CheckMyDesigner

Michael Dubitsky

Architect · Rapt Studio

Public records

From the licensing board and the city of San Francisco.

The short answer

Licensed?
License activeArchitect C-35493First issued Jan 11, 2016, expires Oct 31, 2027.

Source: DCA License Search, retrieved Nov 5, 2026

Verify on DCA License Search

Any board discipline?
None found.

We searched the California Architects Board enforcement list on Nov 5, 2026.

Worked in San Francisco?
54 permits since 2016, 54 in the last 5 years. Latest filed Oct 2, 2026.
What kind of projects?
Commercial or tenant improvement 47 · Other 4 · Legalize or fix a violation 2
How long do their permits take?
Commercial or tenant improvement: within 1 month. City typical for the same review: within 1 month.

Permits filed each year

San Francisco permits by the year they were filed. The last 5 years are in blue.

What are you planning?

Pick your kind of project to see their permits for it.

Permits
67 permits that name Michael Dubitsky, newest first, including 13 revisions or supplements that are not counted. Select a permit to see the full record.
FiledProjectOpen
Oct 2, 202688 Spear St

9th floor: partial interior ti includes new partitions, doors, ceilings, finishes, and millwork. mep deferred.

Issued
Oct 2, 202688 Spear St

9th fl - interior soft demo of non-bearing partitions, millwork and finishes. approx 12,100 sq ft.

Issued
Sep 30, 2026236 08th St

1st flr. enlarge existing stair vesitibule and add new door into stair, relocate existing mailbox. all interior work.

Issued
Sep 22, 20261 Front St

36th floor: t.i. demo existing partitions, ceilings, doors, and remove existing appliances at currant interior space. provide new non-bearing partitions, ceilings, lighting fixtures, millwork and finishes.

Issued
Jun 25, 2026667 Mission St

Basement level: interior demolition and construction to create new mailroom and mpoe at basement. new lobby and relocation of trash room at 1st floor. mep under separate permit.

Issued
Jun 23, 2026667 Mission St

4/f: tenant improvement to include interior demolition and construction of new partitions millwork and ceiling. mep, life safety and fire sprinkler under seperate permit.

Issued
Jun 23, 2026657 Mission St

4/f: tenant improvement to include interior demolition and construction of new partitions millwork and ceiling. mep, life safety and fire sprinkler under seperate permit.

Issued
Jun 22, 2026657 Mission St

Tenant improvemen on the 6th fl to include interior demolition of drinig fountain guards and storm drain riser. construction of new partition millwork and ceiong. mep under sep.

Issued
Jun 22, 2026667 Mission St

New interconnecting stair between level 4-6

Issued
Jun 22, 2026657 Mission St

Tenant improvement on the 5th fl to include interior demolition and construction of new partitions, millwork, ceiling. drywall coverage at windows overlooking 667 mission. mep, life safety, and fire sprinkler under sep permit.

Issued
Jun 16, 2026400 Montgomery St

2nd floor: ti includes light demo, new conference room, new storage alcore, relocation of mens room door, new breakroom for employee use. mep deferred.

Issued
Jul 9, 2025101 California St

25th/f: partial t.i. of a single suite of an e) high rise

Issued
May 1, 2025730 Montgomery St #0

Minor revision to pa#: 202502210771 to relocate proposed lift and adjust stair width at mezzanine.

Complete
Apr 8, 2025730 Montgomery St

Minor revision to pa #202502210771 to remove deferred fire alarm and fire sprinklers systems from scope.

Complete
Apr 8, 2025730 Montgomery St

Minor modification to existing historic facade. replace existing non-historic store front door. add new surface applied muntins to existing non historic glazing infill to match opposite side.

Complete
Mar 10, 2025730 Montgomery St

Installation of new non electric double-faced projecting sign.

Complete
Feb 21, 2025730 Montgomery St #0

On the first floor full tenant improvement on the second floor. new partial interior improvement mezzanine at the 2nd floor. new finishes, fixtuires, partitions, doors glazing, ceiling. mep deferred.

Complete
Oct 11, 2024101 California St

19th fl: new ti for open office, conference rooms, boardroom, pantry, library & meeting space. bldg is fully sprinklered

Complete
Sep 10, 2024101 California St

Demolition of interior walls, floor and wall finishes in a portion of floor 19, compliance with ab-017.

Issued
Aug 7, 2024101 California St

25th floor: t.i. new non-load bearing interior walls, lighting, finishes and mep.

Complete

Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.

Are you Michael Dubitsky? Request a correction.