Lawrence Michael Rugg
Architect · Lawrence Rugg Architecture · Oakland
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-19322First issued Jun 8, 1988, expires May 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 19 permits since 2015, 19 in the last 5 years. Latest filed Jul 6, 2022.
- What kind of projects?
- Home remodel 10 · Legalize or fix a violation 4 · Addition 2
- How long do their permits take?
- Addition: 4 months. City typical for the same review: 12 months.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 10 permits in San Francisco
Time to get a permit
Median from filing to permit, from 10 issued permits filed since 1966.
Where
- Sunset/Parkside5
- West of Twin Peaks2
- Lone Mountain/USF1
- Haight Ashbury1
Most recent
- 158 Beaumont AvLevel 2 remodel of (e) bath + closet. relocate (e) bath #2. add office. remove & replace (e) interior windows. new skylights.Dec 22, 2020Complete
- 178 Denslowe DrRemodel kitchen, bedroom, laundry room, and bathroom @ ground level. remove 2 north side window. fill in door at rear of building. replace existing window with new sliding door at rear of building. remodle 2 baths at 2nd level as per plans. reconfigured e rear deck and change direction of stairJan 17, 2020Complete
- 10 Lunado WyRemodel/relocate existing kitchen, master bedroom and bath hallway. create a new master bedroom and 1 full master bathOct 2, 2018Complete
- 1019 Ashbury StInterior residential at unit 8 & 9, first floor & second floors.Jun 20, 2018Complete
- 2614 39th AvRemodel kitchen, bedroom and closet. remodel existing bath and add bath where existing powder bath is.Jul 10, 2017Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Oct 6, 2023 | 6 August Al Rev to pa# 2023-0919-6946 & 2022-0706-7819; revise north wall framing to be one hour fire rated construction Expired | Revision or supplement | Expired | Within 1 month | |
| Sep 19, 2023 | 6 August Al Revision to 202207067819 to add bedroom partition, relocate living rm, add glass block opening in stair well, add washer dryer, add lav at bedroom. per existing conditions, revise foundtion along north wall, revise shear wall for new opening at 2nd fl stair#1, revise north wall framing to be fire ra Expired | Revision or supplement | Expired | Within 1 month | |
| Jul 6, 2022 | 6 August Al Alter (e) 2 unit bldg: 1st fl add usable space @ (n) media room/den add 2 ext'r doors, window & access stair @ south facade add bathrm, relocate furnace. 2nd fl replace (e) deck & stair, add door & window, 3rd fl relocate bath modify stair (n) ext'r glazed assembly north facade, (n) balcony Expired | AdditionType unconfirmed | Expired | 8 months | |
| Nov 29, 2021 | 4 Embarcadero Center 32/f: ref #202109178613. mep deferred Complete | Revision or supplement | Complete | Within 1 month | |
| Nov 29, 2021 | 4 Embarcadero Center 32/f: ref #202109178613. modify wall separating office from convenience stair per sffd plan check. revise womens bathroom layout. minor modification to some offices. Complete | Revision or supplement | Complete | Within 1 month | |
| Dec 22, 2020 | 158 Beaumont Av Level 2 remodel of (e) bath + closet. relocate (e) bath #2. add office. remove & replace (e) interior windows. new skylights. Complete | Home remodel | Complete | 1 month | |
| Jan 17, 2020 | 178 Denslowe Dr Remodel kitchen, bedroom, laundry room, and bathroom @ ground level. remove 2 north side window. fill in door at rear of building. replace existing window with new sliding door at rear of building. remodle 2 baths at 2nd level as per plans. reconfigured e rear deck and change direction of stair Complete | Home remodel | Complete | Within 1 month | |
| Sep 20, 2019 | 135 Main St 11th fl. interior office t.i.workspace, reception area open office area, and private offices, no change existing copy room server room, and break room at the back of office. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Oct 2, 2018 | 10 Lunado Wy Remodel/relocate existing kitchen, master bedroom and bath hallway. create a new master bedroom and 1 full master bath Complete | Home remodel | Complete | Within 1 month | |
| Jun 20, 2018 | 1019 Ashbury St Interior residential at unit 8 & 9, first floor & second floors. Complete | Home remodel | Complete | 4 months | |
| Dec 18, 2017 | 2807 Steiner St Comply w/ nov#200004155. legalize rear deck at 3rd level. Complete | Legalize or fix a violation | Complete | Within 1 month | |
| Dec 18, 2017 | 2807 Steiner St Comply with nov#201065867. removal of extg chimney. repair wall in kind at removed chimney. Complete | Legalize or fix a violation | Complete | Within 1 month | |
| Nov 9, 2017 | 1019 Ashbury St #0 Conversion of existing storage space to an apartment dwelling unit & common building storage untis per ordinance 162-16 Complete | ADU | Complete | 16 months | |
| Oct 12, 2017 | 2807 Steiner St #0 Revision to #201703020495 to address dbi correction notice. additional work to repair dry-rot and replace interior existing framing as shown on plans. maher na Complete | Revision or supplement | Complete | Within 1 month | |
| Jul 10, 2017 | 2614 39th Av Remodel kitchen, bedroom and closet. remodel existing bath and add bath where existing powder bath is. Complete | Home remodel | Complete | Within 1 month | |
| May 18, 2017 | 1627 24th Av Remodel kitchen and bedroom closets, add hall bath and remodel exsiting bath on level 2. no work on level 1. Complete | Home remodel | Complete | 2 months | |
| Mar 28, 2017 | 501 Panorama Dr 1/f- add 2 bedrooms, bath and media room. 2/f- remodel kitchen & bath, add closet. no exterior work visible from street. Complete | AdditionType unconfirmed | Complete | Within 1 month | |
| Mar 2, 2017 | 2807 Steiner St To comply with nov 201758142: interior renovation of all 9 unitd to include kitchen and ada bath remodel & interior finishes. mep. included. maher na Complete | Legalize or fix a violation | Complete | 1 month | |
| Feb 12, 2016 | 1770 24th Av Remodel kitchen and bathroom per plans on 2/f, open up wall at downstairs, relocate fire door from garage to living space, legalize media room & bath #3 at garage level. no exterior or facade work. Complete | Home remodelType unconfirmed | Complete | 1 month | |
| Jan 27, 2016 | 2 Shaw Al 4th floor - addition of a secured vestibule at the elevator. Cancelled | Commercial or tenant improvement | Cancelled | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Lawrence Michael Rugg? Request a correction.