Javier M Chavarria
Engineer · Jc Engineering · Pacifica
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeCivil Engineer C-48178First issued Dec 20, 1991, expires Jun 30, 2028.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 13 permits since 2018, 13 in the last 5 years. Latest filed Oct 15, 2026.
- What kind of projects?
- Deck, stairs or patio cover 3 · Home remodel 2 · Commercial or tenant improvement 2
- How long do their permits take?
- Deck, stairs or patio cover: 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Deck, stairs or patio cover: 3 permits in San Francisco
Time to get a permit
Median from filing to permit, from 2 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 8,386 permits.
Where
- Bayview Hunters Point2
- Oceanview/Merced/Ingleside1
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Oct 15, 2026 | 331 Shields St Partial demolition of the existing front facade to correct property line encroachment and align with mandatory city setbacks. interior renovation and remodel upgrades to existing single-family residence. Filed | Home remodelType unconfirmed | Filed | — | |
| Jun 9, 2026 | 462 Arch St Add a small deck at rear of building and (n) door opening. Complete | Deck, stairs or patio cover | Complete | Within 1 month | |
| May 27, 2026 | 3630 Market St Replace garage door. add cosmetic wood to (e) columns and soffit. reference complaint no 202655973. ref 202602206289 Complete | Legalize or fix a violation | Complete | Within 1 month | |
| Mar 31, 2026 | 537 10th Av Convert existing detached garage to adu at rear. Filed | ADU | Filed | — | |
| Mar 31, 2026 | 537 10th Av Add ev charger to main house. Filed | Other | Filed | — | |
| Dec 18, 2025 | 1727 Newcomb Av Provide 2nd mean of egress for lower floor living area. Withdrawn | Deck, stairs or patio coverType unconfirmed | Withdrawn | — | |
| Dec 8, 2025 | 110 Ashton Av Revision pa# 202410233579 and ref orignal pa# 202206095995. replace garage slab w/ 4" of concrete w/ #4 at 18" o.c. w/ 6" base rock. Complete | Revision or supplement | Complete | Within 1 month | |
| Oct 15, 2024 | 580 Sutter St Modify (e) bathroom to create fully complaint unisex toilet room Filed | Commercial or tenant improvement | Filed | — | |
| Dec 20, 2023 | 2217 Revere Av Remove (e) decayed exterior stair & replace. Issued | Deck, stairs or patio cover | Issued | 1 month | |
| Oct 25, 2023 | 1215 Holloway Av Partial removal of exterior stucco, investigation of dry rot damage, replace damage members in kind. install new stucco in kind. install temporary shoring system (interior) as needed. Issued | OtherType unconfirmed | Issued | 3 months | |
| Jan 18, 2023 | 431 Hoffman Av Revision to permit 202209303561 to show (e) and proposed plan, new ceiling framing and revise roofing plan. Complete | Revision or supplement | Complete | Within 1 month | |
| Sep 30, 2022 | 431 Hoffman Av Revision to permit 202202168156. modify interior layout, add rear stair. Complete | Revision or supplement | Complete | 2 months | |
| Nov 9, 2021 | 307 Castro St #2 Unit 2: relocation and renovation of kitchen. remodel (e) bathroom. add a new bathroom. remove wall between dining and bedroom to create larger living room. Complete | Home remodel | Complete | 1 month | |
| Nov 2, 2020 | 1350 Shotwell St Project composes of addition remodel lower floor unit and includes 2 bed and 2 bath. 885 sq ft. lower floor level to create min 8' clear finish ceiling approx 44 cu yd excavation extg 2 units located on the main level upper level are to remain as is Complete | Addition | Complete | 6 months | |
| Sep 22, 2020 | 3324 Divisadero St Lower floor seismic reinforcement, eliminate post and install new beam to allow for more parking. remodel rec room, bathroom and wet bar at ground floor, modify support of rear deck, remodel kitchen at third floor, install new electrical subpanel. Issued | Seismic retrofit or foundationType unconfirmed | Issued | 23 months | |
| Mar 13, 2018 | 5420 Mission St Change of use from "b" to a-3. impove bathrooms to make them accessible. install (new) furnace and vent. add egress corridor. Cancelled | Commercial or tenant improvement | Cancelled | — |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Javier M Chavarria? Request a correction.