CheckMyDesigner

Douglas Gregory Tom

Architect · Tef Design · San Francisco

Public records

From the licensing board and the city of San Francisco.

The short answer

Licensed?
License activeArchitect C-12405First issued Oct 23, 1981, expires Oct 31, 2027.

Source: DCA license roster, retrieved Nov 5, 2026

Verify on DCA License Search

Any board discipline?
None found.

We searched the California Architects Board enforcement list on Nov 5, 2026.

Worked in San Francisco?
115 permits since 2005, 115 in the last 5 years. Latest filed Feb 24, 2025.
What kind of projects?
Commercial or tenant improvement 60 · New building 26 · Legalize or fix a violation 13
How long do their permits take?
Commercial or tenant improvement: within 1 month. City typical for the same review: within 1 month.

Permits filed each year

San Francisco permits by the year they were filed. The last 5 years are in blue.

What are you planning?

Pick your kind of project to see their permits for it.

Commercial or tenant improvement: 60 permits in San Francisco

From 2005 to 2025, latest filed Feb 24, 2025.

Time to get a permit

Theirs
Within 1 month
City
Within 1 month

Median from filing to permit, from 45 issued permits filed since 1966; 10 still in review. City is the San Francisco median for the same kind of review, from 15,396 permits.

Where

  • Financial District/South Beach18
  • South of Market8
  • Russian Hill5
  • Tenderloin4
Permits
172 permits that name Douglas Gregory Tom, newest first, including 57 revisions or supplements that are not counted. Select a permit to see the full record.
FiledProjectOpen
Feb 24, 2025660 03rd St

Ground floor- minor interior office upgrade at level 1. (n) single user restroom/shower. connecting suites 100 and 110 by removing and relocating common corridor walls.

Complete
Jun 15, 2023450 Sansome St #0

16/f: operable partition wall ref pa 2022-1223-9077 & 2021-0728-5242

Complete
Jun 9, 2023660 03rd St

Interior office renovation at level 1, suite 110a/b, interior main lobby renovation, new interior walls, storefront glazing, finishes, doors, hardware, access control, millwork at break area, plumbing area, lighting controls, power/data outlet. ref: 202205265059. fire alarm/fire sprinklers deferred.

Complete
Dec 23, 2022450 Sansome St #0

Revision to pa# 2021-0728-5242, removing operable wall from scope along w/ structural support

Complete
Dec 9, 2022660 03rd St

Ground flr - (n) opening at (e) brick wall. reloacation of (e) electrical panel currently located at proposed (n) brick opening. removing gyp/mtl stud wall & associated doors @ (e) brick opening. portion of (n) concrete infill wall to be gyp/mtl stud wall for potnetial future double doors....

Complete
May 26, 2022660 03rd St

Adminstrative permit to document a change of use from retail to office. total conversion is approx 40,212 sqft change to building occupancy code. no change of use to basement. change of use approved under pc motion no. 21025

Complete
Sep 2, 2021116 Channel

Amend to pa 202103186794-s1. erect fence around playground. details requested by bid. the fence was already approved on pa# 202103186794. this permit is to specify the foundation details of this fence.

Issued
Jul 28, 2021450 Sansome St #0

16/f: demo non-structural partitions, fixtures, millwork & finishes. construction of new non-structural partitions, fixtures, millwork & finishes. structural support (1) moveable partition

Complete
Mar 18, 2021116 Channel

First time ti of level 1 suite. the dahlia school of sf is building a child care center w/ 2 main rooms: toddler & pre-school room, 2 admin spaces, multi-purpose space, & new fenced exterior play area. mep deferred.

Issued
Dec 19, 2019855 A Howard St

Ti to the 1st fl entry lobby to 2nd fl. 2nd fl demolition of (e) non-structural partitions, fixtures, millwork & finishes. construction of (n) non-structural partitions, fixtures, millwork & finishes. change of use to office on 2nd floor.

Cancelled
Dec 17, 20192550 Van Ness Av

Priority process - change of use.r1(hotel to r-2(dormitory).pursuant dcp case 20080586-fr last legal tourist hotel use to 136 grp hsing bedrooms&306 beds w/student housing use char.add wk incl new curb cut&infill.class 1&2 bicycle parking & signage.maher n/a.

Filed
Oct 22, 2019660 03rd St

Replace main entry doors maher not req

Cancelled
Aug 23, 20191061 Market St

Addition of 2 meeting rooms to existing office space on 2nd floor. no demo, existing ceiling, lighting & sprinklers to remain. work on 2nd story.

Issued
Apr 23, 2019499 Alabama St

Replacement of (e) entry doors, add (n) door & wall to separate entry vestibule, flooring mod for (n) sloped plane, add (n) exterior courtyard rolling door which is not visible from right of way, all work in theater space only.

Issued
Dec 13, 2018575 Market St

18th fl, ste 1850 ti demo of (e) non-structural partitions, doors, glazing & ceiling etc. mep, life safety and sprinklers under separate permit

Complete
Nov 16, 2018900 North Point St #534

Erect an electric single faced roof sign (occupancy hotel)

Withdrawn
Nov 16, 2018900 North Point St #534

#534 - addition of gas line for fire pit up from lower storage level to patio. seating tables & gas heaters provided on patio. (occupancy hotel)

Issued
Nov 15, 2018575 Market St

18/19/20/29th floors: renovation of common areas, corridors and restrooms. n/a for maher.

Complete
Nov 1, 2018660 03rd St

T.i to (e) offices to incl (n) finishes at restrooms and kitchen areas w/ plumbing fixture replacement. 3rd and 4th floor only.

Complete
Sep 24, 2018312 Sutter St

T.i. on level 4. scope of work includes: removal and construction of interior non-load bearing partitions, ceiling. electrical lighting and mechanical to be completed under a sep permit. no sturctural orplumbing work.

Complete

Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.

Are you Douglas Gregory Tom? Request a correction.