Kevin Thomas O'keefe
Engineer · Universal Structural Engineers · Montara
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeStructural Engineer S-4192First issued Mar 20, 1998, expires Dec 31, 2026.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 20 permits since 2014, 20 in the last 5 years. Latest filed Sep 14, 2026.
- What kind of projects?
- Commercial or tenant improvement 8 · Home remodel 3 · Addition 3
- How long do their permits take?
- Commercial or tenant improvement: 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 8 permits in San Francisco
Time to get a permit
Median from filing to permit, from 8 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 14,539 permits.
Where
- Financial District/South Beach4
- South of Market2
- Bayview Hunters Point1
- Mission1
Most recent
- 345 California St6/f & 7/f: installation office phone booth anchorage & structural details included.May 27, 2026Issued
- 65 Oak Grove StNew exterior facade main entry and paint around. maintain andupdate the (e) g/f interior parking and including a new 2-story entry lobby including (n) elevator and grand stair to 2/f. ti on 2/f:reception,offices, conference room areas,meeting room,restrooms and office support areas. skylight and pv.Feb 20, 2025Issued
- 101 California StRamp, stair, upper floor railing. ramp interior work in parking lot. reference: 202303103491Aug 22, 2024Complete
- 3 Embarcadero Center3rd fl: partial fl t.i., new non-load bearing partitions, ceilings & floor finishes. infill deck. 4th fl: modify (e) shower room into all gender restroom. new mep.Jun 15, 2022Complete
- 595 Market St11/f suite 1100: ti to combine 2 existing suites into a single suite (#1100). demolition of (e) wall, finishes, replacement of ceiling system. lighting, millwork and finishes. new walls, doors. new 1 single use restroom and modify (e) mep system.Nov 17, 2021Issued
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Sep 14, 2026 | 660 03rd St Remove 8 (e) rooftop package units. replace with 8 new units. reconnect existing duct, electrical, gas pipe, drain line and thermostat wire. Issued | Other | Issued | Within 1 month | |
| May 27, 2026 | 345 California St 6/f & 7/f: installation office phone booth anchorage & structural details included. Issued | Commercial or tenant improvement | Issued | 3 months | |
| May 23, 2026 | 3958 Cesar Chavez St Vert & addition: 1/f: int renov/addition of bth,bed,laundry & sitting rm).2/f: bath,bed,kitchen, liv rm & din rm, rear deck. new 3/f: penthouse & powder rm, deck. skylight at roof. new int stairs connect 1/2/3 flrs & ext stairs connect patio to 2nd deck. Filed | Addition | Filed | — | |
| Jan 27, 2026 | 664 44th Av Horizontal additional and remodel. extension under overhead structure. new kitchen and bathrooms. Filed | Addition | Filed | — | |
| Feb 20, 2025 | 65 Oak Grove St New exterior facade main entry and paint around. maintain andupdate the (e) g/f interior parking and including a new 2-story entry lobby including (n) elevator and grand stair to 2/f. ti on 2/f:reception,offices, conference room areas,meeting room,restrooms and office support areas. skylight and pv. Issued | Commercial or tenant improvement | Issued | 14 months | |
| Aug 22, 2024 | 101 California St Ramp, stair, upper floor railing. ramp interior work in parking lot. reference: 202303103491 Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Oct 28, 2022 | 419 Peru Av Revision to pa# 202011038039 to change expansion anchors to j-bolts cast in place concrete. remove expansion achor special inspection. Complete | Revision or supplement | Complete | Within 1 month | |
| Aug 3, 2022 | 3982 Cesar Chavez St Interior remodel including kitchen and bathroom on 1/f. new electrical and plumbing at rea of new work. new exterior door & windows at area of new work (not street facing). deck addition to rear yard. replacement of rotten siding at area of new work. Complete | Home remodel | Complete | 1 month | |
| Jun 15, 2022 | 3 Embarcadero Center 3rd fl: partial fl t.i., new non-load bearing partitions, ceilings & floor finishes. infill deck. 4th fl: modify (e) shower room into all gender restroom. new mep. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Mar 15, 2022 | 595 Market St Rev to pa 202111172568 movable framed glass doors/structural drawing Complete | Revision or supplement | Complete | Within 1 month | |
| Nov 17, 2021 | 595 Market St 11/f suite 1100: ti to combine 2 existing suites into a single suite (#1100). demolition of (e) wall, finishes, replacement of ceiling system. lighting, millwork and finishes. new walls, doors. new 1 single use restroom and modify (e) mep system. Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Oct 18, 2021 | 360 Langton St Replace 4 existing ac units and 2 split systems with new Complete | Other | Complete | Within 1 month | |
| Jun 28, 2021 | 630 Vermont St Revision to pa# 201808207817/s-1. make few structural changes to the original plans. Complete | Revision or supplement | Complete | Within 1 month | |
| Apr 6, 2021 | 1740 Cesar Chavez St Suite #200: updating finishes in break areas, glass folding partiton (includes structural) no mep 1512 s.f. n/a maher. new drinking fountain. add plumbing drawing. Complete | Commercial or tenant improvement | Complete | 3 months | |
| Feb 8, 2021 | 360 03rd St 5/f structural revision to approved pa202010206988. strutural calcs and ref drawnings included. maher n/a. Issued | Revision or supplement | Issued | 3 months | |
| Jan 27, 2021 | 385 Castenada Av Change opening from door & 2 picture full size windows to 12' opening for sliding doors. Complete | Other | Complete | 1 month | |
| Jan 26, 2021 | 385 Castenada Av New guardrail and 2 balconies replacement. add spiral staircase to deck level from garden level. Complete | Deck, stairs or patio cover | Complete | 13 months | |
| Nov 3, 2020 | 419 Peru Av Voluntary structural upgrade of masonry foundation. addition of bath in basement. all work within (e) footprint. no facade work. no work in public right of way. interior work only. Complete | Seismic retrofit or foundationType unconfirmed | Complete | 7 months | |
| Oct 20, 2020 | 360 03rd St 5th flr. t.i to (e) equipment rooms limited to minor architectural, hvac and t.i alterations. Issued | Commercial or tenant improvement | Issued | 1 month | |
| Feb 5, 2020 | 75 Boardman Pl Ref pa# 201910305958; revision to t.i. to add structural for seismic anchoring of lifts and pallet racks Cancelled | Revision or supplement | Cancelled | — |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Kevin Thomas O'keefe? Request a correction.