James Allen Terry
Architect · Ware Malcomb · Rocklin
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-34838First issued Nov 18, 2014, expires Oct 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 36 permits since 2016, 36 in the last 5 years. Latest filed Sep 12, 2025.
- What kind of projects?
- Commercial or tenant improvement 35 · Other 1
- How long do their permits take?
- Commercial or tenant improvement: 2 months. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 35 permits in San Francisco
Time to get a permit
Median from filing to permit, from 32 issued permits filed since 1966; 1 still in review. City is the San Francisco median for the same kind of review, from 20,097 permits.
Where
- Financial District/South Beach27
- Bayview Hunters Point5
- Inner Sunset1
- Outer Richmond1
Most recent
- 350 Bush St17th fl - general suite upgrades consists of (n) doors, walls, finishes; minor demo for a new wall, a piece of millwork, and relocation of light fixtures. additionally, the project will require minor mechanical and electrical work for the av/it tenant needsSep 12, 2025Complete
- 33 New Montgomery St2nd floor: construction of new demizing wall separeting one suite into 2 (220 and 290). additional egress door provided for egress to 220.Dec 4, 2024Complete
- 200 Napoleon StRemove cold storage insulated walls, floor insulation and refrigeration equipoemnt. revert to original warehouse. existing sprinklers, lights and fire alarm to remain in warehouse demo only ti under separate permitSep 25, 2024Issued
- 701 Irving StExisting back of house area for access to roof of building for maintenance. for a fixed ladder w fall arrest system, new opening to roofSep 6, 2024Issued
- 301 Toland StTi: vehicle maintenance garage including new employee restrooms and it room,new walls, millwork, ceilings, finishes, polumbing, electrical and hvac.Nov 28, 2023Filed
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Sep 12, 2025 | 350 Bush St 17th fl - general suite upgrades consists of (n) doors, walls, finishes; minor demo for a new wall, a piece of millwork, and relocation of light fixtures. additionally, the project will require minor mechanical and electrical work for the av/it tenant needs Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Mar 27, 2025 | 301 Toland St Revision to 202501158383. removing footings & finishes within the scope, adding wall changes & water fountain. deducts & removing of e) approved scope cancel out the chanegs & valuation Complete | Revision or supplement | Complete | 4 months | |
| Dec 4, 2024 | 33 New Montgomery St 2nd floor: construction of new demizing wall separeting one suite into 2 (220 and 290). additional egress door provided for egress to 220. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Sep 25, 2024 | 200 Napoleon St Remove cold storage insulated walls, floor insulation and refrigeration equipoemnt. revert to original warehouse. existing sprinklers, lights and fire alarm to remain in warehouse demo only ti under separate permit Issued | Commercial or tenant improvement | Issued | 5 months | |
| Sep 6, 2024 | 701 Irving St Existing back of house area for access to roof of building for maintenance. for a fixed ladder w fall arrest system, new opening to roof Issued | Commercial or tenant improvementType unconfirmed | Issued | 16 months | |
| Nov 28, 2023 | 301 Toland St Ti: vehicle maintenance garage including new employee restrooms and it room,new walls, millwork, ceilings, finishes, polumbing, electrical and hvac. Filed | Commercial or tenant improvement | Filed | — | |
| Oct 27, 2023 | 850 La Playa Minor remodel: replace new deli cases including plumbing and electrical. remove (e) refrig/warming cases and installation of new refrig/warming cases in (e) retail/deli area (safeway) no final inspection until final inspection of pa#: 2021-1207-3829 Issued | Commercial or tenant improvementType unconfirmed | Issued | 12 months | |
| Oct 27, 2023 | 3350 Mission St Minor remodel: replace new deli cases including plumbing and electrical. removal of (e) refrig/warming cases and installation of new refrig/warming cases in retail/deli area (safeway) Complete | Commercial or tenant improvement | Complete | 12 months | |
| Aug 3, 2023 | 33 New Montgomery St Suite 2010: new partitions, doors/frames, new lighting & relocated millwork Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Jul 10, 2023 | 1501 Tennessee St Revision to pa# 202211166660. to add a small lobby at main entry. update details for wheelchair concrete pad & include data off load & cable tray structural designs. Complete | Revision or supplement | Complete | 1 month | |
| May 2, 2023 | 650 Davis St Suite 2010: revision to permit 202212279158. revision shows existing roof drainage barrier causing infeasibility for ada toilet relocation, existing ada toilet location to remain. Complete | Revision or supplement | Complete | 1 month | |
| Apr 4, 2023 | 33 New Montgomery St 19/f- ste# 1900: selective demo of non-load bearing partitions, doors, millwork, ceilings. new partitions, doors & hardware, power, ceiling, lighting & fixtures. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Mar 22, 2023 | 33 New Montgomery St 18/f: t.i. include new interior partitions, glazing, doors/frames, new lighting and millwork. existing ada compliant restrooms to remain. no structural. mep deferred. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Mar 17, 2023 | 33 New Montgomery St 20/f: t.i to include new interior partitions, glazaing doors/frames, new lighting and millwork existing ada compliant restrooms to remain. mep and fire life safety under sep permit. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Mar 9, 2023 | 33 New Montgomery St 14th fl- ti to include new interior partitions, glazing door/frames, new lighting and millwork. mep, sprinkler and fire alarm to be deferred permits. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Dec 27, 2022 | 650 Davis St Interior ti demo non load bearing partitions, ceilings, lighting and finishes. new partitions, millwork, ceilings, lighting and finishes. new restrooms, shower room, mothers room. Complete | Commercial or tenant improvement | Complete | 2 months | |
| Nov 16, 2022 | 1501 Tennessee St Ti & barrier removal create accessible entrance & egress.(n) accessible lift to be provided to (e) main entry door to clear path of travel to tenant space. circulation path to connect all rooms. (n) data & power outlets to (e) office area. change of use from pdr warehouse to pdr light manufacturing. Complete | Commercial or tenant improvement | Complete | 6 months | |
| Oct 28, 2022 | 2270 Jerrold Av Demolition of type v, 1-story office. Complete | Other | Complete | 8 months | |
| Oct 26, 2022 | 650 Davis St Suite 2010 on 1/f: demolition of non-load bearing partitions, ceilings, lighting, and finishes per ab-017. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Oct 18, 2022 | 1501 Tennessee St To comply with access business entrance abe202003102554. 1st fl: barrier removal to create accessible entrance and means of egrees. new accessible lift to existing main entry door. Cancelled | Commercial or tenant improvement | Cancelled | — |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.