Kevin S James
Architect · Mcg · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-27743First issued Apr 7, 1999, expires May 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 13 permits since 2004, 13 in the last 5 years. Latest filed Oct 18, 2023.
- What kind of projects?
- Commercial or tenant improvement 8 · Other 5
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 8 permits in San Francisco
Time to get a permit
Median from filing to permit, from 6 issued permits filed since 1966.
Where
- Nob Hill2
- Lone Mountain/USF1
- Chinatown1
- Portola1
Most recent
- 3535 Geary BlTenant improvement: partial demolition of (2) walls, (2) electrical receptacles for owner provided fixturs.Jun 7, 2021Cancelled
- 728 Pacific Av #201Suite #201: no construction; tenant space to remain as is. previous a-2 accessory occupancy to be reinstated to activity area under current existing property conditionsNov 17, 2020Issued
- 2633 San Bruno AvSuite a: t.i.: new walls & doors, new plumbing fixtures & electrical. new ceiling, new finishes. removal of 2 showers, new hvac unit for 1/f. maher n/a.Sep 26, 2020Complete
- 1301 Van Ness AvSecurity improvement to an existing 19,246 sq ft retail tenant. work limited to the replacement of an existing glazed door at sutter facade w/(n) hollow metal door and (n) rolling security door at internal stairs per plans. **maher n/a**Sep 26, 2020Cancelled
- 761 Post St #0Interior non-structural demolition at basement, mezzanine and floors 1-17. all work to comply with ab-017.Jul 19, 2013Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Oct 18, 2023 | 1567 Sloat Bl The work will primarily be anew mechanical chase penetrating the 2nd floor and roof deck. no work will be conducted within the existing 2nd floor tenant spaces. work to include new mechanical chase infrastructure for future tenant Complete | OtherType unconfirmed | Complete | 4 months | |
| Jun 7, 2021 | 3535 Geary Bl Tenant improvement: partial demolition of (2) walls, (2) electrical receptacles for owner provided fixturs. Cancelled | Commercial or tenant improvement | Cancelled | — | |
| Mar 23, 2021 | 201 Bay Shore Bl Removal and upgrade to existing electrical services Cancelled | Other | Cancelled | — | |
| Mar 23, 2021 | 201 Bay Shore Bl New hvac upgrades - new vrf heatpump system and provide new zoning layout. new condensate drains. Cancelled | Other | Cancelled | — | |
| Nov 17, 2020 | 728 Pacific Av #201 Suite #201: no construction; tenant space to remain as is. previous a-2 accessory occupancy to be reinstated to activity area under current existing property conditions Issued | Commercial or tenant improvementType unconfirmed | Issued | 3 months | |
| Sep 26, 2020 | 2633 San Bruno Av Suite b: rev to pa 202002215145: addition of a new vertical ada lift in lieu of a stairway platform lift. conversion of one room into 2 smaller rooms containing plumbing fixtures & lighting. two adjacent rooms also enlarged. Issued | Revision or supplement | Issued | 8 months | |
| Sep 26, 2020 | 2633 San Bruno Av Suite a: t.i.: new walls & doors, new plumbing fixtures & electrical. new ceiling, new finishes. removal of 2 showers, new hvac unit for 1/f. maher n/a. Complete | Commercial or tenant improvement | Complete | 4 months | |
| Sep 26, 2020 | 1301 Van Ness Av Security improvement to an existing 19,246 sq ft retail tenant. work limited to the replacement of an existing glazed door at sutter facade w/(n) hollow metal door and (n) rolling security door at internal stairs per plans. **maher n/a** Cancelled | Commercial or tenant improvementType unconfirmed | Cancelled | — | |
| Sep 26, 2020 | 3251 20th Av Upgrade of (e) door to be secure with new secure hardware. not visible to street. Withdrawn | OtherType unconfirmed | Withdrawn | — | |
| Jul 19, 2013 | 761 Post St #0 Interior non-structural demolition at basement, mezzanine and floors 1-17. all work to comply with ab-017. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Jun 14, 2012 | 1401 California St Documentation of accessibilit in parking area, entry doors, elevators for core upgrade to e building. no construction work. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Nov 30, 2011 | 1401 California St Partial exterior demolition and partial renovation of the core and shell. Complete | Commercial or tenant improvementType unconfirmed | Complete | 4 months | |
| Dec 2, 2005 | 899 Howard St Occupy vacant space for retail expansion Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Aug 9, 2004 | 899 Howard St Modify (e) facade, entrance and handicap ramp. Complete | Other | Complete | 4 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Kevin S James? Request a correction.