CheckMyDesigner

George Donald Soskin

Architect · Huntsman · Alameda

Public records

From the licensing board and the city of San Francisco.

The short answer

Licensed?
License activeArchitect C-9223First issued Apr 15, 1977, expires Dec 31, 2027.

Source: DCA license roster, retrieved Nov 5, 2026

Verify on DCA License Search

Any board discipline?
None found.

We searched the California Architects Board enforcement list on Nov 5, 2026.

Worked in San Francisco?
562 permits since 2013, 562 in the last 5 years. Latest filed Mar 2, 2023.
What kind of projects?
Commercial or tenant improvement 534 · Other 20 · Home remodel 3
How long do their permits take?
Commercial or tenant improvement: within 1 month. City typical for the same review: within 1 month.

Permits filed each year

San Francisco permits by the year they were filed. The last 5 years are in blue.

What are you planning?

Pick your kind of project to see their permits for it.

Commercial or tenant improvement: 534 permits in San Francisco

From 2013 to 2023, latest filed Mar 2, 2023.
Permits
653 permits that name George Donald Soskin, newest first, including 91 revisions or supplements that are not counted. Select a permit to see the full record.
FiledProjectOpen
Mar 2, 20231 Embarcadero Center

15/f: upgrade restrooms to full compliance & new finishes in elevator lobby & common area corridors.no change in occupancy area or use. mep,life safety & sprinklers deferred.

Complete
Dec 28, 20221 California St

19th floor office t.i. to include new partitions, ceilings, finishes & mep.

Complete
Dec 22, 20221 Embarcadero Center

Interior demo and abatement of existing unoccupied 25th & 26th floors including non-structural partitions, ceilings, lighting, plumbing and finishes. replace any removed fire-proofing with new to maintain existing fire ratings. no change in occupancy, use or area. ab-017.

Complete
Dec 20, 2022555 California St #0

46/f - ste 4646: revision to pa 2022-0706-7839 to create new ti closet, 2 private offices, lighting finishes and power

Complete
Dec 15, 20221 Embarcadero Center

Non structural demo. upgrade toilet rooms to full t24 compliance. new finishes in elev lobbyand common corridor. no change in occupancy, use or area. mep, ls, sprinlkers deferred.

Complete
Dec 15, 20221 Embarcadero Center

20th floor: non-structural demo upgrade toilet rooms to full t-24 compliance. new finishes in elevator lobby and common corridor. no change in occupancy, use, or area. mep, life safty, & sprinkler defered.

Complete
Dec 15, 20221 Embarcadero Center

16/f: approx 200 sq. ft. area, revision to (e) suite entry, demo of (e) wall partiiton, storefront, ceiling lights, new partition work, ceiling tilework, doors. no deferred work only trade permits.

Complete
Dec 13, 202250 California St

Non structural demo, new non structural partitoins, paint, new compliant toilet rooms, no change in occupancy use or area. life safety deferred.

Complete
Nov 14, 2022555 California St #0

21/f: interior improvements, non structural partitions, ceiling grid, lighting and finishes.

Complete
Oct 4, 2022535 Mission St

New non structural partitions, glass, doors, millwork and finishes. mep, l/s sprinklers deferred. no change in occupancy, use or area.

Complete
Sep 22, 20222 Embarcadero Center

16th fl - revision to pa 2021-0211-4453 reduce scope delete mep scope

Complete
Sep 22, 20223 Embarcadero Center

Revision to 202202168054. replace scope. delete mep

Complete
Sep 8, 20224 Embarcadero Center

Suite 3410: deferred mechanical and electrical title 24 compliance. ref t.i. pa 202207128225.

Complete
Aug 23, 2022101 02nd St

2/f: non-structural demo. new non-structural partitions, door/frame/hardware, millwork, finishes. no change in occupancy, use or area. mep included in the set. life safety and sprinklers under separate permit.

Cancelled
Aug 2, 20221 Embarcadero Center

15/f: non-struc demo and isntall new non-structural partitions, glazing, dfh, millwork, finishes. no changes in occupany, use or area, mep, sprinklers & fire safety deferred. maher n/a.

Complete
Jul 6, 2022555 California St

46/f ste 4646: ti consist of new non structural partitions, glazing, doors, lighting, finishes, and power. mechanical and electrical.

Complete
Jul 6, 2022301 Howard St

2nd floor. rev to pa 2022-0506-3752 remove two way comm and mushroom button at elevator lobby - remove card readers from elevator lobbies

Complete
Jun 22, 2022555 California St

43rd floor demo of selective partitions, ceilings, millwork, doors/frames and finishes. new paritions, door, paint and lighting. mep deferred.

Complete
Jun 15, 20223 Embarcadero Center

2nd floor:partial floor t.i. new non-load bearing partitions, ceilings and floors. new showerroom and new mep incl fsd's.

Complete
Jun 15, 20223 Embarcadero Center

3rd fl: partial fl t.i., new non-load bearing partitions, ceilings & floor finishes. infill deck. 4th fl: modify (e) shower room into all gender restroom. new mep.

Complete

Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.

Are you George Donald Soskin? Request a correction.