Julia Jiyeon-Kim Seen
Architect · Nelson Architecture,Inc · Dublin
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-29927First issued Oct 1, 2004, expires Apr 30, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 5 permits since 2018, 5 in the last 5 years. Latest filed Nov 25, 2025.
- What kind of projects?
- Commercial or tenant improvement 5
- How long do their permits take?
- Commercial or tenant improvement: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 5 permits in San Francisco
Time to get a permit
Median from filing to permit, from 5 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 5,178 permits.
Where
- Financial District/South Beach5
Most recent
- 222 02nd St14th fl/ installation of ner unistrut grid suspended from the existing floor structure above. this project does not propose any chnages to size, use or occupancy of existing spaces, therefore, the egress is not affected by the installation of new equipment.Nov 25, 2025Complete
- 121 Spear StFloors 2, 5, 6 offices: install new bevi water dispensing unit at existing breakroom, including minor plumbing and case work modification.Sep 26, 2025Complete
- 215 Fremont St2nd, 3rd and 4th fl. install new bevi water dispensers at (e) break rooms. scope of work includes minor plumbing and casework modifications.Sep 26, 2025Complete
- 188 Spear StFloor finishes (approx 400sf), power work in room 402 elec to be design /buildDec 17, 2019Issued
- 188 Spear StRemove security turnstiles in suites, replace w/door. flrs 2-8Jun 20, 2018Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Nov 25, 2025 | 222 02nd St 14th fl/ installation of ner unistrut grid suspended from the existing floor structure above. this project does not propose any chnages to size, use or occupancy of existing spaces, therefore, the egress is not affected by the installation of new equipment. Complete | Commercial or tenant improvementType unconfirmed | Complete | Within 1 month | |
| Sep 26, 2025 | 121 Spear St Floors 2, 5, 6 offices: install new bevi water dispensing unit at existing breakroom, including minor plumbing and case work modification. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Sep 26, 2025 | 215 Fremont St 2nd, 3rd and 4th fl. install new bevi water dispensers at (e) break rooms. scope of work includes minor plumbing and casework modifications. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Aug 27, 2025 | 222 02nd St New non-load bearing interior furred walls. ceiling modification and new floor finish. electrical modification to support new recording studio. ref pa 202404240675 Complete | Revision or supplementType unconfirmed | Complete | Within 1 month | |
| Dec 17, 2019 | 188 Spear St Floor finishes (approx 400sf), power work in room 402 elec to be design /build Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Oct 26, 2018 | 188 Spear St Floors 2-8. revision to pa #201806202382. relocation of 24hr comm intercoms (coord. w/201809079405) minor increase in demo, minor decrease in other scopes. Complete | Revision or supplement | Complete | Within 1 month | |
| Jun 20, 2018 | 188 Spear St Remove security turnstiles in suites, replace w/door. flrs 2-8 Complete | Commercial or tenant improvement | Complete | 2 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Julia Jiyeon-Kim Seen? Request a correction.