Giuseppe Sircana
Engineer · Ajo Group Inc. · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeCivil Engineer C-71218First issued Mar 23, 2007, expires Jun 30, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 211 permits since 2005, 211 in the last 5 years. Latest filed Aug 30, 2023.
- What kind of projects?
- Seismic retrofit or foundation 129 · Home remodel 25 · Deck, stairs or patio cover 20
- How long do their permits take?
- Seismic retrofit or foundation: 8 months. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Seismic retrofit or foundation: 129 permits in San Francisco
Time to get a permit
Median from filing to permit, from 118 issued permits filed since 1966; 1 still in review. City is the San Francisco median for the same kind of review, from 5,514 permits.
Where
- Mission17
- Pacific Heights13
- Outer Richmond11
- Castro/Upper Market8
Most recent
- 1772 Golden Gate AvComply with san francisco wood-frame seismic retrofit program (soft story), sfbc chapter 4d, 2019 ceac appendix a-4May 27, 2022Complete
- 3947 18th StComply with sf wood frame seismic retrofit program soft story sfbc ch 4d per 2019 cebc appendix a4Nov 24, 2021Complete
- 31 Belmont AvReplace full brick founation, new g/f slab on grade, replace in-kind brick entry stairs,(n) interior stairs to g/f, add'l g/f space within building envelope:remodel 2/f & 3/f bathrooms, (n) 3/f laundry room,(n) new windows but no change to facade.Nov 12, 2020Filed
- 2952 Folsom StSoft story seismic upgrade. ord 66-13 file 1356119Sep 30, 2019Complete
- 250 21st Av #0Voluntary seismic upgrade. legalization & upgrade of unit under separate pa #201812037353Jun 27, 2019Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| May 6, 2025 | 1400 Guerrero St Revision for permit #202501087935 provide 1-a35 angle at entry ceiling framing to corner post. Complete | Revision or supplement | Complete | Within 1 month | |
| Aug 30, 2023 | 60 Montezuma St #0 To comply w/ nov# 202200586. new rear retaining wall. replacement of existing Complete | Legalize or fix a violation | Complete | Within 1 month | |
| May 16, 2023 | 463 Duboce Av Replace rear yard stairs and add deck at 3rd floor. replace wood siding on entire rear with hardie plank. Complete | Deck, stairs or patio cover | Complete | 8 months | |
| May 16, 2023 | 3040 22nd Av Voluntary structural strengthening install one steel frame in garage Complete | Home remodel | Complete | 9 months | |
| Jul 26, 2022 | 72 Stanyan St To comply with nov# 202293113. soil stabilization via geo-grouting along north property line foundation required for excavation work at adjacent property at 66-68 stanyan st under pa# 202205275167 & revision to pa# 202207259208. Complete | Revision or supplementType unconfirmed | Complete | Within 1 month | |
| Jul 25, 2022 | 66 Stanyan St Revision to pa# 2022-0527-5167 change bathroom layout patio walls configuration and foundation along south property line Complete | Revision or supplement | Complete | Within 1 month | |
| Jul 25, 2022 | 1772 Golden Gate Av Revision pa# 202205275164: minor construction changes Complete | Revision or supplement | Complete | Within 1 month | |
| Jun 14, 2022 | 772 Elizabeth St Revision to pa# 2021-0625-3264: new steel beam, new steel frame, new foundation pit for future elevator new grade beam at interior stairs Complete | Revision or supplement | Complete | Within 1 month | |
| Jun 14, 2022 | 1615 Powell St #0 Rev to pa# 2017-0831-6575: eliminate planned wood shear walls and attach (e) diaphram directly to new concrete foundation stems Complete | Revision or supplement | Complete | Within 1 month | |
| May 27, 2022 | 66 Stanyan St Ground floor remodel with new family room, bathroom & wet bar. voluntary seismic upgrade at ground floor. Complete | Home remodel | Complete | Within 1 month | |
| May 27, 2022 | 1772 Golden Gate Av Comply with san francisco wood-frame seismic retrofit program (soft story), sfbc chapter 4d, 2019 ceac appendix a-4 Complete | Seismic retrofit or foundation | Complete | Within 1 month | |
| Dec 23, 2021 | 147 Fillmore St Remodel work to superced bpa#202103025669,and comply with nov#202177213 & complaint#20217150. g/f:structural work for (n)beams above units 145 & 147. (n)strutural beams,remodeld kitchen,4/2 bath,3/4 bath,(n)mbr,bath & closets. Issued | Legalize or fix a violationType unconfirmed | Issued | 2 months | |
| Dec 17, 2021 | 772 Elizabeth St Revision to pa 202112154483 install five new windows on side wall (not visible street) Cancelled | Revision or supplement | Cancelled | Within 1 month | |
| Dec 13, 2021 | 338 Sanchez St #0 Enclosed rear cantilever w./ new walls and foundations. Complete | Addition | Complete | Within 1 month | |
| Nov 24, 2021 | 3947 18th St Comply with sf wood frame seismic retrofit program soft story sfbc ch 4d per 2019 cebc appendix a4 Complete | Seismic retrofit or foundation | Complete | Within 1 month | |
| Jun 25, 2021 | 772 Elizabeth St G/f: structural upgrade. replace entire ground floor. Complete | Home remodel | Complete | Within 1 month | |
| Jun 23, 2021 | 20 Apparel Wy Warehouse voluntary minor structural upgrades. install 2 new steel columns with concrete foundation pads to reinforce deteriorated concrete columns. Complete | Home remodel | Complete | 1 month | |
| Mar 1, 2021 | 3340 18th St Revision to pa# 202011108667. connection changes to steel frame at grid line a. Complete | Revision or supplement | Complete | 1 month | |
| Nov 12, 2020 | 31 Belmont Av Replace full brick founation, new g/f slab on grade, replace in-kind brick entry stairs,(n) interior stairs to g/f, add'l g/f space within building envelope:remodel 2/f & 3/f bathrooms, (n) 3/f laundry room,(n) new windows but no change to facade. Filed | Seismic retrofit or foundation | Filed | — | |
| Nov 10, 2020 | 3340 18th St Voluntary structural upgrade. install new steel frame at front wall. Complete | Home remodel | Complete | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.