Markus Jose Williams
Engineer · Bureau Of Enginnering · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeCivil Engineer C-88003First issued Dec 19, 2017, expires Mar 31, 2028.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 8 permits since 2024, 8 in the last 5 years. Latest filed May 13, 2026.
- What kind of projects?
- Retaining wall or site work 7 · Home remodel 1
- How long do their permits take?
- Retaining wall or site work: 9 months. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Retaining wall or site work: 7 permits in San Francisco
Time to get a permit
Median from filing to permit, from 7 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 13,561 permits.
Where
- Financial District/South Beach4
- Tenderloin3
Most recent
- 147 Natoma StReplacing and modifying the sidewalk, as well as modifying the sub-sidewalk basement to accommodate the new sidewalk gradesMay 13, 2026Issued
- 149 New Montgomery StReplacing and modifying the sidewalk and abondoining an (e) subsidewalk basement. ref streetscape permit # 2025 exc- 024-3sFeb 9, 2026Issued
- 124 02nd StReplacing and modifying the sidewalk topping slab and the sub-sidewalk basement to accommodete a new street light foundationDec 2, 2025Issued
- 301 Geary StSelective demo and replacement on basement roof slab, concrete sidewalk toping slab and curb ramp replacment. installation of traffic signal and street liight pol with corbel like support on basement wall. no work to facade of building.Nov 12, 2024Issued
- 200 Powell StReplacement of concrete sidewalk topping & regrading of curbramps, installation of steel st light & traffic signal pole w/ steel column support in basement. no work to the building nor facadeOct 28, 2024Issued
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| May 13, 2026 | 147 Natoma St Replacing and modifying the sidewalk, as well as modifying the sub-sidewalk basement to accommodate the new sidewalk grades Issued | Retaining wall or site work | Issued | 4 months | |
| Feb 9, 2026 | 149 New Montgomery St Replacing and modifying the sidewalk and abondoining an (e) subsidewalk basement. ref streetscape permit # 2025 exc- 024-3s Issued | Retaining wall or site work | Issued | 7 months | |
| Dec 2, 2025 | 124 02nd St Replacing and modifying the sidewalk topping slab and the sub-sidewalk basement to accommodete a new street light foundation Issued | Retaining wall or site work | Issued | 1 month | |
| Nov 12, 2024 | 301 Geary St Selective demo and replacement on basement roof slab, concrete sidewalk toping slab and curb ramp replacment. installation of traffic signal and street liight pol with corbel like support on basement wall. no work to facade of building. Issued | Retaining wall or site work | Issued | 9 months | |
| Oct 28, 2024 | 201 Powell St Demolition and reconfiguration of basement roof salb and curb ramps, installation of a traffic signal over basement area and stl column support. no work done to facade or building itself. Issued | Home remodelType unconfirmed | Issued | 9 months | |
| Oct 28, 2024 | 200 Powell St Replacement of concrete sidewalk topping & regrading of curbramps, installation of steel st light & traffic signal pole w/ steel column support in basement. no work to the building nor facade Issued | Retaining wall or site work | Issued | 9 months | |
| Oct 9, 2024 | 111 Ellis St #0 Replacement of brick pavers & curbramp, installation of steel streetlight and steel pole support in basement. Issued | Retaining wall or site workType unconfirmed | Issued | 10 months | |
| Oct 9, 2024 | 101 Powell St Topping sidewalk replacement. installation of traffic signals and support in basement area. installation of traffic signal pedestal and cabinet at sidewalk level. Issued | Retaining wall or site work | Issued | 10 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Markus Jose Williams? Request a correction.