Jing Zhan Chen
Engineer · Jc Associates · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeCivil Engineer C-63527First issued Jun 14, 2002, expires Sep 30, 2028.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 114 permits since 2005, 114 in the last 5 years. Latest filed Jul 22, 2026.
- What kind of projects?
- Home remodel 46 · Seismic retrofit or foundation 27 · Addition 11
- How long do their permits take?
- Home remodel: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 46 permits in San Francisco
Time to get a permit
Median from filing to permit, from 44 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 8,386 permits.
Where
- West of Twin Peaks9
- Sunset/Parkside9
- Excelsior5
- Inner Richmond4
Most recent
- 2008 Lombard StUnit #a: conversion of existing bedroom to a 3 fixture bath to a wet bar.Jul 22, 2026Issued
- 731 Capp St1/f: demo partition wall, relocate (e) water heater, furnace, add lights; 2/f:change (e) closet to half bath at stairwell, change (e) closet to a full bath, combine (e) bedrm & bath to masterbedrm, demo (e) non-bearing wall btw kitchen & dining & remodel; 3/f: change (e) closet to full bath, combineAug 9, 2023Issued
- 4840 California StVoluntary structural strengthening, repair substandard framing and dry rot unconditioned. repair existing sun room at rear in kind. interior remodel including kitchen and bathrooms. add new skylights. windows at front ot be in-kind replacement wd to wd w/individual lites per google jan 2017 photo.Nov 30, 2017Complete
- 3674 16th St #0Unit #1 - remodel (e) living room, kitchen, bathroom, family roo & bedroom on 1st floor.Sep 8, 2017Complete
- 3674 16th St #03rd fl remodel existing unit #4, add one (n) bath and (n) bedroom.Aug 9, 2017Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Jul 22, 2026 | 2008 Lombard St Unit #a: conversion of existing bedroom to a 3 fixture bath to a wet bar. Issued | Home remodel | Issued | Within 1 month | |
| May 5, 2026 | 1444 Egbert Av To comply wiht nov#: 202651039; reverse front security door swinging to inward, remove bollards at front exterior wall. legalize of interior partitions modifications. Complete | Legalize or fix a violation | Complete | Within 1 month | |
| May 7, 2024 | 731 Capp St Revision to pa# 202308094084: garage- laundry stays, add (2) fixture bath. 1/f- remodel (e) bath as 3 fixture bath, combine (e) bedrooms, hallway closet and (e) w/c to a master bedroom. combine bedroom #3, (e) hallway sloet and (e) bath to a master bedroom on the 3/f. Issued | Revision or supplement | Issued | 2 months | |
| Aug 9, 2023 | 731 Capp St 1/f: demo partition wall, relocate (e) water heater, furnace, add lights; 2/f:change (e) closet to half bath at stairwell, change (e) closet to a full bath, combine (e) bedrm & bath to masterbedrm, demo (e) non-bearing wall btw kitchen & dining & remodel; 3/f: change (e) closet to full bath, combine Issued | Home remodel | Issued | Within 1 month | |
| May 25, 2023 | 72 Tucker Av Add a deck in rear yard extending from 2/f connecting to ground Complete | Deck, stairs or patio cover | Complete | Within 1 month | |
| Oct 14, 2022 | 1317 Masonic Av Commencent of work not started under prev approved permit. 201708094367. seismic retrofit soft story Complete | Seismic retrofit or foundationType unconfirmed | Complete | Within 1 month | |
| Jul 17, 2018 | 2930 Sacramento St Structural upgrade: install shear walls, retaining walls and moment frames. comply with spebc chapter 4d per 2016 cebc appendix a-4. Complete | Seismic retrofit or foundation | Complete | 1 month | |
| Dec 29, 2017 | 226 Irving St #0 To comply with nov 201717854 - soft story seismic retrofit program sfebc chapter 4d per 2016 cebc appx a4 Issued | Seismic retrofit or foundationType unconfirmed | Issued | 20 months | |
| Nov 30, 2017 | 4840 California St Voluntary structural strengthening, repair substandard framing and dry rot unconditioned. repair existing sun room at rear in kind. interior remodel including kitchen and bathrooms. add new skylights. windows at front ot be in-kind replacement wd to wd w/individual lites per google jan 2017 photo. Complete | Home remodel | Complete | Within 1 month | |
| Sep 13, 2017 | 1532 Larkin St Soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 Cancelled | Seismic retrofit or foundation | Cancelled | — | |
| Sep 13, 2017 | 1215 Pacific Av Soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 Complete | Seismic retrofit or foundation | Complete | 11 months | |
| Sep 13, 2017 | 3232 Taraval St #0 Soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 Complete | Seismic retrofit or foundation | Complete | Within 1 month | |
| Sep 8, 2017 | 2335 Chestnut St Commericial: to comply with sf soft-story seismic retrofit program sfebc ch. 4d per 2016 cebc appendix chapter a-4. Complete | Seismic retrofit or foundation | Complete | 2 months | |
| Sep 8, 2017 | 2335 Chestnut St #0 Upgrade (e) accessible entrance door and rstroom at unit 2335 on g/f. Complete | Commercial or tenant improvement | Complete | 2 months | |
| Sep 8, 2017 | 2335 Chestnut St Residential: to comply with sf soft-story seismic retrofit program sfebc ch. 4d per 2016 cebc appendix chapter a-4. Complete | Seismic retrofit or foundation | Complete | 2 months | |
| Sep 8, 2017 | 3674 16th St #0 Unit #1 - remodel (e) living room, kitchen, bathroom, family roo & bedroom on 1st floor. Complete | Home remodel | Complete | 2 months | |
| Sep 8, 2017 | 3674 16th St #0 Comply with san francisco soft story seismic retrofit program sfebc chapter 4d per 2016 cebc appendix chapter a-4. Complete | Seismic retrofit or foundation | Complete | 2 months | |
| Sep 8, 2017 | 821 Vallejo St #0 Comply with san francisco soft story seismic retrofit program sfebc chapter 4d per 2016 cebc appendix chapter a-4. Complete | Seismic retrofit or foundation | Complete | 2 months | |
| Aug 25, 2017 | 120 Pierce St #0 To comply with sf soft story seismic retrofit program sfebc chapter f4 per 2016 cebc appendix chatper a-4. Complete | Seismic retrofit or foundation | Complete | 2 months | |
| Aug 25, 2017 | 4314 17th St To comply with sf soft story seismic retrofit program sfebc chapter 4d per 2016 cebc appendix chatper a-4. Complete | Seismic retrofit or foundation | Complete | 13 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Jing Zhan Chen? Request a correction.