Henry Hoishing Kwong
Architect · K2a, Architecture & Int · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-15355First issued Mar 1, 1985, expires Sep 30, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 76 permits since 2002, 76 in the last 5 years. Latest filed Oct 21, 2025.
- What kind of projects?
- Commercial or tenant improvement 40 · Other 11 · Home remodel 9
- How long do their permits take?
- Commercial or tenant improvement: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 40 permits in San Francisco
Time to get a permit
Median from filing to permit, from 38 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 5,514 permits.
Where
- Financial District/South Beach23
- Tenderloin6
- Potrero Hill2
- Bayview Hunters Point2
Most recent
- 2252 Fillmore StTi: 1st/flr- remodel of former retail space to boba drink shop located on the 1st flr of a 4-story commercial bldg. scope includes 1-ada compliant restroom, new partitions, new doors, food service equip., casework, hvac, lighting & plumbing.Nov 30, 2022Complete
- 728 Pacific Av #118Suite 118: subdivision of (e) non-formula restaurant space, t.i. for 460 sq. ft. retail (suite 118a) & 2,300 sq. ft. future restaurant (suite 118). new non-load bearing partitions, casework, accessible toilet rooms, interior mall windows, doors, & mepApr 22, 2022Complete
- 555 De Haro St2nd fl - change of use (pdr to lab) ti remodel of (e) 12,378 sf of interior space for lab, demonstration space, offices, conference rooms, shower and (e) toiletJul 1, 2020Complete
- 1455 Custer AvNon structural demo of an (e) warehouse per ab-017Jul 15, 2019Complete
- 1455 Custer AvConversion of an (e) warehouse with admin office to a food processing facility. construction of a mech platform to support new mech, elec, plmb & fire protection systems. ** maher: n/a **May 6, 2019Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Oct 21, 2025 | 3114 Franklin St Demolition of interior partitions at kitchen, bedroom, lvg rm. new interior layout for kitchen, bath, including garage space for enlarge liviing rm. replace 3 windows facing the backyard. upgrade electrical, heating, plumbing. structural upgrade. no new horizontal additon. Issued | Home remodelType unconfirmed | Issued | 11 months | |
| Aug 28, 2025 | 601 23rd St Erect a one story, type 5b, warehouse building. Filed | New building | Filed | — | |
| Jun 6, 2024 | 728 Pacific Av #110 Rev 202211045899- partial removal of (e) tiles and recladding with aluminum composite panels. no interior work. Complete | Revision or supplement | Complete | Within 1 month | |
| Mar 22, 2023 | 728 Pacific Av #118 Suite 118: revision to permit 202210073992. back-of-house ceilings to change from suspended assembly to painted gyp board. modification includes relocation of proposed fire smoke dampers. Issued | Revision or supplement | Issued | Within 1 month | |
| Jan 20, 2023 | 926 Fillmore St Revision to permit 202108045814. new replacement window and sliding door (same size and location) shear wall and hold down work removed. Complete | Revision or supplement | Complete | 1 month | |
| Nov 30, 2022 | 2252 Fillmore St Ti: 1st/flr- remodel of former retail space to boba drink shop located on the 1st flr of a 4-story commercial bldg. scope includes 1-ada compliant restroom, new partitions, new doors, food service equip., casework, hvac, lighting & plumbing. Complete | Commercial or tenant improvementType unconfirmed | Complete | 3 months | |
| Nov 4, 2022 | 728 Pacific Av #110 Exterior cladding & water preoofing replacement. Complete | Other | Complete | 17 months | |
| Oct 7, 2022 | 728 Pacific Av #118 Additive work to pa# 202204222843. reconfiguration of suites & buildout of restaurant. Complete | Revision or supplement | Complete | 3 months | |
| Apr 22, 2022 | 728 Pacific Av #118 Suite 118: subdivision of (e) non-formula restaurant space, t.i. for 460 sq. ft. retail (suite 118a) & 2,300 sq. ft. future restaurant (suite 118). new non-load bearing partitions, casework, accessible toilet rooms, interior mall windows, doors, & mep Complete | Commercial or tenant improvement | Complete | 5 months | |
| Jan 28, 2022 | 728 Pacific Av #115 Suite 115: revision to permit 202108045808. update layout. Complete | Revision or supplement | Complete | Within 1 month | |
| Feb 3, 2021 | 49 Bessie St Remodel of (e) single family dwelling including one bedroom, living room, kitchen, and toilet on level 1. conversion of an unoccupied lower level to two bedrooms, common room, and storage. replace dry rotted roof deck in back with new wood structure on (e) footprint - no change in dimensions Issued | Home remodel | Issued | 14 months | |
| Jan 7, 2021 | 1455 Custer Av Revision to approved pa #2019-0506-9828 & #2020-0709-9876: memorialize as-built construction of new sidewalk as approved by dpw & dac. exterior accessibility ramp no longer required due to raised finish floor. Complete | Revision or supplement | Complete | 1 month | |
| Oct 17, 2020 | 172 06th St Remove existing wood bench. build new reception area & mailbox. replace existing entrance doors w/ new doors and hardware. existing gate to remain. Issued | OtherType unconfirmed | Issued | 25 months | |
| Jul 1, 2020 | 555 De Haro St 2nd fl - change of use (pdr to lab) ti remodel of (e) 12,378 sf of interior space for lab, demonstration space, offices, conference rooms, shower and (e) toilet Complete | Commercial or tenant improvement | Complete | 3 months | |
| Feb 13, 2020 | 662 A 09th Av Rear addition for conversion of unoccupied level 1 for garage with bike rack 485 sf and 1 bedroom dwelling unit with kitchen and bath. 877sf new front opening for garage door. existing curb cut and driveway remain. Complete | AdditionType unconfirmed | Complete | 22 months | |
| Jul 15, 2019 | 1455 Custer Av Non structural demo of an (e) warehouse per ab-017 Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| May 6, 2019 | 1455 Custer Av Conversion of an (e) warehouse with admin office to a food processing facility. construction of a mech platform to support new mech, elec, plmb & fire protection systems. ** maher: n/a ** Complete | Commercial or tenant improvement | Complete | 7 months | |
| Jun 7, 2018 | 122 11th Av #0 Remodel of (e) ground floor to add one accessory dwelling unit per ordinance 162-16 with (1) bedroom, living room, kitchen & bath from (e) storage rms. also add mechanical room for furnaces, water heaters & add bike racks in (e) garage. Complete | ADU | Complete | 9 months | |
| Apr 24, 2018 | 1815 Egbert Av Replace (e) keypad lock with new key pad & keypad entry at main parking lot entry. remove (e) chain link gate and add new chain link gate (like for like), gate opener & 3' pedestrian door at side parking lot exit. add sffd approved lock boxes at both entries. ele work under sep permit maher na Complete | OtherType unconfirmed | Complete | 11 months | |
| Mar 27, 2018 | 650 Polk St Change of use for new health clinic. demo (e) interior structures & bld systems. refurbish (e) facade. construction of new interior clinic with respective structures and bld systems. grnd & mezz levels Complete | Commercial or tenant improvement | Complete | 5 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Henry Hoishing Kwong? Request a correction.