Daniel Paul Morago
Architect · Mission Design
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-37860First issued May 21, 2019, expires Jun 30, 2027.
Source: DCA License Search, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 14 permits since 2019, 14 in the last 5 years. Latest filed Jun 10, 2026.
- What kind of projects?
- Home remodel 6 · Legalize or fix a violation 3 · Other 2
- How long do their permits take?
- Home remodel: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 6 permits in San Francisco
Time to get a permit
Median from filing to permit, from 4 issued permits filed since 1966; 1 still in review. City is the San Francisco median for the same kind of review, from 5,514 permits.
Where
- Mission3
- Potrero Hill1
- Castro/Upper Market1
- Financial District/South Beach1
Most recent
- 657 Arkansas St1st fl: renovate (e) bedroom closets, bathroom and home office. 2nd fl: renovate (e) kitchen and dining areas, remove and replace (e) wood burning fireplace with new gas fp and add 2new skylights. replace (e) house gas furnace with new heat pump and replace (e). replace (e) tank water heater with neJun 10, 2026Filed
- 3828 19th St #0Renovate (e) kitchen enlarge kitchen wall opening to adjacent dinng room at pantry alcove new vented hood for (e) rangeSep 1, 2022Complete
- 640 Davis St #4Unit #4: remodel (e) kitchen, master & hall bathrooms & powder room. new openings between kitchen & living/dining rooms. renovate (e) stair guardrails. new rooftop condensing unit to add new cooling to (e) forced air heating system.Jan 31, 2022Complete
- 3651 20th StRenovate and enlarge existing half bath into a full bath w/ shower at 2nd flr. replace existing tank water heater w/ new on-demand water heater.Apr 7, 2021Cancelled
- 879 A Dolores StRenovate / enlarge (e) 1st flr dwell unit. convert storage to (n) bedrm, renovate (e) bath & add (n) laundry, relocate (e) kitch, add (n) rear french doors & (n) deck at grade, add (n) gas forced air furnace, relcoate (e) sump pumpJul 21, 2020Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Jun 10, 2026 | 657 Arkansas St 1st fl: renovate (e) bedroom closets, bathroom and home office. 2nd fl: renovate (e) kitchen and dining areas, remove and replace (e) wood burning fireplace with new gas fp and add 2new skylights. replace (e) house gas furnace with new heat pump and replace (e). replace (e) tank water heater with ne Filed | Home remodel | Filed | — | |
| Aug 21, 2025 | 39 West View Av To abate nov 202536360- remove as built open metal cablerail guards at front entry stair and replace with partial height solid guard walls with stucco finish. replace (e) concrete pavers at front stairs with (n) brick pavers Complete | Legalize or fix a violation | Complete | 1 month | |
| Jul 16, 2025 | 45 San Andreas Wy Remodel (e) entry porch with replacement entry doors and sidelights and add a (n) adjacent deck (at grade). replace (e) stairs from street to entry porch and replace (e) rataining walls at front property line. replace (e) cantileverd balcony at 3rd floor, with (n) sliding patio doors. Issued | Deck, stairs or patio cover | Issued | Within 1 month | |
| Jun 11, 2025 | 2565 Mission St Documenting occupant load due to new owner and layout (no change of use or tenant improvement work). Complete | Commercial or tenant improvementType unconfirmed | Complete | Within 1 month | |
| May 27, 2025 | 315 Hanover St Comply w/nov 202428611 fire damage repair, includinhg struct. repairs to fire damaged walls & roof w/ replacement of all finihes, fixtures, windows & doors. remove unpermitted rear portch & replace w/ new at grade wood deck (< 30"). replace e) furnace & all elec & lighting. replace front 3 windows Complete | Legalize or fix a violation | Complete | 5 months | |
| Jul 19, 2024 | 448 Duncan St Voluntary legalization of unwarranted rear 1-story bedroom and bathroom and deck and of unwarranted home office bath at rear of (e) garage. at main level. renovation of (e) bath, replace kitchen appliances and windows at rear replace (e) whole house gas furnace and water heater. repainting exterior Complete | Legalize or fix a violation | Complete | Within 1 month | |
| Jul 12, 2024 | 448 Duncan St Front facade renovation with replacement 2 aluminum clad casement windows & 1 garage door in existing openings. (no structural modifications) new painted stucco & finish walls Complete | Other | Complete | Within 1 month | |
| Feb 22, 2024 | 625 Grand View Av Front facade renovation including renovated windows, replacement of garage door & new stucco finish, repaint side & rear exterior elevations. no structural modifications. Complete | Other | Complete | 2 months | |
| Dec 11, 2023 | 45 San Andreas Wy Expand existing garage at front facade with new roof deck above garage addition. Issued | Addition | Issued | 8 months | |
| Sep 1, 2022 | 3828 19th St #0 Renovate (e) kitchen enlarge kitchen wall opening to adjacent dinng room at pantry alcove new vented hood for (e) range Complete | Home remodel | Complete | Within 1 month | |
| Jan 31, 2022 | 640 Davis St #4 Unit #4: remodel (e) kitchen, master & hall bathrooms & powder room. new openings between kitchen & living/dining rooms. renovate (e) stair guardrails. new rooftop condensing unit to add new cooling to (e) forced air heating system. Complete | Home remodel | Complete | Within 1 month | |
| Apr 7, 2021 | 3651 20th St Renovate and enlarge existing half bath into a full bath w/ shower at 2nd flr. replace existing tank water heater w/ new on-demand water heater. Cancelled | Home remodel | Cancelled | — | |
| Jul 21, 2020 | 879 A Dolores St Renovate / enlarge (e) 1st flr dwell unit. convert storage to (n) bedrm, renovate (e) bath & add (n) laundry, relocate (e) kitch, add (n) rear french doors & (n) deck at grade, add (n) gas forced air furnace, relcoate (e) sump pump Complete | Home remodel | Complete | 2 months | |
| Oct 15, 2019 | 292 San Jose Av #0 At existing 3rd fl. renovate (e) kitchen, relocate washer/dryer into enlarged closet at hall area, add new opening between (e) living room and kitchen Complete | Home remodel | Complete | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Daniel Paul Morago? Request a correction.