CheckMyDesigner

Jason Derek Page

Engineer · Spi Consulting Engineers Inc. · Martinez

Public records

From the licensing board and the city of San Francisco.

The short answer

Licensed?
License activeCivil Engineer C-62132First issued Jun 28, 2001, expires Sep 30, 2027.

Source: DCA license roster, retrieved Nov 5, 2026

Verify on DCA License Search

Any board discipline?
None found.

We searched the BPELSG enforcement list on Nov 5, 2026.

Worked in San Francisco?
12 permits since 2022, 12 in the last 5 years. Latest filed Jul 10, 2026.
What kind of projects?
Retaining wall or site work 9 · Addition 1 · Legalize or fix a violation 1
How long do their permits take?
Retaining wall or site work: 6 months. City typical for the same review: 5 months.

Permits filed each year

San Francisco permits by the year they were filed. The last 5 years are in blue.

What are you planning?

Pick your kind of project to see their permits for it.

Retaining wall or site work: 9 permits in San Francisco

From 2025 to 2026, latest filed Jul 10, 2026.

Time to get a permit

Theirs
6 months
City
5 months

Median from filing to permit, from 9 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 4,324 permits.

Where

  • Potrero Hill6
  • Marina1
  • West of Twin Peaks1
  • South of Market1
Permits
13 permits that name Jason Derek Page, newest first, including 1 revisions or supplements that are not counted. Select a permit to see the full record.
FiledProjectOpen
Jul 10, 20262735 Baker St

Excavage and installl new rear yard retaining wall in front of failing brick retaining wall

Issued
Jul 2, 202633 Banbury Dr

Temporary shoring to facilitate the foundation excavation and installation for the project permitted under pa#: 202303093340. this shoring will remain in place but is not neccesary for, nor will it become part of permanent structure.

Issued
May 21, 2025160 Freelon St

Temporary excavation shoring system for proposed h-story residential bldg at 160 freelon st. the excavation with typical retained heights up to 5-feet are shored using cantilevered soldier piles and timber lagging. ref pa# 202209283327.

Complete
May 7, 20251015 Francisco St

Unit #3: rev to pa# 2025-0214-0372 to combine 6 windows into 3 includes engineering calculations for the windows wall removal in pantry 2 pocket door to downstairs and new post at fireplace

Withdrawn
Mar 4, 20251201 Illinois St

Lot a: priority for potrero power station development: work in this permit includes tiebacks only. to support main shoring system to serve block 2 ucsf (state) development at apn 4175/027.bpa is approved for documentation purposes only.tech review by dsa and ccsf shall be held harmless.

Issued
Feb 10, 20251201 Illinois St

Lot s: priority for potrero power station development: work in this permit includes tiebacks only. to support main shoring system to serve block 2 ucsf (state) development at apn 4175/027. bpa is approved for documentation purposes only.tech review by dsa and ccsf shall be held harmless.

Issued
Feb 10, 20251201 Illinois St

Lot aa: priority for potrero power station development: work in this permit includes tiebacks only .. to support main shoring system to serve block 2 ucsf (state) development at apn 4175/027. bpa is approved for documentation purposes only.tech review by dsa and ccsf shall be held harmless.

Issued
Feb 10, 20251201 Illinois St

Lot ab: priority for potrero power station development: work in this permit includes tiebacks only .. to support main shoring system to serve block 2 ucsf (state) development at apn 4175/027.bpa is approved for documentation purposes only.tech review by dsa and ccsf shall be held harmless.

Issued
Feb 10, 20251201 Illinois St

Lot c: priority for potrero power station development: work in this permit includes tiebacks only. to support main shoring system to serve block 2 ucsf (state) development at apn 4175/027.bpa is approved for documentation purposes only.tech review by dsa and ccsf shall be held harmless.

Issued
Feb 10, 20251201 Illinois St

Lot g: priority for potrero power station development: work in this permit includes tiebacks only .. to support main shoring system to serve block 2 ucsf (state) development at apn 4175/027.bpa is approved for documentation purposes only.tech review by dsa and ccsf shall be held harmless.

Issued
Sep 20, 20243018 Rivera St

To comply with nov# 202425617, construct a deck in the rear of property.

Complete
Mar 10, 20232644 Larkin St

Temporary excavation shoring system to alllow construction, ref pa# 202207279411. scope involves constructing an extention of (e) basement & 2nd lvl 1' to 2' below (e) flr lvls. where portions of new foundations are below (e) foundations, new construction will be performed sequentially in hand-dug

Issued
Feb 25, 20221915 Sacramento St

Excavate (e) crawlspace to replace (e) damaged foundations. add new staircase & elevator access from garage to main house. infill (e) lightwell. replace 1st fl rear bay wall. change interior layout. replace (e) windows w/ fullwood. add insulation at walls. re-frame damaged garage roof.

Expired

Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.

Are you Jason Derek Page? Request a correction.