Joseph Camajani
Engineer · San Anselmo
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeStructural Engineer S-5778First issued Jun 21, 2012, expires Dec 31, 2026.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 6 permits since 2023, 6 in the last 5 years. Latest filed Aug 26, 2026.
- What kind of projects?
- Commercial or tenant improvement 4 · Addition 1 · New building 1
- How long do their permits take?
- Commercial or tenant improvement: 2 months. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 4 permits in San Francisco
Time to get a permit
Median from filing to permit, from 4 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 13,561 permits.
Where
- Financial District/South Beach3
- Potrero Hill1
Most recent
- 1800 Owens StSector 1, level 1; t.i. to develop a pilates studio. work out area with (12) reformers machines, reception area with merchandise. propose new exterior entrance. approx 100 sqft. of the slab in new entry way to be demo and sloped (1.5% max) for accessiblity.Mar 16, 2026Issued
- 100 Montgomery St10/f: demolition of existing non-structural partitions, decorative ceiling baffles, lighting, millwork and finishes. new constructuion of new finishes, millwork and decorative lighting. existing floor plan layout to remain. no change in occupant group. no change in mechanical.Feb 27, 2026Complete
- 201 03rd St12 flr; t.i. on 12th flr. scope of work includes demolition of non-structural partitions,doors, and sidelights, millwork, ceiling and lighting, and finishes and power, construction of mother's room and accessible single user all gender restroom and existing accessibility upgradesJul 9, 2025Complete
- 201 03rd StConstruction of interior storefront system and doors in lobbyApr 18, 2024Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Aug 26, 2026 | 198 Wisteria Ln Priority mayor 13-01. block c & d: erect 6-story (block c) & (block d), type 3a over 1a construction, market-rate multi-family residential with 243 units. Filed | New building | Filed | — | |
| Mar 16, 2026 | 1800 Owens St Sector 1, level 1; t.i. to develop a pilates studio. work out area with (12) reformers machines, reception area with merchandise. propose new exterior entrance. approx 100 sqft. of the slab in new entry way to be demo and sloped (1.5% max) for accessiblity. Issued | Commercial or tenant improvement | Issued | 4 months | |
| Feb 27, 2026 | 100 Montgomery St 10/f: demolition of existing non-structural partitions, decorative ceiling baffles, lighting, millwork and finishes. new constructuion of new finishes, millwork and decorative lighting. existing floor plan layout to remain. no change in occupant group. no change in mechanical. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Jul 9, 2025 | 201 03rd St 12 flr; t.i. on 12th flr. scope of work includes demolition of non-structural partitions,doors, and sidelights, millwork, ceiling and lighting, and finishes and power, construction of mother's room and accessible single user all gender restroom and existing accessibility upgrades Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Apr 18, 2024 | 201 03rd St Construction of interior storefront system and doors in lobby Complete | Commercial or tenant improvement | Complete | 3 months | |
| Jul 25, 2023 | 2001 37th Av The project consist of a proposed 142500 gsf addition of educational and accessory spaces to an existing education building. the existing building is 3 stories and the addition proposed is three stories plus basement. approximately 58800 gsf of existing educationaland accessory spaces will be Issued | Addition | Issued | 12 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Joseph Camajani? Request a correction.