Dominic Chu
Engineer · Consulting Struc. Engr. · San Mateo
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeStructural Engineer S-2360First issued Jan 21, 1981, expires Mar 31, 2028.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 47 permits since 2006, 47 in the last 5 years. Latest filed Oct 2, 2026.
- What kind of projects?
- Seismic retrofit or foundation 26 · Home remodel 12 · Legalize or fix a violation 3
- How long do their permits take?
- Seismic retrofit or foundation: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Seismic retrofit or foundation: 26 permits in San Francisco
Time to get a permit
Median from filing to permit, from 26 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 18,265 permits.
Where
- Marina4
- West of Twin Peaks3
- Castro/Upper Market3
- Inner Richmond3
Most recent
- 3527 21st St #0Voluntary strengthening by adding plywood, bolts, clips and hold-downs to upper and lower crawlspace levels. add a retaining wall to the front foundation at upper crawlspace.Jan 22, 2026Complete
- 11 Imperial AlEngineered voluntary structural strengthening and partial foundation replacementOct 10, 2025Complete
- 643 Spruce StRepair (e) foundation wall & shear wall & footingJan 30, 2025Issued
- 324 Holyoke St1. replace the creacked portion of stem wall of footing with new cap for improvement. 2. add plywood clips, bolts & sill plate connector to rear wall of garage for voluntary seismic improvement.Jun 28, 2024Complete
- 1419 20th StVoluntary seismic upgrade per engineered plans in accordance to ca chapter a3. add plywood, clips, bolts & sill plate connector to cripple studs of crawlspace.Jun 28, 2024Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Oct 2, 2026 | 75 Santa Ana Av Kitchen remodel, converting and connecting garage 1/2 only into livable space, 1 bathroom will be demoed, and an addition/replacing a glass sunroom into a regular roof converting the space into a dining room. Filed | Addition | Filed | — | |
| Mar 11, 2026 | 245 South Hill Bl Revision - 202511250460- voluntary seismic retrofit in accordance with chapter a3 per the engineered plan. Complete | Revision or supplement | Complete | Within 1 month | |
| Jan 22, 2026 | 3527 21st St #0 Voluntary strengthening by adding plywood, bolts, clips and hold-downs to upper and lower crawlspace levels. add a retaining wall to the front foundation at upper crawlspace. Complete | Seismic retrofit or foundation | Complete | Within 1 month | |
| Dec 17, 2025 | 571 Monterey Bl Voluntary improvment per engineer plans. revision due to changes onsite new footing required. revision to bpa#: 202511109263 Complete | Revision or supplement | Complete | Within 1 month | |
| Nov 10, 2025 | 571 Monterey Bl Voluntary improvement per engineer plans Complete | Home remodelType unconfirmed | Complete | Within 1 month | |
| Oct 31, 2025 | 11 Mars St Revision to pa # 2024-1115-5113: at (e) 3rd fl door/window openings, remove and replace (e) structural posts & beams with new. replace (e) roof-supporting beam. replace (e) window headers. alter ceiling framing to accomodate new kitchen vent- see structural drawings Complete | Revision or supplement | Complete | Within 1 month | |
| Oct 10, 2025 | 11 Imperial Al Engineered voluntary structural strengthening and partial foundation replacement Complete | Seismic retrofit or foundation | Complete | Within 1 month | |
| Aug 19, 2025 | 1640 Florida St Revision to permit 202401103736. foundation and voluntary strengthing per engineered plans. Complete | Revision or supplement | Complete | Within 1 month | |
| Jan 30, 2025 | 643 Spruce St Replacement of (e) rear yard stairs (exposed) Issued | Deck, stairs or patio cover | Issued | 4 months | |
| Jan 30, 2025 | 643 Spruce St Repair (e) foundation wall & shear wall & footing Issued | Seismic retrofit or foundation | Issued | Within 1 month | |
| Aug 7, 2024 | 160 Saint Germain Av Voluntary structural strengthening per engineer plans. Complete | Home remodel | Complete | Within 1 month | |
| Jun 28, 2024 | 324 Holyoke St 1. replace the creacked portion of stem wall of footing with new cap for improvement. 2. add plywood clips, bolts & sill plate connector to rear wall of garage for voluntary seismic improvement. Complete | Seismic retrofit or foundationType unconfirmed | Complete | 2 months | |
| Jun 28, 2024 | 1419 20th St Voluntary seismic upgrade per engineered plans in accordance to ca chapter a3. add plywood, clips, bolts & sill plate connector to cripple studs of crawlspace. Complete | Seismic retrofit or foundation | Complete | Within 1 month | |
| Apr 3, 2024 | 179 Brompton Av Voluntary seismic retrofit Issued | Seismic retrofit or foundation | Issued | Within 1 month | |
| Feb 21, 2024 | 316 Moraga St Voluntary lateral strenghening. calculations not submitted and not reviewed. this permit application does not qualify for a seismic retrofit. Issued | Home remodel | Issued | Within 1 month | |
| Dec 13, 2023 | 57 Gladys St Remodel of (e) kitchen, (e) bathroom, and (e) powder room. addition of 68 sf for (n) office and (n) hallway Withdrawn | Addition | Withdrawn | — | |
| Jul 3, 2023 | 11 Mars St Add plywood clips bolts & sill plate conncector to cripple wall @ crawl space for voluntary seismic improvement. add stong walls below bedroom & sun rm for voluntary seismic improvement Complete | Seismic retrofit or foundation | Complete | 3 months | |
| May 18, 2023 | 61 Divisadero St Improvement to (e) retaining wall Complete | Retaining wall or site work | Complete | 4 months | |
| Mar 1, 2023 | 238 Staples Av Revision 202302081647 installation of dowells in e concrete Complete | Revision or supplement | Complete | Within 1 month | |
| Sep 30, 2022 | 40 Villa Tr Reinforce the (e) garden wall with new 8" concrete for voluntary improvement. Complete | Retaining wall or site work | Complete | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Dominic Chu? Request a correction.