CheckMyDesigner

David Ben Powyszynski

Architect · The Samuel Group · Allen

Public records

From the licensing board and the city of San Francisco.

The short answer

Licensed?
License activeArchitect C-11879First issued May 14, 1981, expires Sep 30, 2027.

Source: DCA license roster, retrieved Nov 5, 2026

Verify on DCA License Search

Any board discipline?
None found.

We searched the California Architects Board enforcement list on Nov 5, 2026.

Worked in San Francisco?
9 permits since 2019, 9 in the last 5 years. Latest filed Sep 12, 2025.
What kind of projects?
Commercial or tenant improvement 7 · Other 2
How long do their permits take?
Commercial or tenant improvement: 1 month. City typical for the same review: within 1 month.

Permits filed each year

San Francisco permits by the year they were filed. The last 5 years are in blue.

What are you planning?

Pick your kind of project to see their permits for it.

Commercial or tenant improvement: 7 permits in San Francisco

From 2019 to 2025, latest filed Sep 12, 2025.
Permits
11 permits that name David Ben Powyszynski, newest first, including 2 revisions or supplements that are not counted. Select a permit to see the full record.
FiledProjectOpen
Sep 12, 20253624 Geary Bl

Construction of new wall partiton at the teller lines, installation new millwork including teller line with bullert resistant panels, countertop and cabinets

Complete
Jun 26, 2023292 Battery St

Installing new millwork and flooring at (e) staff rm 106 within wells fargo branch

Cancelled
Jun 7, 2023333 Market St

Interior renov of (e) wells fargo bank, exterior walk-up atm/night drop, new interior wall partitions, ext atm wall, millwork/teller line, breakroom, it room, work room, new restroom, new finishes, ceiling fixtures to be installed

Complete
May 9, 2023292 Battery St

Remove 2 atm exterior storefront and replace with solid storefront panels with new tinted glazing to match existing.

Complete
Sep 14, 2022303 02nd St

Removal of (1 of 2) (e) atm's @ wells fargo bank exterior storefront and replacing solid storefront panels with new tinted glazing to match existing. (inside property line)

Issued
Jun 15, 2022303 02nd St

Revision to pa 2021-1117-2614 1 supply & return grille added. no new fsd are being added. add lighting and power to first floor.

Complete
Jun 1, 2022303 02nd St

Revision to pa# 202111172614. existing restroom to remain unchanged.

Complete
Jan 18, 20222100 Chestnut St

Tenant improvement interior ti in (e) shell space, including including interior walk-up atms, for (n) wells fargo bank; the proposal is to establish a formula retail use to dba wells fargo @ 2100 chestnut st (currently occupied by pottery barn). the proposed project will allow (e) wells fargo

Complete
Nov 17, 2021460 Sutter St

Ground fl - remove furniture - equipment and flooring in existing wells fargo bank; install new interrior wall partitions (non bearing); provide new furniture and interior finishes

Complete
Nov 17, 2021303 02nd St

Ground fl remove furniture, mill work, equipment and flooring in (e) wells fargo bank; install new interior finishes and new wall partitions (non bearing) new furniture

Complete
Sep 3, 20191595 Sloat Bl

Ti 200sf conference room- wall partitions - new finishes - hvac diffusers.

Complete

Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.

Are you David Ben Powyszynski? Request a correction.