John A Chipman
Architect · Chipman Design Architecture · Des Plaines
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-26140First issued Dec 28, 1995, expires Jun 30, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 32 permits since 2012, 32 in the last 5 years. Latest filed Jun 17, 2025.
- What kind of projects?
- Commercial or tenant improvement 30 · Other 2
- How long do their permits take?
- Commercial or tenant improvement: 2 months. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 30 permits in San Francisco
Time to get a permit
Median from filing to permit, from 24 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 20,097 permits.
Where
- Financial District/South Beach23
- Tenderloin2
- Pacific Heights1
- Chinatown1
Most recent
- 2226 Fillmore St #0Interior ti is on ground floor "mezzanine" level. no hvac and plumbing to scope. ti includes: demo and electrical work.Jun 17, 2025Complete
- 2 Folsom St12th & 14th fl- interior demo & ti. including install of new non load bearing partitions. install new lighting & receptacles. install new millwork. associated mep workNov 15, 2024Complete
- 2 Folsom St11th & 13th fl- interior demo & ti. includes install of (n) non load bearing partitions. install (n) lighting & receptacles. install (n) millwork. associated mep work.Nov 15, 2024Complete
- 2 Folsom St15th fl ti: new partitons, ceilings, fixtures, finishes & mepJul 18, 2024Complete
- 2 Folsom St3rd fl interior ti new non load bearing partitoins, doors, finishes. existing lighting shall remain with some fixtures to be relocated per new wall locations. mep deferred.May 10, 2024Issued
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Aug 25, 2025 | 2226 Fillmore St Revision to pa #202506178857. replace existing double entry doors with new doors, which include new door hardware. Complete | Revision or supplement | Complete | Within 1 month | |
| Jun 17, 2025 | 2226 Fillmore St #0 Interior ti is on ground floor "mezzanine" level. no hvac and plumbing to scope. ti includes: demo and electrical work. Complete | Commercial or tenant improvement | Complete | 2 months | |
| Nov 15, 2024 | 2 Folsom St 12th & 14th fl- interior demo & ti. including install of new non load bearing partitions. install new lighting & receptacles. install new millwork. associated mep work Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Nov 15, 2024 | 2 Folsom St 11th & 13th fl- interior demo & ti. includes install of (n) non load bearing partitions. install (n) lighting & receptacles. install (n) millwork. associated mep work. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Nov 7, 2024 | 2 Folsom St 3/f: deferred electrical permit for pa# 202405101903. clarification that no deferred mechanical or plumbing required. trade permit required. Issued | Revision or supplement | Issued | 6 months | |
| Jul 18, 2024 | 2 Folsom St 15th fl ti: new partitons, ceilings, fixtures, finishes & mep Complete | Commercial or tenant improvement | Complete | 1 month | |
| May 10, 2024 | 2 Folsom St 3rd fl interior ti new non load bearing partitoins, doors, finishes. existing lighting shall remain with some fixtures to be relocated per new wall locations. mep deferred. Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Apr 24, 2024 | 2 Folsom St 7th fl - interior ti includes 3 new training spaces, office space & storage space. new non-load bearing partitions, ceilings, finishes & mech/elec Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Apr 9, 2024 | 2 Folsom St 9th fl interior ti new mock store and open office. includes new non load bearing partitions and altered lighting Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Mar 25, 2024 | 2 Folsom St 7/f: demo existing non-load bearing partitions for future office ti. per ab-017. Complete | Commercial or tenant improvement | Complete | 1 month | |
| Sep 28, 2023 | 2 Folsom St 12/f: revision to pa# 202308295512, reduced scope of work no longer done in designed access Complete | Revision or supplement | Complete | 1 month | |
| Sep 28, 2023 | 2 Folsom St 9/f: revision to pa# 202307202579, reduced scope updated lighting & finishes, added equipmenmt & power locations, revised room layout, added structural details. Complete | Revision or supplement | Complete | 1 month | |
| Aug 29, 2023 | 2 Folsom St 12/f - interior ti incudes new non-load bearing partitions, lighting, & finishes. mep deferred. Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Jul 20, 2023 | 2 Folsom St 10/f: interior ti includes new non-load bearing partitions, lighting, millwork and finishes. mep deferred. Complete | Commercial or tenant improvement | Complete | 2 months | |
| Jul 20, 2023 | 2 Folsom St 9/f: interior ti includes new non-load bearing partitions, lighting, millwork and finishes. mep deferred. Complete | Commercial or tenant improvement | Complete | 2 months | |
| May 9, 2023 | 152 Geary St Revision 202211146477 changes included revised 1st fl layout, new fireplace, n interior tree, changing room locations, 2nd fl restroom layout, updated finishes, mep update. no exterior work. Issued | Revision or supplement | Issued | 3 months | |
| Nov 14, 2022 | 152 Geary St New retail w/in (e) vacant building. mep included. new fitting rooms, restrooms & partitions. no work on exterior metal panels Complete | Commercial or tenant improvement | Complete | 5 months | |
| Sep 10, 2021 | 2 Folsom St Ti on ground floor interior remodel mercantile/interios space contained within the existing shell, suites. 2c + 2d fire alarm, fire sprinkler, signage, racking under seperate permit. Complete | Commercial or tenant improvement | Complete | 4 months | |
| Sep 9, 2021 | 2 Folsom St Tenant improvement for new retail space in ste 2a & 2b - fire alarm, fire sprinkler, signage, racking, under separate permit Complete | Commercial or tenant improvement | Complete | 4 months | |
| Jun 30, 2021 | 2 Folsom St Ground floor change use from office to retail. no change in building gross floor area. scope include replacementof (e) storefront glazing /new storefront door and sides lights interior ti build out under seperate permit. Complete | Commercial or tenant improvement | Complete | 7 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you John A Chipman? Request a correction.