Kevin J Short
Architect · Tiny Montster Design
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-35154First issued Jun 11, 2015, expires Dec 31, 2027.
Source: DCA License Search, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 22 permits since 2017, 22 in the last 5 years. Latest filed Jun 16, 2026.
- What kind of projects?
- Home remodel 11 · Other 4 · Legalize or fix a violation 3
- How long do their permits take?
- Home remodel: 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 11 permits in San Francisco
Time to get a permit
Median from filing to permit, from 10 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 9,405 permits.
Where
- Mission4
- Bernal Heights3
- West of Twin Peaks1
- Excelsior1
Most recent
- 101 Stratford DrInterior remodel at kitchen, bathrooms, and adjacent areas, including structural improvement.Apr 12, 2024Complete
- 223 Richland AvStructural improvements, new interior stair, interior alterationsJan 12, 2024Issued
- 326 Lexington StResidential interior improvements-bathroom remodel, new cabinets, new finish flooring. no exterior work.Aug 28, 2023Complete
- 3839 Folsom StNew garage at 1st floor of existing building in existing storage areaApr 1, 2021Complete
- 160 Harvard StRemodel of existing bathroom.Nov 3, 2020Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Jun 16, 2026 | 1874 23rd Av Interior improvement and a new 1-story horizonatal rear addition, including a new interior stair, a new 1st flr living space, new 1st flr bedroom and bathroom, and related structural work. Filed | Addition | Filed | — | |
| Oct 21, 2024 | 326 Lexington St Field revisions to permit 202308285370. new non-structural interior modification, and new structural blocking. Filed | Revision or supplement | Filed | — | |
| Oct 8, 2024 | 101 Stratford Dr Revision to pa# 202404129846: 1) existing guardrails to remain, no filet weld inspection. 2)conduct pull test for bolts installed in concrete. Issued | Revision or supplement | Issued | 1 month | |
| Jun 4, 2024 | 223 Richland Av Street facing window replacement and side yard stair improvement. Issued | OtherType unconfirmed | Issued | 9 months | |
| Apr 12, 2024 | 101 Stratford Dr Replace 8 windows. not street facing. Complete | Other | Complete | 1 month | |
| Apr 12, 2024 | 101 Stratford Dr Interior remodel at kitchen, bathrooms, and adjacent areas, including structural improvement. Complete | Home remodel | Complete | 1 month | |
| Jan 12, 2024 | 223 Richland Av Structural improvements, new interior stair, interior alterations Issued | Home remodel | Issued | 6 months | |
| Aug 28, 2023 | 326 Lexington St Residential interior improvements-bathroom remodel, new cabinets, new finish flooring. no exterior work. Complete | Home remodel | Complete | 3 months | |
| Apr 1, 2021 | 3839 Folsom St New garage at 1st floor of existing building in existing storage area Complete | Home remodelType unconfirmed | Complete | 1 month | |
| Nov 3, 2020 | 160 Harvard St Remodel of existing bathroom. Complete | Home remodel | Complete | 3 months | |
| Sep 12, 2020 | 3839 Folsom St Rear yard stair removal, bay window improvements, new dormers, replacement of windows, exterior siding, roofing. no horizontal/vertical addition. Complete | Other | Complete | 6 months | |
| Jan 29, 2020 | 414 27th St New condition ed area in e basement including new bedroom, bath, office, gym, laundry. incl structural scope for basement work. remove e fireplace construction 1st fl Cancelled | Home remodel | Cancelled | — | |
| Sep 26, 2019 | 235 Corbett Av #0 Provide revision to 201907236599 revision includes modification to skylights at roof level Complete | Revision or supplement | Complete | 2 months | |
| Aug 29, 2019 | 350 College Av Kitchen remodel including modified layout, new finishes, fixtures, and appliances Complete | Home remodel | Complete | 2 months | |
| Jul 23, 2019 | 233 Corbett Av Provide roof improvements at subject building including: new roof-mounted hvac equipment, in-kind replacement of 2 (e) skylights and 2 (n) skylights, install new rafters for roof structural reinforcement. Complete | OtherType unconfirmed | Complete | Within 1 month | |
| Jul 17, 2019 | 64 Rosemont Pl #0 Remodel bathroom- install new toilet, walk in shower and finishes. Complete | Home remodel | Complete | Within 1 month | |
| Apr 29, 2019 | 1377 Haight St Revision to 201804277683 revised restroom layout Issued | Revision or supplement | Issued | 1 month | |
| Mar 25, 2019 | 68 Mccoppin St #1 New secruity light gage metal gate at ground level garage alone Complete | Deck, stairs or patio cover | Complete | Within 1 month | |
| Mar 12, 2019 | 1419 Palou Av Two 8'x8' dormers on roof per planning code with structural improvements to frame of house. Complete | AdditionType unconfirmed | Complete | Within 1 month | |
| Mar 1, 2019 | 87 Mcallister St Lighting t-24 calculations for previously permit application #201810294357 Complete | Revision or supplement | Complete | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Kevin J Short? Request a correction.