Jeffrey Taner
Engineer · Spectrum Structural Engin · Oakland
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeStructural Engineer S-3863First issued Feb 4, 1994, expires Dec 31, 2026.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 15 permits since 2016, 15 in the last 5 years. Latest filed Apr 10, 2026.
- What kind of projects?
- Commercial or tenant improvement 7 · Home remodel 6 · Seismic retrofit or foundation 1
- How long do their permits take?
- Commercial or tenant improvement: 2 months. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 7 permits in San Francisco
Time to get a permit
Median from filing to permit, from 7 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 8,860 permits.
Where
- Financial District/South Beach6
- Bayview Hunters Point1
Most recent
- 1 Embarcadero Center31/f: interior tenant improvement. related mechanical, electrical and plumbing modifications. limited area of floor slab demolition is included in this scope for a non-egress stair under seperate permit.Apr 10, 2026Issued
- 1 Embarcadero Center30/f: interior non-structural partitions modification, and reconfiguration interior ceiling modifications. interior finish replacement. related mechanical, electrical, and plumbing modifications. a non-egress stair connecting lvs 30 & 31.Apr 10, 2026Issued
- 4 Embarcadero CenterDemo of level 28-level 29 convenience stairs & slab in-fill.Dec 11, 2025Complete
- 1 Embarcadero Center29th and 30 flr. communication stiar t.i. includes the remove of a non-egress interconnecting - stair and the infill of the slab opening. all new or revised life safety work will be design buildg and submitted separately. (bldg is fully sprinklered)Nov 13, 2025Complete
- 1 Embarcadero CenterTi w/removal (e) walls & replaced with new. new interior finishes. removal of (e) interconnecting stair between 34th & 35th floor. close opening w/2-hr fire rated floor construction. fire alarm/sprinkler deferred permits.Aug 6, 2021Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Jul 21, 2026 | 595 Pacific Av 2/f: revision to pa#: 202602246389. adding (2) new phone booths with new supporting power. Complete | Revision or supplement | Complete | Within 1 month | |
| Apr 10, 2026 | 1 Embarcadero Center 31/f: interior tenant improvement. related mechanical, electrical and plumbing modifications. limited area of floor slab demolition is included in this scope for a non-egress stair under seperate permit. Issued | Commercial or tenant improvement | Issued | 2 months | |
| Apr 10, 2026 | 1 Embarcadero Center 30/f: interior non-structural partitions modification, and reconfiguration interior ceiling modifications. interior finish replacement. related mechanical, electrical, and plumbing modifications. a non-egress stair connecting lvs 30 & 31. Issued | Commercial or tenant improvement | Issued | 2 months | |
| Dec 11, 2025 | 4 Embarcadero Center Demo of level 28-level 29 convenience stairs & slab in-fill. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Nov 13, 2025 | 1 Embarcadero Center 29th and 30 flr. communication stiar t.i. includes the remove of a non-egress interconnecting - stair and the infill of the slab opening. all new or revised life safety work will be design buildg and submitted separately. (bldg is fully sprinklered) Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Sep 10, 2025 | 1 Embarcadero Center 32nd floor: infill former stair opening 11' x 13' with new floor slab. Complete | Home remodelType unconfirmed | Complete | Within 1 month | |
| Dec 13, 2023 | 4 Embarcadero Center Removal of interconnecting staircase and infill slab between floors 31 and 32. no change of occupancy or use. Complete | Home remodelType unconfirmed | Complete | Within 1 month | |
| Feb 4, 2022 | 460 Sutter St Intall 2 new atm units. structural work only. Issued | Home remodel | Issued | Within 1 month | |
| Feb 4, 2022 | 303 02nd St Intall 2 new atm units. structural work only. Complete | Home remodelType unconfirmed | Complete | Within 1 month | |
| Feb 4, 2022 | 292 Battery St Intall 2 new atm units. structural work only. Issued | Home remodelType unconfirmed | Issued | Within 1 month | |
| Nov 4, 2021 | 4 Embarcadero Center Demo of inter connecting staircase and infill slab between floors 12 & 13 no change in occupancy or use Issued | Home remodelType unconfirmed | Issued | 1 month | |
| Aug 6, 2021 | 1 Embarcadero Center Ti w/removal (e) walls & replaced with new. new interior finishes. removal of (e) interconnecting stair between 34th & 35th floor. close opening w/2-hr fire rated floor construction. fire alarm/sprinkler deferred permits. Complete | Commercial or tenant improvement | Complete | 6 months | |
| Feb 27, 2020 | 75 Industrial St Install new interior steel stairs (interior). ref bpa# 2017-1221-7098. Complete | Commercial or tenant improvementType unconfirmed | Complete | Within 1 month | |
| Apr 22, 2019 | 275 Battery St #0 Ground fl ti to existing restaurant space, expansion of 275 lounge, no exterior changes, new non-rated partitions, restrooms, electrical & plumbing. (ref pa #201603293403, demolition permit pa #201805159190) Complete | Commercial or tenant improvementType unconfirmed | Complete | 2 months | |
| Dec 21, 2017 | 75 Industrial St Revision to pa #201612144986. remove (e) interior partitions. remove (e) concrete stair-on-grade & replace with (n) metal stair. add walls and doors. add (n) lighting. add (n) mechanical system, (n) electrical outlets and lighting. (n) liquid co2 storage and distribution system. Complete | Revision or supplement | Complete | 10 months | |
| Aug 3, 2017 | 45 Fremont St 2nd fl structural support for interior folding wall in ti. ref pa 2017-0421-4519 n/a for maher. Complete | Revision or supplement | Complete | 1 month | |
| Nov 3, 2016 | 233 Franconia St #0 Project proposes new retaining & garden walls as part of landscaping. ref pa #201401085795. Complete | Retaining wall or site workType unconfirmed | Complete | Within 1 month | |
| Feb 10, 2016 | 456 Lake St Soft story retrofit per sfbc chapter 34b, fema p-807 Complete | Seismic retrofit or foundation | Complete | Within 1 month | |
| Feb 2, 2016 | 2 Embarcadero Center Structural work to remove slab and construct communicating stair between floors 18 and 19. ref. to t.i. pa# 201601076570. n/a ordinance #155-13 Complete | Revision or supplementType unconfirmed | Complete | 2 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Jeffrey Taner? Request a correction.