CheckMyDesigner

Gregg Alan De Meza

Architect · De Meza + Architecture · San Francisco

Public records

From the licensing board and the city of San Francisco.

The short answer

Licensed?
License activeArchitect C-22839First issued Nov 5, 1991, expires Jul 31, 2027.

Source: DCA license roster, retrieved Nov 5, 2026

Verify on DCA License Search

Any board discipline?
None found.

We searched the California Architects Board enforcement list on Nov 5, 2026.

Worked in San Francisco?
37 permits since 2008, 37 in the last 5 years. Latest filed Apr 6, 2023.
What kind of projects?
Home remodel 20 · Addition 5 · Commercial or tenant improvement 5
How long do their permits take?
Home remodel: 1 month. City typical for the same review: within 1 month.

Permits filed each year

San Francisco permits by the year they were filed. The last 5 years are in blue.

What are you planning?

Pick your kind of project to see their permits for it.

Permits
40 permits that name Gregg Alan De Meza, newest first, including 3 revisions or supplements that are not counted. Select a permit to see the full record.
FiledProjectOpen
Jul 10, 20234232 Mission St

Revision to pa# 202012090669, add bathroom, level basement floor adjacent to adu. add partial height 1-hour rated wall to max 6'-8" above grade at rear yard with new electric service panel.

Issued
Apr 6, 20232121 Webster St #705

Penthouse 5-unit 705: t.i. new partitioning, finishes, millwork, plumbing fixtures, kitchen appliances.

Complete
Apr 6, 20232121 Webster St #704

Penthouse 4-unit 704: t.i. renovation

Complete
Mar 15, 20232121 Webster St #705

Unit re-allocation of 175 sq.ft. from penthouse unit 4 to penthouse unit 5 on 7/f in compliance with planning code section 317 underneath the 25% threshold in that code section.

Complete
Mar 15, 20232121 Webster St #704

Unit re-allocation of 175 sq.ft. from penthouse unit 4 to penthouse unit 5 on 7/f in compliance with planning code section 317 underneath the 25% threshold in that code section.

Complete
Sep 12, 2022668 Page St

All work to be done within the existing boundary of the building. revision to 202109037758. remove kitchen remodel work from scope. remove roposed closet indressing room. remove proposed 2nd window in dressing room. change bathroom w sliding door

Complete
Jul 8, 2022126 23rd Av

Build new wood deck and exterior stair at yard

Complete
Sep 3, 2021668 Page St

#668: interior kitchen and bath remodel of 1 unit. includes new finishes and fixtures, electrical, plumbing, and minor structural.

Issued
Jun 30, 2021126 23rd Av

Foundation upgrade, remodel 2nd floor bath in kind.

Issued
Mar 31, 202122 Temescal Tr

Interior remodel of existing bedroom and bath to include relocating plumbing fixtures and non load bearing walls. replace finishes and fixtures.

Complete
Mar 9, 2021126 23rd Av

Add new unit in single family dwelling in an rh-2 zoning district. vertical and horizontal addition to building. rebuild rear deck.

Withdrawn
Dec 9, 20204232 A Mission St

Convert existing resdiential garage/basement space to accessory dwelling unit including kitchen, full bath, (1) bedroom, and living space.

Issued
Nov 16, 20202531 33rd Av

New slab footing at area of construction. add 784sf of living space in (e) basement & under 2/f. living area to including new bedroo, bathroom, laundry & family room.

Complete
Jun 2, 20201113 Fillmore St

Interior tenant improvement to include new partitions. new finishes, lighting throughout also new break area to include millwork and plumbing.

Complete
Sep 23, 2019300 Beale St #408

Unit 408 - remodel kitchen, master bath and half bath. update electrical and plumbing accordingly, new cabinetry, plumbing and electrical fixtures

Complete
May 16, 20191440 Montgomery St #41

Unit #41 - interior remodel - kitchen cabinetry & finishes, master bath and closet remodel, new bath fixtures and finishes, new flooring throughout, ele & hvac upgrades as needed

Complete
Mar 28, 201951 Pond St #0

Relocate existing exterior door & add new landing to existing exterior stairs, add new bath to include plumbing fixtures & finishes.

Complete
Nov 2, 20182425 Market St #12

Unit 12: kitchen update remodel: ele, plm. mech

Complete
Oct 30, 20182820 Pacific Av

Interior remodel of (e) bath and converting (e) closet into (n) bath in single-family residence. to include replacement of fixtures & finishes in (e) bath & adding (n) windows in (n) bath.

Issued
Jun 19, 2018354 Greenwich St

Interior remodel of condominium in 4 unit building to include replacement of fixtures in bathroom and kitchen, new finishes and millwork throughout. replacement of e windows and swinging glass door with new

Complete

Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.

Are you Gregg Alan De Meza? Request a correction.