George Donald Soskin
Architect · Huntsman · Alameda
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-9223First issued Apr 15, 1977, expires Dec 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 562 permits since 2013, 562 in the last 5 years. Latest filed Mar 2, 2023.
- What kind of projects?
- Commercial or tenant improvement 534 · Other 20 · Home remodel 3
- How long do their permits take?
- Commercial or tenant improvement: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 534 permits in San Francisco
Time to get a permit
Median from filing to permit, from 515 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 10,218 permits.
Where
- Financial District/South Beach481
- Chinatown25
- Mission Bay9
- South of Market7
Most recent
- 1 Embarcadero Center15/f: upgrade restrooms to full compliance & new finishes in elevator lobby & common area corridors.no change in occupancy area or use. mep,life safety & sprinklers deferred.Mar 2, 2023Complete
- 1 California St19th floor office t.i. to include new partitions, ceilings, finishes & mep.Dec 28, 2022Complete
- 1 Embarcadero CenterInterior demo and abatement of existing unoccupied 25th & 26th floors including non-structural partitions, ceilings, lighting, plumbing and finishes. replace any removed fire-proofing with new to maintain existing fire ratings. no change in occupancy, use or area. ab-017.Dec 22, 2022Complete
- 1 Embarcadero CenterNon structural demo. upgrade toilet rooms to full t24 compliance. new finishes in elev lobbyand common corridor. no change in occupancy, use or area. mep, ls, sprinlkers deferred.Dec 15, 2022Complete
- 1 Embarcadero Center20th floor: non-structural demo upgrade toilet rooms to full t-24 compliance. new finishes in elevator lobby and common corridor. no change in occupancy, use, or area. mep, life safty, & sprinkler defered.Dec 15, 2022Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Mar 2, 2023 | 1 Embarcadero Center 15/f: upgrade restrooms to full compliance & new finishes in elevator lobby & common area corridors.no change in occupancy area or use. mep,life safety & sprinklers deferred. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Dec 28, 2022 | 1 California St 19th floor office t.i. to include new partitions, ceilings, finishes & mep. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Dec 22, 2022 | 1 Embarcadero Center Interior demo and abatement of existing unoccupied 25th & 26th floors including non-structural partitions, ceilings, lighting, plumbing and finishes. replace any removed fire-proofing with new to maintain existing fire ratings. no change in occupancy, use or area. ab-017. Complete | Commercial or tenant improvement | Complete | 3 months | |
| Dec 20, 2022 | 555 California St #0 46/f - ste 4646: revision to pa 2022-0706-7839 to create new ti closet, 2 private offices, lighting finishes and power Complete | Revision or supplement | Complete | 3 months | |
| Dec 15, 2022 | 1 Embarcadero Center Non structural demo. upgrade toilet rooms to full t24 compliance. new finishes in elev lobbyand common corridor. no change in occupancy, use or area. mep, ls, sprinlkers deferred. Complete | Commercial or tenant improvement | Complete | 1 month | |
| Dec 15, 2022 | 1 Embarcadero Center 20th floor: non-structural demo upgrade toilet rooms to full t-24 compliance. new finishes in elevator lobby and common corridor. no change in occupancy, use, or area. mep, life safty, & sprinkler defered. Complete | Commercial or tenant improvement | Complete | 3 months | |
| Dec 15, 2022 | 1 Embarcadero Center 16/f: approx 200 sq. ft. area, revision to (e) suite entry, demo of (e) wall partiiton, storefront, ceiling lights, new partition work, ceiling tilework, doors. no deferred work only trade permits. Complete | Commercial or tenant improvementType unconfirmed | Complete | Within 1 month | |
| Dec 13, 2022 | 50 California St Non structural demo, new non structural partitoins, paint, new compliant toilet rooms, no change in occupancy use or area. life safety deferred. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Nov 14, 2022 | 555 California St #0 21/f: interior improvements, non structural partitions, ceiling grid, lighting and finishes. Complete | Commercial or tenant improvement | Complete | 5 months | |
| Oct 4, 2022 | 535 Mission St New non structural partitions, glass, doors, millwork and finishes. mep, l/s sprinklers deferred. no change in occupancy, use or area. Complete | Commercial or tenant improvement | Complete | 1 month | |
| Sep 22, 2022 | 2 Embarcadero Center 16th fl - revision to pa 2021-0211-4453 reduce scope delete mep scope Complete | Revision or supplement | Complete | Within 1 month | |
| Sep 22, 2022 | 3 Embarcadero Center Revision to 202202168054. replace scope. delete mep Complete | Revision or supplement | Complete | Within 1 month | |
| Sep 8, 2022 | 4 Embarcadero Center Suite 3410: deferred mechanical and electrical title 24 compliance. ref t.i. pa 202207128225. Complete | Revision or supplement | Complete | Within 1 month | |
| Aug 23, 2022 | 101 02nd St 2/f: non-structural demo. new non-structural partitions, door/frame/hardware, millwork, finishes. no change in occupancy, use or area. mep included in the set. life safety and sprinklers under separate permit. Cancelled | Commercial or tenant improvement | Cancelled | — | |
| Aug 2, 2022 | 1 Embarcadero Center 15/f: non-struc demo and isntall new non-structural partitions, glazing, dfh, millwork, finishes. no changes in occupany, use or area, mep, sprinklers & fire safety deferred. maher n/a. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Jul 6, 2022 | 555 California St 46/f ste 4646: ti consist of new non structural partitions, glazing, doors, lighting, finishes, and power. mechanical and electrical. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Jul 6, 2022 | 301 Howard St 2nd floor. rev to pa 2022-0506-3752 remove two way comm and mushroom button at elevator lobby - remove card readers from elevator lobbies Complete | Revision or supplement | Complete | Within 1 month | |
| Jun 22, 2022 | 555 California St 43rd floor demo of selective partitions, ceilings, millwork, doors/frames and finishes. new paritions, door, paint and lighting. mep deferred. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Jun 15, 2022 | 3 Embarcadero Center 2nd floor:partial floor t.i. new non-load bearing partitions, ceilings and floors. new showerroom and new mep incl fsd's. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Jun 15, 2022 | 3 Embarcadero Center 3rd fl: partial fl t.i., new non-load bearing partitions, ceilings & floor finishes. infill deck. 4th fl: modify (e) shower room into all gender restroom. new mep. Complete | Commercial or tenant improvement | Complete | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.