Francisco J Matos
Architect · Architects Sf · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-34078First issued Mar 4, 2013, expires Feb 28, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 306 permits since 2013, 306 in the last 5 years. Latest filed Nov 3, 2026.
- What kind of projects?
- Home remodel 94 · Commercial or tenant improvement 51 · Addition 38
- How long do their permits take?
- Home remodel: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 94 permits in San Francisco
Time to get a permit
Median from filing to permit, from 85 issued permits filed since 1966; 3 still in review. City is the San Francisco median for the same kind of review, from 25,073 permits.
Where
- Pacific Heights9
- Castro/Upper Market7
- West of Twin Peaks7
- Mission6
Most recent
- 230 Noriega StRelocation of stairs from first and second floor; (n) powder room; relocate stairs from second to first floor. (n) laundry remodel (e) bathroom.exterior - replace the sides and rear wood siding. cover (e) storage to family room. covert part of garage to habitable space.Jul 24, 2026Issued
- 300 Gough St #1Remodel e bathroomsJun 29, 2026Filed
- 1335 16th AvInterior remodel at unit 1 to combine adjacent storage area, x 2 in kind window relacement. new finishes, lighting, electrical throughout storage area.May 8, 2026Issued
- 150 Wilde AvRemodel of bathroom, remodel, in kind kitchen, new heat pump. new pocket door between kitchen and laundry. work in rear building.Mar 24, 2026Issued
- 376 Union StNew aluminum clad front window front builing. unit 378 3rd flr. remove wall between living room and bedroom. unit 380 fourth floor: remove wall between living room and office, expand powder room to full bath.Mar 9, 2026Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Nov 3, 2026 | 704 North Point St New construction of a 4 story, 1 dwelling mix building.busness residential type v Filed | New building | Filed | — | |
| Oct 27, 2026 | 1011 Howard St To comply with #202659382. addition of 2 new windows in lightwell on 4th floor. and 4 skylights in the hallwys for natural light. Filed | Revision or supplementType unconfirmed | Filed | — | |
| Oct 23, 2026 | 302 Greenwich St Document a joint sffd/dbi administrative bulletin ab #005 pertaining two doors and two gates. revision to 202606052680. Complete | Revision or supplement | Complete | Within 1 month | |
| Oct 16, 2026 | 11 Mars St Revision to pa#: 202411155113 and 2026-0108-3480 (recommencement of -5113): removal of proposed half bath on the 3rd flr from the original scope of work. Issued | Revision or supplement | Issued | Within 1 month | |
| Oct 15, 2026 | 841 Ocean Av Revision to permit 202503192543. maintain existing curbcut. provide new interior layout for first floor adu. Filed | Revision or supplement | Filed | — | |
| Oct 13, 2026 | 1945 Lyon St Revision to pa #202606042523. additional demo of fire damaged walls on the 3rd floor. Filed | Revision or supplement | Filed | — | |
| Oct 2, 2026 | 646 Duncan St Interior renovations on 1st floor. horizontal addition & interior renovation on 2nd floor, including new rear deck, vertical addition to include new 3rd floor & decks. ab-112 Filed | Addition | Filed | — | |
| Sep 4, 2026 | 610 Fillmore St #0 Strenghten/replace (e) foundations and voluntary seismic retrofit of the ground floor using plywood shear walls. Filed | Seismic retrofit or foundation | Filed | — | |
| Sep 3, 2026 | 149 Casitas Av New state adu in the garage area Filed | ADU | Filed | — | |
| Aug 21, 2026 | 226 06th St Revision to pa# 200806164548: removal of 4/f addition. removal of south penthouse. elevator to rise to 3/f only. minor interior changes throughout. Issued | Revision or supplement | Issued | 1 month | |
| Aug 13, 2026 | 1295 Holloway Av Reconfigure layout of kitchen, bathrooms & skylights. update (e) wetbar & plumbing. approved under previous pa#9009636, revise windows & doors size. retain as-built condition of basement stair. revision to pa#201911016253 Issued | Revision or supplement | Issued | 2 months | |
| Aug 7, 2026 | 28 Allen St Rev to pa# 2024-0313-7746: adjust configuration of lighthouse at 3rd fl. to align with light well below. discard all replacement of windows in light well. convert study to home office at 1st and 3rd fl. Issued | Revision or supplement | Issued | Within 1 month | |
| Aug 5, 2026 | 28 Allen St New roof deck. reference pa # 201607293726 Filed | Deck, stairs or patio coverType unconfirmed | Filed | — | |
| Jul 24, 2026 | 230 Noriega St Relocation of stairs from first and second floor; (n) powder room; relocate stairs from second to first floor. (n) laundry remodel (e) bathroom.exterior - replace the sides and rear wood siding. cover (e) storage to family room. covert part of garage to habitable space. Issued | Home remodel | Issued | 3 months | |
| Jul 22, 2026 | 1519 Ofarrell St Revision 202512222412- reconfigure kitchen layout Issued | Revision or supplement | Issued | Within 1 month | |
| Jun 29, 2026 | 2868 Bush St Revision to pa# 202507019935: to increase rear spiral stair diameter from 5 ft to 6 ft. Issued | Revision or supplement | Issued | Within 1 month | |
| Jun 29, 2026 | 300 Gough St #1 Remodel e bathrooms Filed | Home remodel | Filed | — | |
| Jun 22, 2026 | 2347 Leavenworth St (n) 496 sq ft roof deck for unit# 2347, extend(e) stair to (n) roof deck. Filed | Deck, stairs or patio cover | Filed | — | |
| Jun 4, 2026 | 1945 Lyon St Infill rear yard 12" h, new 50 sq ft deck for unit 1953. new exclusive 628 sq ft roof decks for units 1949 and 1951. 2/f: reconfigure kithcen and bathroom, (n) 50 sq ft slide deck. 3/f: reconfigure rear floor plans, exterior stairs to roof deck and 2/f windows. Issued | Deck, stairs or patio cover | Issued | 3 months | |
| May 26, 2026 | 639 Banks St Remove existing garage parking and convert garage into an state accessory dwelling unit (adu) with 1 bedroom and 1 bathroom. Triage | ADU | Triage | — |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Francisco J Matos? Request a correction.