Henry Elkan Brazer
Architect · Henry Brazer Architecture · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-39550First issued Jan 5, 2022, expires Sep 30, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 28 permits since 2022, 28 in the last 5 years. Latest filed Oct 14, 2026.
- What kind of projects?
- Home remodel 21 · Legalize or fix a violation 4 · Other 2
- How long do their permits take?
- Home remodel: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 21 permits in San Francisco
Time to get a permit
Median from filing to permit, from 17 issued permits filed since 1966; 3 still in review. City is the San Francisco median for the same kind of review, from 34,087 permits.
Where
- Castro/Upper Market5
- West of Twin Peaks3
- Haight Ashbury3
- Mission3
Most recent
- 2332 15th StUnit #2332 kitchen remodelOct 14, 2026Issued
- 192 Casitas AvExterior remodel (n) decorative roof, replace all exterior siding with (n) stucco & hardi plank, new deck at level 1, replace all exterior doors & windows. interior remodel: relocate living room, dining room, kitchen to level 3,add 2 bedrooms, 2 full bathrooms, 2 1/2 bathrooms, no change to (e) bldgSep 24, 2026Filed
- 355 Highland AvInterior remodel: remove shower in level 2 bathroom and replace with new washer and dryer, remodel primary bedroom and bathroom, add new bathroom on level 3.Sep 3, 2026Filed
- 192 Casitas AvInterior remodel relocate living room, dining room, kitchen to level 3 add two bedrooms, add two full bathrooms, and two half bathrooms, no change to (e) building envelopeAug 31, 2026Filed
- 2182 40th AvKitchen and laundry room remodel.Aug 26, 2026Issued
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Oct 14, 2026 | 2332 15th St Unit #2332 kitchen remodel Issued | Home remodel | Issued | Within 1 month | |
| Sep 24, 2026 | 192 Casitas Av Exterior remodel (n) decorative roof, replace all exterior siding with (n) stucco & hardi plank, new deck at level 1, replace all exterior doors & windows. interior remodel: relocate living room, dining room, kitchen to level 3,add 2 bedrooms, 2 full bathrooms, 2 1/2 bathrooms, no change to (e) bldg Filed | Home remodel | Filed | — | |
| Sep 11, 2026 | 1380 Noe St H & v addition to (e) upper unit (1380 noe street). addition to add 1,173 sq.ft onto rear of (e) structure. addition 3 bedrooms, 2 bathrooms, laundry & roof deck. legalization of (e) 2nd floor unit (1382 noe street) as a density conforming dwelling unit within rh-2 zoning district. ab-112 Filed | Addition | Filed | — | |
| Sep 3, 2026 | 355 Highland Av Interior remodel: remove shower in level 2 bathroom and replace with new washer and dryer, remodel primary bedroom and bathroom, add new bathroom on level 3. Filed | Home remodel | Filed | — | |
| Aug 31, 2026 | 192 Casitas Av Interior remodel relocate living room, dining room, kitchen to level 3 add two bedrooms, add two full bathrooms, and two half bathrooms, no change to (e) building envelope Filed | Home remodel | Filed | — | |
| Aug 26, 2026 | 2182 40th Av Kitchen and laundry room remodel. Issued | Home remodel | Issued | Within 1 month | |
| Aug 26, 2026 | 3955 20th St Demise private storage space in (e) basment Issued | Home remodelType unconfirmed | Issued | Within 1 month | |
| Jul 9, 2026 | 100 Excelsior Av To comly with nov# 202655988: legalize unpermitted garage to storage conversion. legalize unpermitted bathroom in same area. Filed | Legalize or fix a violation | Filed | — | |
| Jun 10, 2026 | 4 Embarcadero Center Revision to bpa: 202308305620 - new casework, new kitchen and bar equipment, patch flooring. Issued | Revision or supplement | Issued | 3 months | |
| Feb 6, 2026 | 2330 15th St Window replacement. replacement all (e) windows in unit #2330 with aluminum clad wood windows. visible from street all new windows to have u-factor less than or equal to .27. in-kind unless otherwise noted. in kind like for like within same opening. total 16 windows. Issued | Other | Issued | Within 1 month | |
| Nov 21, 2025 | 3101 Clay St #5 Interior renovation to 4th fl, unit 5; kitchen remodel (2) bath remodel, minor reconfiguration of load bearing wall will require roof & floor reinforcement within unit no exterior alterations Issued | Home remodelType unconfirmed | Issued | Within 1 month | |
| Oct 24, 2025 | 2236 18th Av Interior remodel to main level kitchen, bathroom, (n) hallway entry to main level bedrooms, bedroom closet remodel Complete | Home remodel | Complete | Within 1 month | |
| Aug 19, 2025 | 2330 15th St Interior remodel of unit 2330 including full kitchen and bathroom remodels Issued | Home remodel | Issued | 5 months | |
| Aug 18, 2025 | 152 Fairmount St Kitchen remodel reivsed layout no change to plumbing fixture count Complete | Home remodel | Complete | 6 months | |
| Aug 15, 2025 | 74 Belcher St Interior remodel of unit 74 only: existing kitchen and bathroom remodel, add one bathroom, add closets to two bedroom. no change to other units nor the bldg. envelope work at top floor, front building only. Complete | Home remodel | Complete | Within 1 month | |
| Aug 15, 2025 | 74 Belcher St Window replacment: replace alll (e) windows in unit w/aluminum-clad windows for street-facing and vinyl windows for non-street facing. all new windows to have u-factor less than or equal to 0.30. work on top floor, front building only. modify water closet toilet location and add sink Complete | Other | Complete | 2 months | |
| Jun 13, 2025 | 2328 15th St #0 Interior remodel of unit 2328 including kitchen and bathroom remodel, no change to plumbing fixture count. replace 2 non street facing windows with new vinyl windows. Complete | Home remodel | Complete | Within 1 month | |
| May 28, 2025 | 275 Downey St Revision to pa#202403067193. this scope only includes correction to title 24 calculations, raising the living room ceiling, reconstuction of interior and exterior stairs. Complete | Revision or supplement | Complete | Within 1 month | |
| Mar 21, 2025 | 124 Teddy Av Comply with nov 202431587. upper level unpermitted bathroom to be demolished, restored to last permitted condition. kichen countertop demolition only. no other work to be 124 teddy Complete | Legalize or fix a violation | Complete | Within 1 month | |
| Jun 13, 2024 | 205 Elsie St Interior remodel: remodel kitchen and two bathrooms, add one bathroom upstiars. add closets in upstairs bedrooms. replace two non street facing windows and infill one non-street facing window. Complete | Home remodel | Complete | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Henry Elkan Brazer? Request a correction.