- 156 Lombard StCommon area: interior remodel to include new tile flooring on level 1, new finishes, walls, carpet, wall coverings, paint. replace existing light fixtures w/ new led fixtures, new led lighting at select locations as required to meet code.Sep 10, 2020Complete
- 150 Lombard StBldg #1: interior remodel of existing building interior common corridors: new tile flooring on level 1, new finishes (wall to wall carpet, wall covering, paint) and replacing exisitng light fixtures with new low energy (lep) light fixtures; new led lighting at select locations as required by code.Sep 2, 2020Issued
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Aug 13, 2025 | 415 El Camino Del Mar Revision to pa#: 202501148290 to replace (2) existing glass block windows to fixed casement windows. clarify all final proposed window sizes per existing rough opening size. Complete | Revision or supplement | Complete | 1 month | |
| Mar 25, 2025 | 415 El Camino Del Mar Revision to pa #202501148290 to capture structural and architectural changes based on field conditions Complete | Revision or supplement | Complete | Within 1 month | |
| Jan 14, 2025 | 415 El Camino Del Mar Addition of elevator spanning all 3 floors. remodel of interior non structural walls and bathrooms. including remodel of kitchen finishes and fixtures. Complete | Home remodelType unconfirmed | Complete | Within 1 month | |
| Jul 14, 2022 | 181 Fremont St #56 43/f, unit 56a: new wood floors, non structural reconfiguration of kithen, den, master bdrmoom closet, and removal of entry closets. open drywall for the purpose of minor elec work. electrical and sprinkler under sep permits Issued | Home remodel | Issued | Within 1 month | |
| Aug 6, 2021 | 152 Lombard St Level 1 lighting control revvision to add occupancy sensors. rev to pa202009023303. maher n/a. Complete | Revision or supplement | Complete | Within 1 month | |
| Jun 25, 2021 | 150 Lombard St Bldg 1: revision to pa 202009023320. level 1 lighting control revision to add occpancy sensors. Complete | Revision or supplement | Complete | Within 1 month | |
| Jan 25, 2021 | 1750 Taylor St #1701 Unit 1701: new kitchen millwork/appliances. new master bathroom & fixturs and new living room celing - luminares. amend to (e) pa202007280867. Complete | Revision or supplement | Complete | 3 months | |
| Dec 11, 2020 | 150 Lombard St Reference to pa #202009023320 - minor interior framing revision to add metal stud and gypboard clad "pilasters" to support permitted light cove. fixtures at floor 2-9 Complete | Revision or supplement | Complete | 2 months | |
| Dec 11, 2020 | 152 Lombard St Reference to pa #202009023303 - minor interior framing revision to add metal stud and gyp board clad "pilasters" to support permitted light cove fixture at floors 2-7 Complete | Revision or supplement | Complete | 2 months | |
| Sep 23, 2020 | 465 Davis Ct Minor finish+lighting upgrade to the arcade of (e) build.replacment non-original(e)scones with globe scones that reflects original light fixtrue; barrier removal by means of replacement of a mix of(e)retail stroefront doors with(n)doors; infill walls below(e)exterior stairs. new mosaic accent tile. Cancelled | OtherType unconfirmed | Cancelled | — | |
| Sep 23, 2020 | 500 Battery St Minor finish+lighting upgrade to the arcade of (e) build.replacment non-original(e)scones with globe scones that reflects original light fixtrue; barrier removal by means of replacement of a mix of(e)retail stroefront doors with(n)doors; infill walls below(e)exterior stairs. new mosaic accent tile. Cancelled | OtherType unconfirmed | Cancelled | — | |
| Sep 22, 2020 | 460 Davis Ct Minor finish+lighting upgrade to the arcade of (e) build.replacment non-original(e)scones with globe scones that reflects original light fixtrue; barrier removal by means of replacement of a mix of(e)retail stroefront doors with(n)doors; infill walls below(e)exterior stairs. new mosaic accent tile. Cancelled | OtherType unconfirmed | Cancelled | — | |
| Sep 14, 2020 | 154 Lombard St Interior remodel of common corridors include new tile flooring on level 1, new finishes (wall to wall carpet, wall covering, paint). and replacing existing light fixtures wiht new low energy light fixtures. new led lighting at select locations. Complete | Home remodelType unconfirmed | Complete | Within 1 month | |
| Sep 10, 2020 | 156 Lombard St Common area: interior remodel to include new tile flooring on level 1, new finishes, walls, carpet, wall coverings, paint. replace existing light fixtures w/ new led fixtures, new led lighting at select locations as required to meet code. Complete | Home remodelType unconfirmed | Complete | 1 month | |
| Sep 2, 2020 | 150 Lombard St Bldg #1: interior remodel of existing building interior common corridors: new tile flooring on level 1, new finishes (wall to wall carpet, wall covering, paint) and replacing exisitng light fixtures with new low energy (lep) light fixtures; new led lighting at select locations as required by code. Issued | Home remodelType unconfirmed | Issued | 1 month | |
| Sep 2, 2020 | 152 Lombard St #101 Bldg #2: interior remodel of existing building interior common corridors: new tile flooring on level 1, new finishes (wall to wall carpet, wall covering, paint) and replacing exisitng light fixtures with new low energy (lep) light fixtures; new led lighting at select locations as required by code. Complete | Home remodelType unconfirmed | Complete | Within 1 month | |
| Jan 13, 2020 | 666 Post St #1604 Unit 1604- kitchen & 2 bathrooms remodel, minor non-structural interior alterations, elec panel relocate/upgrade new lighting; new gas line to (e) masonry fireplate, mich finish upgrades, paint, wood floor Complete | Home remodel | Complete | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you D Ian Bevilacqua? Request a correction.