CheckMyDesigner

Marcy Li Wong

Architect · Wong Logan Architects · Berkeley

Public records

From the licensing board and the city of San Francisco.

The short answer

Licensed?
License activeArchitect C-15547First issued Mar 12, 1985, expires Oct 31, 2027.

Source: DCA license roster, retrieved Nov 5, 2026

Verify on DCA License Search

Any board discipline?
None found.

We searched the California Architects Board enforcement list on Nov 5, 2026.

Worked in San Francisco?
9 permits since 2020, 9 in the last 5 years. Latest filed Mar 20, 2023.
What kind of projects?
Commercial or tenant improvement 3 · Home remodel 2 · Other 2
How long do their permits take?
Commercial or tenant improvement: 8 months. City typical for the same review: within 1 month.

Permits filed each year

San Francisco permits by the year they were filed. The last 5 years are in blue.

What are you planning?

Pick your kind of project to see their permits for it.

Permits
11 permits that name Marcy Li Wong, newest first, including 2 revisions or supplements that are not counted. Select a permit to see the full record.
FiledProjectOpen
Aug 22, 2023192 Utah St

Revision to bpa#202209092150 for modifications to concrete drag beams

Issued
Mar 20, 2023198 Utah St

Barrier remove only, modify floor slab of (e) interior vestibule to create an accessible entrance. no change proposed to building exterior under this permit

Complete
Sep 29, 2022151 Potrero Av

Patrial demo of a one story plus mezzanine wood framed structure known as area b (199 potrero av) including roof, walls & supporting foundations. site preparation for expansion of (e) adjacent area a (151 potrero) and a new accessible entrance in area a.

Issued
Nov 22, 2021151 Potrero Av

Demolition of a portion of a non-historic loading dock in building b (199 potrero/648 15th st). install pg&e transform on concrete pad. elecrical drawings showing the bus duct & electrical room layout shall follow as separate submittal

Cancelled
May 10, 2021198 Utah St

Revision to pa# 202008262679 to add interior electrical room, replace previouly approved exterior roll up door with louvered swing door, replace prev approved metal infill panel in existing arched entry with a glazed window; electrical review.

Complete
Nov 4, 2020199 Potrero Av

Demolition of structure (area b - 199 potrero st/648 15th st) to accomodate expansion of adjacent area a (151 portero ave).

Withdrawn
Nov 4, 2020151 Potrero Av

Renovation & expansion of existing building 2 (identified on plans as area c, e & lobb) on parcel 004.

Issued
Nov 4, 2020151 Potrero Av

Renovation & expansion of existing building 1 (identified as area a and b) on parcel 004.

Issued
Aug 26, 2020198 Utah St

Core/shell improvements including: accessibility improvement including new accessible building entrey and toilet room. stair to mezznine and exit door, roof improvements, interior finishes.

Complete
Aug 17, 2020198 Utah St

Seismic upgrade triggered by sfbc 403.12.1 & 2, removal of roofing and strengthening of roof deck, reconstruction and strengthening of the existing roof trusses, removal of existing mezzanines and replacement with new mezzanine, strengthening of existing masonry walls and associated foundation work.

Complete
Jun 12, 2020198 Utah St

Secure (e) roof trusses & walls for structural design exploration. safe off (e) electrical. remove previous abandoned process pipes & equipment.

Cancelled

Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.

Are you Marcy Li Wong? Request a correction.