- Licensed?
- License activeCivil Engineer C-77302First issued Jan 7, 2011, expires Jun 30, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 12 permits since 2023, 12 in the last 5 years. Latest filed May 29, 2026.
- What kind of projects?
- Other 7 · Home remodel 4 · Deck, stairs or patio cover 1
- How long do their permits take?
- Home remodel: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Other: 7 permits in San Francisco
Time to get a permit
Median from filing to permit, from 7 issued permits filed since 1966.
Where
- Western Addition5
- Twin Peaks1
- Sunset/Parkside1
Most recent
- 3620 Market St #3Unit 3- replace ledger and dry rot replacment apprx 10sf of stucco and paint. all new materials less than 50% in kind not visble from street.May 29, 2026Complete
- 1804 A Ellis St #67Partial repairs to ext bldg envelope, as-needed basis, replace (e) wood siding w? james hardie cementitious siding to resemble (e) & other voluntary repairs. rr windows within (e) framed openings, rr & repair (e) trellis, bldg materials will be replaced inkind. repaint bldg to (e) color. common areaNov 13, 2025Complete
- 1810 A Ellis St #63Partial repairs to ext bldg envelope, as-needed basis, replace (e) wood siding w? james hardie cementitious siding to resemble (e) & other voluntary repairs. rr windows within (e) framed openings, rr & repair (e) trellis, bldg materials will be replaced inkind. repaint bldg to (e) color. common areaNov 13, 2025Complete
- 1310 A Scott St #37Partial repairs to ext bldg envelope, as-needed basis, replace (e) wood siding w? james hardie cementitious siding to resemble (e) & other voluntary repairs. rr windows within (e) framed openings, rr & repair (e) trellis, bldg materials will be replaced inkind. repaint bldg to (e) color. common areaNov 13, 2025Complete
- 1860 A Ellis St #53Partial repairs to ext bldg envelope, as-needed basis, replace (e) wood siding w? james hardie cementitious siding to resemble (e) & other voluntary repairs. rr windows within (e) framed openings, rr & repair (e) trellis, bldg materials will be replaced inkind. repaint bldg to (e) color. common areaNov 13, 2025Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| May 29, 2026 | 3620 Market St #3 Unit 3- replace ledger and dry rot replacment apprx 10sf of stucco and paint. all new materials less than 50% in kind not visble from street. Complete | OtherType unconfirmed | Complete | Within 1 month | |
| May 22, 2026 | 1310 B Scott St #39 Revision to pa# 202510237986. change two drilled piers to hand dug piers. no exterior work. Complete | Revision or supplement | Complete | Within 1 month | |
| Nov 13, 2025 | 1804 A Ellis St #67 Partial repairs to ext bldg envelope, as-needed basis, replace (e) wood siding w? james hardie cementitious siding to resemble (e) & other voluntary repairs. rr windows within (e) framed openings, rr & repair (e) trellis, bldg materials will be replaced inkind. repaint bldg to (e) color. common area Complete | Other | Complete | Within 1 month | |
| Nov 13, 2025 | 1810 A Ellis St #63 Partial repairs to ext bldg envelope, as-needed basis, replace (e) wood siding w? james hardie cementitious siding to resemble (e) & other voluntary repairs. rr windows within (e) framed openings, rr & repair (e) trellis, bldg materials will be replaced inkind. repaint bldg to (e) color. common area Complete | Other | Complete | Within 1 month | |
| Nov 13, 2025 | 1310 A Scott St #37 Partial repairs to ext bldg envelope, as-needed basis, replace (e) wood siding w? james hardie cementitious siding to resemble (e) & other voluntary repairs. rr windows within (e) framed openings, rr & repair (e) trellis, bldg materials will be replaced inkind. repaint bldg to (e) color. common area Complete | Other | Complete | Within 1 month | |
| Nov 13, 2025 | 1860 A Ellis St #53 Partial repairs to ext bldg envelope, as-needed basis, replace (e) wood siding w? james hardie cementitious siding to resemble (e) & other voluntary repairs. rr windows within (e) framed openings, rr & repair (e) trellis, bldg materials will be replaced inkind. repaint bldg to (e) color. common area Complete | Other | Complete | Within 1 month | |
| Nov 13, 2025 | 1830 A Ellis St #59 Partial repairs to ext bldg envelope, as-needed basis, replace (e) wood siding w? james hardie cementitious siding to resemble (e) & other voluntary repairs. rr windows within (e) framed openings, rr & repair (e) trellis, bldg materials will be replaced inkind. repaint bldg to (e) color. common area Complete | Other | Complete | Within 1 month | |
| May 19, 2025 | 1685 19th Av Existing drain line repairs: r/r approx 3' x 5' portion of (e) interior concrete slab; repair approx .5 l.f portion of (e) sewer drain line below (e) slab. replacement work is like for like. not visible from street. work is hoa includeds associated interior repairs Complete | Other | Complete | Within 1 month | |
| Jun 28, 2023 | 238 Bemis St Install shoring and sister the 2x10 beam to structurally account for the removed post, structural calculations provided w/the plans Complete | Home remodel | Complete | Within 1 month | |
| May 26, 2023 | 1804 A Ellis St #67 Work to the (e) stairway to remove and replace damaged/dry rot structure framing members per engineers plans. work is all like-for-like with no change in size or appearance and envelope. Complete | Deck, stairs or patio coverType unconfirmed | Complete | Within 1 month | |
| May 11, 2023 | 519 Ellis St Framing and drywall repair after fire damage. in kond. no change. revert to last legal condition. remodel unit# 706 & # 707. Issued | Home remodelType unconfirmed | Issued | Within 1 month | |
| Mar 16, 2023 | 650 02nd St Prepare & install plates on side of column and beam for structural repair per engineering plans for support Cancelled | Home remodel | Cancelled | — | |
| Jan 9, 2023 | 478 04th Av Strengthening upgrade reconstruction of an attached 3-story laundry room. Withdrawn | Home remodelType unconfirmed | Withdrawn | — |