Jennifer M Harding
Architect · Asd Sky · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-38991First issued Dec 30, 2020, expires Sep 30, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 13 permits since 2021, 13 in the last 5 years. Latest filed Sep 15, 2023.
- What kind of projects?
- Commercial or tenant improvement 12 · Other 1
- How long do their permits take?
- Commercial or tenant improvement: 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 12 permits in San Francisco
Time to get a permit
Median from filing to permit, from 11 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 10,218 permits.
Where
- Financial District/South Beach7
- Chinatown2
- South of Market1
- North Beach1
Most recent
- 901 Battery St3/f: t.i. includes demo of non-structural partitions and bldg new non-stru partitions. all new or revised mep's, sprinklers & alarm life safety work will be designed build and submitted separately (bldg is fully sprinklered) as part of scope.May 17, 2023Complete
- 55 02nd St #020/f ti provide a single- user restroom which includes demolishing of non-str partitions + building new non str partitions. . revised mep fire alarm life safety sprinklers under separate permited/deferredOct 18, 2022Issued
- 505 Montgomery St7/f: t.i.: demo of non-structural partitions and building new non-structural partitions.mep,fire l/s & f/s will be design buildn and submitted for permits separately.Aug 18, 2022Complete
- 1 Market St2nd fl - demo of some non structural partitions ceiling flooring etc in areas where existing ceiling is to be removed. existing sprinkler heads shall be turned up under separate permit 2022-0817-6554. all revised mep life safety work will be design build & submitted separatelyJun 28, 2022Complete
- 600 California St #018/f. t.i includes building new non-structural partitions. all new or revised mep, sprinkler and fire alarm work will be design build and submitted separately. bldg is fully sprinklered.Jan 27, 2022Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Sep 15, 2023 | 1431 San Bruno Av New motor for (e) sliding gate at (e) parking lot vehicle entrance. add pedestrian egress gate. Withdrawn | OtherType unconfirmed | Withdrawn | — | |
| May 17, 2023 | 901 Battery St 3/f: t.i. includes demo of non-structural partitions and bldg new non-stru partitions. all new or revised mep's, sprinklers & alarm life safety work will be designed build and submitted separately (bldg is fully sprinklered) as part of scope. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Dec 15, 2022 | 505 Montgomery St 7th fl - revision to pa 2022-0818-0781 changing a storage room to a ada compliant restroom Complete | Revision or supplement | Complete | Within 1 month | |
| Oct 18, 2022 | 55 02nd St #0 20/f ti provide a single- user restroom which includes demolishing of non-str partitions + building new non str partitions. . revised mep fire alarm life safety sprinklers under separate permited/deferred Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Sep 13, 2022 | 1 Post St 31st floor:t.i. includes demo of non structural partitions and buiding new non stuctural partitions. some new or revised meps, and fire alarm and sprinklers work will be design build and submitted seperately (bldg is fully sprinklered). (ref pa#201908088304) Complete | Revision or supplement | Complete | 2 months | |
| Aug 18, 2022 | 505 Montgomery St 7/f: t.i.: demo of non-structural partitions and building new non-structural partitions.mep,fire l/s & f/s will be design buildn and submitted for permits separately. Complete | Commercial or tenant improvement | Complete | 1 month | |
| Jun 28, 2022 | 1 Market St 2nd fl - demo of some non structural partitions ceiling flooring etc in areas where existing ceiling is to be removed. existing sprinkler heads shall be turned up under separate permit 2022-0817-6554. all revised mep life safety work will be design build & submitted separately Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Jan 27, 2022 | 600 California St #0 18/f. t.i includes building new non-structural partitions. all new or revised mep, sprinkler and fire alarm work will be design build and submitted separately. bldg is fully sprinklered. Complete | Commercial or tenant improvement | Complete | 1 month | |
| Aug 26, 2021 | 44 Montgomery St 13/f: rev to pa202012281775-elimination of proposed wall and millwork in the open office from the scope. revise full height wall to partial height wall. Complete | Revision or supplement | Complete | Within 1 month | |
| Jul 23, 2021 | 600 Townsend St 5/f: t.i. -demo of non-structural partitions and building (n) non-structural partiions. mech-elect included.l/s &f/s work will be design build if needed and submitted sep. (e) bldg is fully sprinkled. Complete | Commercial or tenant improvement | Complete | 1 month | |
| Jul 21, 2021 | 1725 Montgomery St G/f: t.i.: demo of non-structural partitions and building new non-structural partitions. all new or revised mep, ls etc will be design build and sbumitted if needed. Complete | Commercial or tenant improvement | Complete | 1 month | |
| Jul 15, 2021 | 1550 Wallace Av T.i (n) cannabis cultivation facility within (e) warehouse bldg approved conditional use, meps included; exterior work: (n) louver, 2 (n) bike parking; interior: (n) partitions, (n) ramp, (n) restrooms. structural and prefab Withdrawn | Commercial or tenant improvementType unconfirmed | Withdrawn | — | |
| Jun 16, 2021 | 3 Embarcadero Center 5th fl - demo of select non structural walls. build back of ceiling height walls. new door & card readers. relocation of exit sign. install of new hi/lo drinking fountain Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Jun 2, 2021 | 760 Market St 2nd and 3rd flrs: interior t.i to include demolition of non structural partitions and millwork. new partitions and millwork. mep, life safety under separate permit. Complete | Commercial or tenant improvement | Complete | 2 months | |
| May 25, 2021 | 1 Market St 4/f interior ti includes demo and new non structural partitions. Complete | Commercial or tenant improvement | Complete | 1 month | |
| Apr 27, 2021 | 1160 Battery St 2nd fl, east bldg: interior tenant improvement includes new non-load bearing partitions, ceiling, lighting, and finishes. replacement of finishes and fixtures at restroom. Complete | Commercial or tenant improvement | Complete | 2 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Jennifer M Harding? Request a correction.