David Alan De Valeria
Architect · M. Moser Associates · Cary
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-21877First issued Oct 26, 1990, expires Jul 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 47 permits since 2013, 47 in the last 5 years. Latest filed Oct 5, 2026.
- What kind of projects?
- Commercial or tenant improvement 43 · Other 2 · Home remodel 1
- How long do their permits take?
- Commercial or tenant improvement: 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 43 permits in San Francisco
Time to get a permit
Median from filing to permit, from 43 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 23,779 permits.
Where
- Financial District/South Beach36
- Chinatown3
- Russian Hill2
- Mission Bay1
Most recent
- 555 California St #051st floor: tenant improvement for existing cooking kitchen to remain with select equipment changes. existing type2 exhaust hood to remain. grease intercepter in new slab opening.feature retractable wall system with structural upgrades.structural seismic anchorage to be deferred.Oct 5, 2026Issued
- 555 California St #051st floor: interior tenant improvment to replace private offices with open workstations and conference rooms. mep deferred. kitchen and stone wall under separate permit.remodel core restrooms.Aug 18, 2026Issued
- 525 Market StAnchoring (3) existing single phone booths. total work area = 3 x 11 sf = 33 sfAug 3, 2026Issued
- 555 California St50th and 51st floors: demo only per ab-017 to remove existing office space. demo partitions, doors, finishes, light fixtures, and mep.Jun 9, 2026Issued
- 655 Beach St2/f suite 210: interior tenant improvement to (e) office space including non-structural partitions, doors, structural operable partition, suspended ceilings, casework, finishes and furniture. no change in occupancy or tenant.Dec 15, 2025Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Oct 5, 2026 | 555 California St #0 51st floor: tenant improvement for existing cooking kitchen to remain with select equipment changes. existing type2 exhaust hood to remain. grease intercepter in new slab opening.feature retractable wall system with structural upgrades.structural seismic anchorage to be deferred. Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Aug 18, 2026 | 555 California St #0 51st floor: interior tenant improvment to replace private offices with open workstations and conference rooms. mep deferred. kitchen and stone wall under separate permit.remodel core restrooms. Issued | Commercial or tenant improvement | Issued | 1 month | |
| Aug 3, 2026 | 525 Market St Anchoring (3) existing single phone booths. total work area = 3 x 11 sf = 33 sf Issued | Commercial or tenant improvement | Issued | 1 month | |
| Jul 14, 2026 | 555 California St 50th floors: office t.i - new partitions and offices. new finishes on existing stairs between 50 and 51 floors. mep deferred. ref demo permit 202606092855. Issued | Revision or supplementType unconfirmed | Issued | Within 1 month | |
| Jun 9, 2026 | 555 California St 50th and 51st floors: demo only per ab-017 to remove existing office space. demo partitions, doors, finishes, light fixtures, and mep. Issued | Commercial or tenant improvementType unconfirmed | Issued | Within 1 month | |
| Dec 15, 2025 | 655 Beach St 2/f suite 210: interior tenant improvement to (e) office space including non-structural partitions, doors, structural operable partition, suspended ceilings, casework, finishes and furniture. no change in occupancy or tenant. Complete | Commercial or tenant improvement | Complete | 3 months | |
| Aug 25, 2025 | 160 Spear St 10th, 11th, 12th, 13th, 15th, and 19th floors. addition of phone booths and structural anchorage. Complete | Commercial or tenant improvementType unconfirmed | Complete | 1 month | |
| Aug 6, 2025 | 350 Bush St 18/fl-(n) glass doors at office 1827 and 1847. 19/f-new countertop on break area (1932) and window film. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| May 30, 2025 | 655 Beach St Exterior work only. new porcelain tile deck on pedestals, on top of existing concrete deck. Filed | Deck, stairs or patio cover | Filed | — | |
| May 29, 2025 | 650 California St #0 24th & 25th/f: office t.i. renovation total 7912 sf. mep defferred. new patitions & offices Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| May 9, 2025 | 55 Spear St For adminstrative purposes only. change of address from 1 market st to 55 spear st for pa #2025-0122-8840 (b/l 3713/007) Complete | Other | Complete | Within 1 month | |
| Apr 28, 2025 | 55 Spear St For administrative purposes only, change of address from 1 market st to 55 spear st for pa# 202412166922 (revision to 202410102710, b/l 3713/007, 1 market st) & 202410102710 (t.i. for 35th level, b/l 3713/006, 1 market st) Complete | Revision or supplement | Complete | Within 1 month | |
| Jan 24, 2025 | 160 Spear St 10th flr: t.i. improvement of (e) tenant space. minor demo and construction of (n) non-load bearing walls. millwork, lighting, and furniture. deferred: el, plumb, fire sprinkler, smoke detection and fire alarm system installed to be under separate permit. fully sprinkler bldg. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Jan 22, 2025 | 1 Market St Interior ti of (n) communicating stair between levels 34 & 35 & (e) communicating stair between levels 33 & 34. new stair construction to include slab demo as well as finishes, lighting & fire safety. Complete | Commercial or tenant improvement | Complete | 1 month | |
| Dec 16, 2024 | 1 Market St 35th fl revision to 202410102710 to include minor partition changes, corresponding mep and needed structural beam penetration Complete | Revision or supplement | Complete | 1 month | |
| Oct 30, 2024 | 160 Spear St 11th floor: interior t.i. of existing tenent space. minor demolition and construction of new non load bearing walls. millwork, lighting and furniture. Complete | Commercial or tenant improvement | Complete | 1 month | |
| Oct 10, 2024 | 1 Market St 35th fl: interior ti construction of non load bearing partitions, new doors, frames & glazing, new ceilings, lights, new millwork & finishes. modifications to mech & plumbing systems shall allow base building infrastructure to remain intact & operational Complete | Commercial or tenant improvement | Complete | 1 month | |
| Sep 17, 2024 | 160 Spear St 14/fl- structural anchorage for (e) phone booths. deferred submittals :sprinkerls, smoke detection and fire alarm detection under separate permit if needed Complete | Home remodelType unconfirmed | Complete | Within 1 month | |
| Aug 28, 2024 | 160 Spear St 14th fl add (agrr) all gender restroom with shower. add a sink to existing wellness room. add bench in shower room, identify accessible locker Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Aug 28, 2024 | 160 Spear St 3rd fl tenant improvement construction of non load bearing walls, celings & lighting Complete | Commercial or tenant improvement | Complete | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you David Alan De Valeria? Request a correction.