Jason Mong-June Chan
Architect · Jason M.J.Chan Architect · Millbrae
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-25279First issued Oct 11, 1994, expires Jan 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 387 permits since 2001, 387 in the last 5 years. Latest filed Oct 14, 2026.
- What kind of projects?
- Home remodel 213 · Addition 33 · Legalize or fix a violation 33
- How long do their permits take?
- Home remodel: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 213 permits in San Francisco
Time to get a permit
Median from filing to permit, from 190 issued permits filed since 1966; 7 still in review. City is the San Francisco median for the same kind of review, from 24,024 permits.
Where
- Sunset/Parkside43
- Outer Richmond26
- West of Twin Peaks20
- Oceanview/Merced/Ingleside15
Most recent
- 1443 30th AvInterior remodel. 1st fl remodel of e family room and bathroom and bedroom, replace garage goor, same size. 2nd fl remodel e kitchen, bathroom, add a full bath, powder room. enclose south lightwell. upgrade e elec panel to 250 amp.Oct 14, 2026Filed
- 1370 20th Av1.) add a spiral stair to connect 1st floor and 2nd floor living space. 2.) convert (e) laundry/ storage room to a media room with a (n) wet bar.Sep 24, 2026Filed
- 2058 34th AvInterior remodel: 1st floor, add a bedroom, a family room with wetbar, a full bathroom, a laundry room, remodel foyer. 2nd floor: remodel bathroom, kitchen, add a full bathroom, convert bedroom to a media room. subject to ab112.Sep 3, 2026Filed
- 718 37th AvInterior remodel: 1st floor: remodel (e) bedrooms, family room, and bathroom, add a powder room, replace (e) garage door with (n) garage door. 2nd floor: remodel (e) bathroom, kitchen, living and dining room, add a full bathroom, replace living room window. subject to ab112Aug 14, 2026Triage
- 5828 California StInterior remodel: convert (e) storage room to an excercise room, a media room and a bathroom for unit# 1 above.Jul 17, 2026Issued
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Oct 14, 2026 | 1443 30th Av Interior remodel. 1st fl remodel of e family room and bathroom and bedroom, replace garage goor, same size. 2nd fl remodel e kitchen, bathroom, add a full bath, powder room. enclose south lightwell. upgrade e elec panel to 250 amp. Filed | Home remodel | Filed | — | |
| Sep 28, 2026 | 1701 Polk St Change of occupancy from m to b. remodel existing tenant space to be a drink shop. modify existing electrical, mechanical and plumbing systems per bldg, and health department requirements. Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Sep 24, 2026 | 1370 20th Av 1.) add a spiral stair to connect 1st floor and 2nd floor living space. 2.) convert (e) laundry/ storage room to a media room with a (n) wet bar. Filed | Home remodel | Filed | — | |
| Sep 17, 2026 | 944 Greenwich St Erect type vb 2-story 2 adu structure in rear yard. Triage | New building | Triage | — | |
| Sep 14, 2026 | 5828 California St Minor revision to 202502200739, change to entry doors for 2nd fl unit 1 and 3rd floor unit 2. minor revision to skylights for 3rd fl unit 2. Issued | Revision or supplement | Issued | Within 1 month | |
| Sep 3, 2026 | 2058 34th Av Interior remodel: 1st floor, add a bedroom, a family room with wetbar, a full bathroom, a laundry room, remodel foyer. 2nd floor: remodel bathroom, kitchen, add a full bathroom, convert bedroom to a media room. subject to ab112. Filed | Home remodel | Filed | — | |
| Aug 26, 2026 | 810 Vallejo St #0 G/f: convert (e) storage space into two (2) adu units per calstate program. Triage | ADU | Triage | — | |
| Aug 23, 2026 | 83 Lisbon St Front building. to comply with n.o.v. #202289263. in 1st floor of unit# 1 (front building) add a new adu per state program. Filed | Legalize or fix a violation | Filed | — | |
| Aug 14, 2026 | 718 37th Av Interior remodel: 1st floor: remodel (e) bedrooms, family room, and bathroom, add a powder room, replace (e) garage door with (n) garage door. 2nd floor: remodel (e) bathroom, kitchen, living and dining room, add a full bathroom, replace living room window. subject to ab112 Triage | Home remodel | Triage | — | |
| Jul 17, 2026 | 5828 California St Interior remodel: convert (e) storage room to an excercise room, a media room and a bathroom for unit# 1 above. Issued | Home remodel | Issued | Within 1 month | |
| Jul 10, 2026 | 352 06th Av In unit#: 2 (352 6th av) on 3rd flr: add an attic access stair to existing atic space. add skylight. Filed | Other | Filed | — | |
| Jul 7, 2026 | 735 40th Av Rear horizontal addition to (e) 3-story duplex building. adding 2 bedrooms and a full bathroom to eachunit. remodel (e) kitchens. Filed | Addition | Filed | — | |
| Jun 18, 2026 | 2542 Bryant St Unit 1-interior remodel for 2nd floor to include remodel bathrooms, bedrooms, and kitchen. Issued | Home remodel | Issued | 4 months | |
| Jun 16, 2026 | 2880 Bush St Legalize existing rear yard rental cottage to adu per ord# 43-14. Filed | ADU | Filed | — | |
| Apr 17, 2026 | 2542 Bryant St Unit 2- 3/fl- remodel and relocated bedroom, bathroom and kitchen . add (3) bathrooms and convert living room into bedroom. replace (e) windows in kind facing street. Reinstated | Home remodel | Reinstated | Within 1 month | |
| Apr 9, 2026 | 2542 Bryant St Unit #1: interior remodel in 1st floor - add a media room, a bedroom, a full bathroom, a laundry closet for unit #1. 2nd floor - add a rear deck Reinstated | Home remodel | Reinstated | Within 1 month | |
| Feb 12, 2026 | 2151 46th Av Rear addition and interior rmeodel: 1/f remodel (e) bedroom, family room, and bathroom. 2/f: remodel (e) bedroom add a bathroom. Complete | Addition | Complete | 1 month | |
| Jan 28, 2026 | 3632 Sacramento St Interior remodel on 3rd floor: convert unit #1 office space back to a dwelling unit. Filed | Commercial or tenant improvement | Filed | — | |
| Jan 20, 2026 | 100 Florentine Av Relocate existing front door. add a laundry closet. Withdrawn | Home remodel | Withdrawn | — | |
| Jan 20, 2026 | 535 28th Av Repair termite damaged bldg front fascia. replace (e) stucco with wood siding. replace (e) roof tile with composition shingle roof. Cancelled | Other | Cancelled | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Jason Mong-June Chan? Request a correction.