Ken Ngoc Nguyen
Engineer · Ken Ngoc Nguyen · Elk Grove
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeCivil Engineer C-70656First issued Jan 26, 2007, expires Jun 30, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 55 permits since 2005, 55 in the last 5 years. Latest filed Oct 14, 2026.
- What kind of projects?
- Home remodel 19 · Legalize or fix a violation 15 · Commercial or tenant improvement 8
- How long do their permits take?
- Home remodel: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 19 permits in San Francisco
Time to get a permit
Median from filing to permit, from 18 issued permits filed since 1966; 1 still in review. City is the San Francisco median for the same kind of review, from 19,950 permits.
Where
- West of Twin Peaks3
- Oceanview/Merced/Ingleside3
- Bayview Hunters Point3
- Sunset/Parkside2
Most recent
- 400 Goettingen StKitchen remodel, 2 bath remodel, add 2 new baths(one on1st, one on 2nd fl) reconfigure 2nd fl for opens space add washer dryer on 2nd fl, add storage room gr flOct 14, 2026Filed
- 778 Foerster StKitchen remodel on 2nd/f, replace in kind 2 post w/ new pier footing as shown, new front windowJul 24, 2026Issued
- 501 Campbell AvAdd 1 full bathroom, remodel kitchen, and replace 3 windows.Jul 10, 2026Issued
- 70 Granada AvGround flr: add bedroom, one storage room, and full bath. no work on 2nd flr.May 15, 2025Complete
- 119 Nueva AvGr fl remodel: add 2 bedrooms, 1 full bath, 1/2 bath. 2nd fl: kitchen remodel, remodel 1 full bath, add 1 full bath. upgrade electrical main panel from 100 amp to 200 ampJan 23, 2025Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Oct 14, 2026 | 400 Goettingen St Kitchen remodel, 2 bath remodel, add 2 new baths(one on1st, one on 2nd fl) reconfigure 2nd fl for opens space add washer dryer on 2nd fl, add storage room gr fl Filed | Home remodel | Filed | — | |
| Jul 24, 2026 | 778 Foerster St Kitchen remodel on 2nd/f, replace in kind 2 post w/ new pier footing as shown, new front window Issued | Home remodel | Issued | Within 1 month | |
| Jul 10, 2026 | 501 Campbell Av Add 1 full bathroom, remodel kitchen, and replace 3 windows. Issued | Home remodel | Issued | Within 1 month | |
| Feb 27, 2026 | 2001 Van Ness Av Ref 202512292884 to include mep work. to include replace water fountain and fixtures and finishes. Complete | Revision or supplement | Complete | Within 1 month | |
| Oct 20, 2025 | 70 Granada Av On ground level: sectional foundation repair as shown on prepared layout to level out the concrete slab. interior work only. ref: 202505156603 Complete | Seismic retrofit or foundation | Complete | Within 1 month | |
| May 21, 2025 | 1731 Buchanan St Existing retail store to full service restuaurant install new hood plumbing gas and electrical defer med under separate submital Complete | Commercial or tenant improvement | Complete | 3 months | |
| May 15, 2025 | 70 Granada Av Ground flr: add bedroom, one storage room, and full bath. no work on 2nd flr. Complete | Home remodel | Complete | 3 months | |
| Jan 23, 2025 | 119 Nueva Av Gr fl remodel: add 2 bedrooms, 1 full bath, 1/2 bath. 2nd fl: kitchen remodel, remodel 1 full bath, add 1 full bath. upgrade electrical main panel from 100 amp to 200 amp Complete | Home remodel | Complete | Within 1 month | |
| Jan 14, 2025 | 1707 40th Av On ground level: add one family room and one full bath. on 2nd floor: kitchen remodel and bath room remodel. upgrade electrical main to 200 amp. Issued | Home remodel | Issued | 2 months | |
| Jan 6, 2025 | 51 West Portal Av Tenant improvement for dragoneats (sandwich and coffee togo) as shown on proposed plans Complete | Commercial or tenant improvement | Complete | 2 months | |
| Jul 8, 2024 | 1282 48th Av Proposed to convert garage level to adu with 2-bedrooms, 1-kitchen, dining room and a full bath. Triage | ADU | Triage | — | |
| Nov 7, 2023 | 212 Tocoloma Av G/f voluntary strengthening of beams and posts for better stability, on 2/f kitchen and bathroom remodel; add 1-new bathroom Complete | Home remodelType unconfirmed | Complete | 1 month | |
| Mar 10, 2023 | 92 Tioga Av Proposed legalization of rooms on ground level compliance to address complaint# 202299748 Complete | Legalize or fix a violation | Complete | 7 months | |
| Feb 15, 2023 | 1773 Haight St To comply with complaint# 202302099: document change of use to retail to barbershop. ada restroom. proposed to comply with new codes. Complete | Legalize or fix a violation | Complete | 4 months | |
| Dec 30, 2022 | 75 07th Av Excavate garage to park taller vehicle, relocate laundry,bath & utilities @ basement/garage level of home.new fau,new waterheater,(n)multi-panel door to rear yard.new footings & beams.new windows @ rear,new garage door & driveway apron within parcel.no change to public way. Complete | Home remodelType unconfirmed | Complete | 7 months | |
| Dec 12, 2022 | 90 San Benito Wy On 1st floor: kitchen remodel with wall removal as shown on proposed plans. Issued | Home remodel | Issued | 4 months | |
| Dec 7, 2022 | 1800 35th Av Revision to permit 202202168120 - propose to change the concrete stregth fc 3000psi to 2500psi, and to remove the requirement of concrete sampling and lab test. Withdrawn | Revision or supplement | Withdrawn | — | |
| Sep 28, 2022 | 2333 Irving St Amend to (e) approved structural plans. referenced to pa# 2021-1210-4190 to change structural design and concrete design specification to 2500 psi. Complete | Revision or supplement | Complete | Within 1 month | |
| Sep 20, 2022 | 1184 Valencia St Proposed a new nail spa. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Aug 17, 2022 | 2050 Fillmore St Applying electrical permit for lighting - title 24 compliance. ref 2022 0308 9472. Issued | Revision or supplementType unconfirmed | Issued | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Ken Ngoc Nguyen? Request a correction.