Licensed?
License activeStructural Engineer S-3114First issued Nov 18, 1988, expires Jun 30, 2028.

Source: DCA license roster, retrieved Nov 5, 2026

Verify on DCA License Search

Any board discipline?
None found.

We searched the BPELSG enforcement list on Nov 5, 2026.

Worked in San Francisco?
27 permits since 2007, 27 in the last 5 years. Latest filed Dec 28, 2025.
What kind of projects?
Seismic retrofit or foundation 17 · Home remodel 8 · Deck, stairs or patio cover 1
How long do their permits take?
Home remodel: within 1 month. City typical for the same review: within 1 month.

Permits filed each year

San Francisco permits by the year they were filed. The last 5 years are in blue.

What are you planning?

Pick your kind of project to see their permits for it.

Permits
33 permits that name John Anthony Dal Pino, newest first, including 6 revisions or supplements that are not counted. Select a permit to see the full record.
FiledProjectOpen
Dec 28, 20251485 Clay St

Complete seismic retrofit on an existing soft story buildiong. (adu under separate permit)

Filed
Jun 20, 20242660 Pacific Av

Replace rotten wood joists and reinforce with metal beams and lvl joists on the garage roof deck.

Complete
Aug 19, 2022224 Grant Av

Structural repair of ground floor slab supports in limited basement area. new hss beams and (e) concrete beam rapir.

Complete
Oct 1, 20212900 Washington St

Add platform for safe access to (e) roof ladder @ rear of bldg

Complete
Sep 28, 2021338 Main St #37

Revision to pa 201803153740. reduce height of proposed deck wind screen from 5' to 3'6" above deck finish floor.

Cancelled
Aug 5, 2019453 Union St #0

Revision to pa 201707273050 & 201707273051 for final inspection (soft story)

Complete
Sep 27, 20181400 17th St

1)revision to app#201706220136. 2) replace extg windows by nw at north, south & east walls. 3) partially infill 2 wndow openings and replace extg windows w/nw re-sized windows at east wall. 4) replace 2 extg doors w/nw doors at south wall. 5) revise structural det. as per sheets s2.3.n/a for maher

Complete
Aug 15, 2018701 Union St

Commercial compliance with mandatory seismic retrofit per iebc chapter a4. disabled access upgrade at restaurant entrance and restroom triggered by soft story upgrade.

Complete
Apr 10, 2018575 Columbus Av

Residential - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial soft story under pa 201804105939

Complete
Apr 10, 2018577 Columbus Av

Commercial - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. disabled access upgrade at entrances and restaurant toilet room

Complete
Feb 15, 20182439 Lombard St

Commercial: soft story retrofit per sfebc chapter 4d engineering criteria fema p-807. disabled access upgrades at commercial entrances. ref residential #201802151359. maher na

Complete
Feb 15, 20182439 Lombard St

Residential: soft story retrofit per sfebc chapter 4d engineering criteria fema p-807. ref commercial #201802151361. maher n/

Complete
Jan 18, 20183449 Pacific Av

Voluntary partial seismic upgrade, replace stucco in-kind as needed at front facade. match facade details to (e)

Complete
Jan 8, 20181969 California St

Revision to 201711143982 - ca revision sks for as built conditions: scope - demo interior - wall at basement & replace with 2 posts & a beam to open up a wall at (e) storage area & (e) bedroom which is to be converted to a private office. maher na

Issued
Nov 20, 20171267 Chestnut St #1

Mandatory soft story retrofit using fema p-807. ** maher: n/a **

Complete
Nov 14, 20171969 California St #0

Demolish interior wall at basement & replace with 2 posts & a beam, opening up wall between existing storage and an existing bedroom which is to be converted to private office. n/a maher ordinance

Issued
Nov 14, 2017334 Noe St #0

Soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. n/a maher ordinance

Complete
Oct 30, 20171635 Chestnut St

Removal of middle posts at garage level; seismic upgrade for existing garage level; new living rm/powder rm at rear of garage to replace e storage rm and e toilet rm

Complete
Oct 12, 20172574 Broadway

Basement level, relocate existing laundry room, remodel 2 existing bathrooms, new lighting. level 1 no work level 2 no work level 3 no work, maher not req.

Expired
Sep 12, 2017865 Filbert St #0

Soft story retrofit per sfebc ch.4d - 2016 cebc appendex a-4.

Complete

Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.

Are you John Anthony Dal Pino? Request a correction.